Applied cases of advanced construction & engineering technology at Tower Palace III Project (타워팰리스 III 현장의 첨단 시공 및 엔지니어링 기술 적용사례)

  • Wang In-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.202-213
    • /
    • 2003
  • Tower Palace III project is the highest residential and commercial high-rise complex building in Korea. In order to construct a high-rise building, advanced construction and engineering technology is required. Therefore, with more developed construction and engineering technology based upon accumulated knowledge, construction speed of 13.4 days per floor including finish work was achieved in this project. To achieve this project successfully, three main advanced construction technology were applied: 1) Construction methods for 3-day cycle of structural work and curtain wall, 2) Tact scheduling method for finish work, 3) Management system of material, labor, work, and information. Also, four main engineering technology were applied: 1) New material such as high -flowing concrete and high strength concrete of 800 kgf/cm2, 2) New method such as a pipe-cooling system of a cool water circulating type, 3) Mechanical system such as smart-fan controlling kitchen-ventilation system, 4) Electrical system such as false car system.

  • PDF

The application of tact time at finish work for building construction - Focused on Office Building - (건축마감공사에서의 택트타임 설정을 통한 작업조정 프로세스 개발 - 오피스 건축물을 중심으로-)

  • Yoon, You-Sang;Suh, Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.90-97
    • /
    • 2005
  • Poor usage of work-continuity for planning and management is one of the leading causes of decreased productivity in high-rise and complexity construction projects. For efficient finish work, tact scheduling method needs to be implemented according to tact time. But there are the studies about zoning of work area, daily construction information and tact planning and management, there are not the studies about tact time yet. The purpose of this study is to help implementation of tact scheduling by tact time and adjusted work-plan. The main contents of this study are as follow; (1)Tact time has been calculated as coordination of work-plan between a general contractor and specialties. (2)Project-plan can be without delay by tact time calculation method.

Granite Strength Estimation of Construction Considering Surface Roughness Effect on Ultrasonic Velocity Method (화강석 건조물의 표면 거칠기별 초음파속도법에 의한 강도 추정)

  • Kim, Jeong-Sup;Shin, Yong-Seok;Kim, Jeong-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.137-145
    • /
    • 2010
  • The mechanical properties of stone structures are generally characterized according to the strength of the stone used. An ultrasonic velocity method that does not damage cultural heritages is used to measure the strength of stone. However, there is no correction involved for surface roughness and thickness of the stone in the ultrasonic method currently used. In addition, a contact agent such as grease can cause contamination on the surface of a cultural heritage. Accordingly, this study suggests an indirect method of strength estimation formula for stone structures based on the surface roughness of the structure, its thickness, and the type of contact agent. (1) Rock strength estimation formula using ultrasonic velocity method of dabbed finish : $f_{su}=30.51\;Vp^{0.82}(R^2=95)$ (2) Rock strength estimation formula using ultrasonic velocity method of harsh finish : $f_{su}=61.52\;Vp^{0.32}(R^2=92)$.

A Proposal of Modeling Guide of the Unit Space-based Preliminary Cost Estimation in Urban Renewal Mix-Used Development - Case Study on ○○ Transfer Station Complex - (복합용도 개발 도시재생 사업에서의 단위 공간 기반 개산견적 모델링 가이드 제안 - ○○시 ○○역 복합환승센터 사례를 중심으로 -)

  • Kang, Shin-Yeop;Ahn, Jae-Hong;Kim, Ju-Hyung
    • Journal of KIBIM
    • /
    • v.3 no.1
    • /
    • pp.11-20
    • /
    • 2013
  • Mix-used development in urban renewal project is done to effectively utilize the limited downtown. Generally unlike a single project, It features placing a large number of different facilities(residential, commercial, business, cultural, etc.) which is each other organically linked. The purpose of this study is to suggest the method of modeling guide for 3D preliminary cost estimation considering visual and intuitive judgement of space in mix-used development Urban Renewal project. In this research, introducing SME(Standard Module and Element) breakdown structure, FID(Finish Identity) for estimating building space unit-based quantity take off was implemented. It could narrow the discrepancy of opinion between the stakeholders with more accurate cost-estimates, comparing to the traditional methods.

Masonry work interference factor deduction based on daily report data analysis (작업일보 데이터를 활용한 조적공사 작업간섭 요소 도출)

  • Park, Min Ha;Lee, Hye Lin;Ko, Yong-Ho;Han, SeungWoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.172-173
    • /
    • 2015
  • Construction project involves numerous repetitive operations. Especially in high-rise and apartment houses projects, the amount of repetitive operations increase and a preceding operations delay causes serious damage to the total duration of the project. This study deducts work delay factors by site engineer interview and survey. The study analyzes daily report data to deduct crucial processes affecting masonry work which has been investigated to be one of preliminary processes conducted at the beginning of finish work.

  • PDF

Correlation analysis of the quality and civil construction engineer in apartment house (공동주택 토목공사의 책임기술자와 품질의 상관관계 분석)

  • Jeong, Sangl-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.70-71
    • /
    • 2015
  • Construction period is longer than the non-disclosure in civil construction of apartment house. And this process is intensive at the beginning and end of construction. Because this project management expertise is required. Nevertheless, subsidiary work(Working avoid a tendency of advanced technician, Frequent turnover and employment contracts, etc.) management attention of construction is at a lower level. Because of, there are the bad factors(trial and error, finish degradation, etc.). Therefore, this study analyzed Hindrance Factor of quality control on apartment complex construction work and presented importance of civil construction engineer's role. Also, forms of civil construction engineer, Performance experience and technical Strength of apartment complex construction was investigated for the construction. To this end, It analyzes the relationship between forms of civil construction engineer, Performance experience and technical Strength of apartment complex construction and Construction of evaluation as required by Construction Technology Management Act.

  • PDF

Development and Performance Evaluation of Floor Level Joint System (다목적 바닥 레벨조인트 공법의 개발 및 성능평가에 관한 연구)

  • 최윤철;서수연;지남용;이리형
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.05a
    • /
    • pp.953-958
    • /
    • 2002
  • The finishing method of concrete floor using automatic surface finisher is one of new technologies in concrete floor construction. The development of high technologies in construction will increase in order to satisfy the demand to construct high quality building. Using this method, it is possible to increase the quality of building as well as to reduce the labor work in site. In this paper, a system which can be used to finish the concrete floor using automatic surface finisher, is presented and its structural capacities are evaluated. The system is composed of rail which guides the surface vibrator and absorbs the volume change of concrete, and a device supporting the rail. From the experimental work for these devices, it was shown that the support and rail had suitable strength to resist the automatic surface finisher. For design purpose, also, effective span of supports was tabulated.

  • PDF

Unsteady Analysis of Indoor Radon in Apartment Buildings Considering Finishing Materials and Ventilation (마감재 및 환기를 고려한 공동주택 실내 라돈 농도의 비정상 해석)

  • Cho, Hyun;Pang, Seung-Ki
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.15 no.4
    • /
    • pp.24-31
    • /
    • 2019
  • In this paper, we simulated a new apartment building by using radon emission test values from various building materials used as interior finishing materials. The simulations evaluated the radon concentration in the room according to the radon emissions and the ventilations for each type of finishing material (gypsum board, stone, tile and concrete). Overall concrete finish simulation case showed the highest concentration than the case using other materials due to the effect of wall area at the center of each room and the mean radon concentration at 1.5 m above the floor was slightly lower than the mean value at each center. In the case of the porch, pantry and bathroom, the radon concentration was high even when the same materials were used as in the other rooms.

A Case Study On The Suitability Of Drawings Through Application Of BIM In Construction Management (건설사업관리 분야에서 BIM적용을 통한 도서의 적합성 검토 사례)

  • Park, Young-Jin;Song, Kyung-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.33-34
    • /
    • 2017
  • The purpose of this case study is to reduce the flaw and reconstruction occur at the level of construction by determining the propriety of estimate and error on a drawing and specification at working design level through case studies of BIM application at the level of design review. As a preliminary to apply BIM technology, it is needed to review the drawing, and then it is required to define BIM range by selecting the section in which construction error occurs frequently except for the type of part that is constructed repeatedly. At the execution level, the drawing is reviewed vertically, horizontally and spatially by proceeding structure and finish modeling on the defined BIM range, and also the propriety of estimate and error on the drawing and specification are examined. We aim to raise the completion rate, improve quality of construction, reduce the cost for construction and shorten period of construction by preparing for the error on the drawing and specification in advance through this review procedures.

  • PDF

The Properties of Rheology of Underwater-Hardening Epoxy Resin According to the Temperature (온도에 따른 수중경화형 에폭시수지의 레올로지 특성)

  • Jung Eun-Hye;Kang Cheol;Kawg Eun-Gu;Bae Kee-Sun;Lee Dae-Kyung;Kim Jin-Man
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.05a
    • /
    • pp.49-52
    • /
    • 2006
  • Epoxy resin has less reaction shrinkage, has better water proofing and thermal resistance than other repairing materials, to it has been applied broadly to repair and finish buildings and infrastructures. Although the ambient temperature constructed is varied with the seasons and epoxy resin has to mix with appropriate hardener due to the non self-hardening, as the real construction of it, the ambient temperature is ignored and the blending ration of epoxy resin and hardener is fixed. Also, because of the hardening time is aimed to temperature condition and the tolerance of blending ratio, we investigated the variation of viscosity according to ambient temperatures and hardener ratios. As a results of study, we can select the economical blending ratio of the epoxy resin and hardener according to site situation.

  • PDF