• Title/Summary/Keyword: build

Search Result 9,152, Processing Time 0.03 seconds

Effects of Body Build on Metabolic and Physiological Function in Men and Athletes - 1. Especially on the Metabolic Function -

  • Lee, Ok-Hee;Lim, Soon-Gill;Lee, Jung-Hee
    • Nutritional Sciences
    • /
    • v.2 no.2
    • /
    • pp.93-101
    • /
    • 1999
  • The aim of this study was to investigate influence of body build on body composition, energy metabolic state and insulin concentration of blood. 29 male athletes and 36 male non-athletic students were recruited for the study. Anthropometry including chest depth and breadth, fat mass, fat fee mass, tricep skinfold thickness were measured. fasting glucose, lactate, triglyceride, fee fatty acid, and insulin concentration in serum were measured . Body build was assessed using metric index, which calculated by regression equations of Mohr and Greil. The athletic and non-athletic students were allocated to 3 body build, that is leptomorph, mesomorph, and pyknomorph. Resting metabolic rate was calculated. Respiratory quotient was determined through ratio of measured VO$_2$, and V$CO_2$. Most non-athletes have a leptomorphic body build, in contrast to athletes mesomorphic type. The body build type influenced body composition differently between non-athletic group and athletic group. Weight, body mass index, body fat mass and fat mass proportion (%), and fat-free mass increased from leptomorph to pyknormorph in non-athletic group. Pyknormorphic athletes have a significant higher body mass index, fat mass, fat free mass than other body build type. Serum glucose, triglyceride, lactate, insulin showed significant differences only in non-athletic group between leptomorph and mesomorph. RMR increased significantly from leptomorph to mesomorph in non-athletes. There was no significant difference of RQ among 3 body build types in both athletes and non-athletes. This study gives a coherent data on body build and body composition for athletes and non-athletes students. The influence of body builds on energy metabolic status of serum was different between athletes and non-athletes.

  • PDF

A Study on the Success Model for Design-Build Delivery Method Process (설계시공일괄방식 프로세스 성공모델에 관한 연구)

  • Kim Jeong-Hoon;Koo Kyo-Jin;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.119-127
    • /
    • 2003
  • Among project delivery methods, Design-Build method is becoming an increasingly preferable alternative to traditional contracting method. The Design-Build delivery method was first introduced in Korea, 1975. But it still has been producing many problems. The previous researches had been suggested several ways to improve the Design-Build project delivery but it seemed to have had no effect whatsoever. This research proposes the success model for Design-Build delivery method through the 4 steps. First, find the proper modeling method. Second, establish the As-Is model for analyzing the circumstances of Design-Build method. Third, to begin with analyzing the As-Is Design-Build model and previous researches, establish the problem model. Finally, find success factors and circumstances through the overseas Design-Build system, and then establish the success Design-Build model.

Analysis of pollutant build-up model applied to various urban landuse

  • Choi, Jiyeon;Na, Eunhye;Ryu, Jichul;Kim, Jinsun;Kim, Hongtae;Shin, Dongsuk
    • Membrane and Water Treatment
    • /
    • v.10 no.1
    • /
    • pp.13-17
    • /
    • 2019
  • This study was conducted to analyse the application of pollutant build-up model on various urban landuses and to characterize pollutant build-up on urban areas as a source of stormwater runoff pollution. The monitored data from impervious surfaces in urban areas such as commercial (8 sites), industrial (10 sites), road (8 sites), residential (10 sites), recreational (5 sites) from 2008 to 2016 were used for the analysis of pollutant build-up model. Based on the results, the average runoff coefficients vary from 0.35 to 0.61. In all landuses except recreational landuse, the runoff coefficient is 0.5 or more, which is the highest in the commercial area. Commercial landuse where pollutants occur at the highest EMC in all landuse, and it is considered that NPS management is necessary compared with other landuses. The maximum build-up load for organic matter (BOD) was highest in the commercial area ($4.59g/m^2$), and for particular matter (TSS) in the road area ($5.90g/m^2$) while for nutrient (TN and TP) in the residential area ($0.40g/m^2$, $0.14g/m^2$). The rate constants ranged from 0.1 to 1.3 1/day depending on landuse and pollutant parameters, which means that pollutant accumulation occurs between 1 and 10 days during dry day. It is clear that these build-up curves can generally be classified based on landuse. Antecedent dry day (ADD) is a suitable and reasonable variable for developing pollutant build-up functions. The pollutant build-up curves for different landuse shows that these build-up curves can be generally categorized based on landuse.

Development of Build-up Printed Circuit Board Manufacturing Process Using Rapid Prototyping Technology and Screen Printing Technology (쾌속조형과 스크린 인쇄기술을 이용한 빌드업인쇄회로기판의 제조공정기술개발)

  • 조병희;정해도;정해원
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.17 no.2
    • /
    • pp.130-136
    • /
    • 2000
  • Generally, the build-up printed circuit board manufactured by the sequential process with etching, plating, drilling etc. requires many types of equipments and lead time. Etching process is suitable for mass production, however, it is not adequate for manufacturing prototype in the developing stage. In this study, we introduce a screen printing technology to prototyping a build-up printed circuit board. As for the material, photo/thermal curable resin and conductive paste are used for the formation of dielectric and conductor. The build-up structure is made by subsequent processes such as the formation of liquid resin thin layer, the solidification by UV/IR light, and via filling with conductive paste. By use of photo curable resin, productivity is greatly enhanced compared with thermal curable resin. Finally, the basic concept and the possibility of build-up printed circuit board prototyping are proposed in comparison with to the conventional process.

  • PDF

Study of Cure Properties in Photopolymer for Stereolithography using Various Laser Bean Size (레이저빔 직경변화에 대한 광경화성 수지의 경화특성 고찰)

  • 이은덕;김준안;백인환
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2001.04a
    • /
    • pp.1089-1092
    • /
    • 2001
  • In the stereolithography process, build parameters are laser power, scan velocity, scan width, bean diameter, layer thickness and so on. These values are determined according to product accuracy and build time. Build time can be reduced by improving of scan velocity, laser power, layer thickness, hatching space and so on. But variation of these parameters influence part accuracy, surface roughness, strength. This paper observed cure properties in various beam diameter. In order to examine these, relationships of scan velocity and cure depth, scan velocity and cure width according to various beam diameter in one scan line are measured. And cure thickness is measured according to beam diameter and scan velocity in scan surface of one layer. For reduction of build time, beam diameter and scan velocity is proposed in stereolithography process.

  • PDF

New Zero-Voltage-Switching Method for High Efficiency Half-Bridge Converter (새로운 영전압 스위칭 방식을 이용한 고효율 하프-브릿지 컨버터)

  • Lee Sung-Sae;Moon Gun-Woo
    • Proceedings of the KIPE Conference
    • /
    • 2006.06a
    • /
    • pp.25-27
    • /
    • 2006
  • This paper proposes a new full ZVS-range asymmetrical half bridge converter. It uses the variable transient current build-up technique with the load variations. The current build-up is accomplished by using the secondary synchronous switch control. Due to the blocking capacitor in secondary side, the voltage applied to leakage inductor varies with the load variations during current build-up period. Therefore, the unnecessary current build-up of leakage inductor current in heavy load condition is prevented and more current build-up in medium and light load condition is achieved for ZVS operation. That is, the variant current build-up with the load variation is accomplished for the ZVS operation. Furthermore, the DC offset of the transformer magnetizing current is also eliminated and the utilization of magnetic core is maximized.

  • PDF

Preliminary Study on the Factors Analysis of Change Order-Claim in Design-Build Project (설계시공일괄입찰공사의 설계변경 클레임요인 분석에 관한 기초 연구)

  • Ryu, Hyeok-Jun;Park, Byung-Ju;Yoo, Seung-Kyu;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.129-130
    • /
    • 2012
  • Although the order of Design-Build is being expanded by increasing construction scale and demanding hybrid function, the suitable regulation of the contracts is not settled. Design-Build is way by government because there are big construction of much government leading in contract relation high position occupy. So, case that prebendary's claim institution develops by litigation is very rare. But, recently Design-Build is magnified. So, these dispute factors is becoming visualization gradually. The contract system is needed to be consistent by international standard to deal with the problem. This study suggests the useful solutions in detail concerned with the main factor of change order claim by each Design-Build phases through practical sorting and analysis of the causes of Change Order-Claim.

  • PDF

THE RECENT TREND OF BUILD-UP PRINTED CIRCUIT BOARD TECHNOLOGIES

  • Takagi, Kiyoshi
    • Journal of Surface Science and Engineering
    • /
    • v.32 no.3
    • /
    • pp.289-296
    • /
    • 1999
  • The integration of the LSI has been greatly improved and the circuit patters on the LSI are becoming finer line and pitch. The high-density electronic packaging technology is improved. In order to realize the high-density packaging technology, the density of the circuit wiring of the printed circuit boards have also been more dense. The build-up process multilayer printed circuit board technology have a lot of vias, possibilities of the finer conductor wirings and have a freedom of capabilities of wiring design. The build-up process printed circuit boards have the wiring rules which are the pattern width: $100-20\mu\textrm{m}$, the via hole diameter: $100-50\mu\textrm{m}$. There three kinds of build-up processes as far materials and hole drilling. In this paper, the recent technology trends of the build-up printed circuit board technologies are described.

  • PDF

Improvement of the Design-Build Bidding in the Domestic Construction Industry (국내 설계시공일괄입찰방식 개선방안)

  • Kim Su-Hyun;Jeon Min-Jeong;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.410-413
    • /
    • 2003
  • In order to build up competitive power in construction market and to cope with international policy, Design-Build bidding is one of the viable bidding system, encouraging collaboration between design office and building construction firm. Design-Build is a promising delivery system to help expediting schedules, saving costs, and improving Quality. However, the problems of Design-Build project in the domestic construction industry are not to be able to take advantages of fast-tracking and value engineering process, because of the problems of inappropriate system and participants' inexperience. The purpose of this study is to suggest alternatives for Design-Build bidding of public sector in the domestic construction industry in the costs, quality and time aspect.

  • PDF

A Model for Deciding Evaluation Weights in Design-Build Delivery Method (일괄입찰방식의 적격심사분이별 배점 결정모델 개발)

  • Kim Man-Chul;Koo Kyo-Jin;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.91-100
    • /
    • 2005
  • Design-build that a single entity performs whole construction process under singular responsibility is one of the project delivery system comes to take expectation effects of time savings, cost saving, and quality assurance. On the other hand, a current domestic method for selecting a design-build contractor is difficult to reflect the purpose of owner and the project characteristics when owner selects the design-build contractor. The purpose of this research is to suggest a model for deciding evaluation weights in design-build which can reflect the purpose of owner and the project characteristics. This research can help owner to select the best suitable design-build contractor for the project.