• Title/Summary/Keyword: budget system

Search Result 1,484, Processing Time 0.027 seconds

A Comparative Study on the Determinant of Fire Service Budget and Police Service Budget (소방예산과 경찰예산의 결정요인에 관한 비교연구)

  • Kim, Jin-Dong
    • Fire Science and Engineering
    • /
    • v.24 no.3
    • /
    • pp.119-130
    • /
    • 2010
  • In the fire and disaster prevention administration of which is not developed in comparison with any other administrative system, the systematic improvement is necessary. For system's more development, financial resource of fire service must be increased sufficiently. If fire service's budget is not allocated sufficiently, fire and disaster were not prevented effectively. This study set up hypothesis based on theoretical background and past research. In this study, dependent variables are fire service budget and police service budget per person Whereas independent variables include demand characteristics, economical characteristics, political characteristics, and previous fiscal year's budget. Statistical methods for the hypothesis's verification are regression analysis, correlation analysis and t-test. The major finding on this study are as follows: First, regression analysis showed that significant variable were past budget variable and economical variable. But political variable and demand variable were not significant except for a emergency medical variable. Second, fire service budget's average was not different significantly from police service budget's average. The above result are contingent upon the theory described in this research. A sustained research and development effort will be necessary if substantial and meaningful progress is to be made in fire service budget.

The Characteristics and Limitations of 'Automatic Submission of Budget Bills to Plenary Session', Article 85-3 of the National Assembly Act (국회법 예산안 자동부의제의 성격과 한계)

  • Jung, Jinwung
    • Korean Journal of Legislative Studies
    • /
    • v.24 no.1
    • /
    • pp.103-133
    • /
    • 2018
  • This paper examines whether the budget making process has improved since the Automatic Submission of Budget Bills to Plenary Session Act was enacted. The budget bill was passed before the Dec. 2 deadline from 2014 to 2016. Several researchers, therefore, concluded that the clause is in favor of the ruling party and the majority party. However, this study confirmed that the argument is valid only under the condition of unified government. In other cases, the government party can have a limited impact on the budget-review process, and the aspects of the budget screening process are similar to those before the Act was enforced. Under the conditions of the divided government and two-party system, it is difficult that the budget bill is passed by the legal deadline. In the case of the divided government and multi-party system without majority party, the third party exerts a very significant influence on the budget-review process.

HSDPA Sector Throughput Analysis With Modified Link Budget (Link budget을 이용한 HSDPA 시스템의 sector throughput 분식)

  • Yi Yo-Serb;Kim Sang-Bum;Hong Dae-Hyung;Jang Byung-Lyerl;Moon Soon-Joo
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.31 no.5A
    • /
    • pp.469-474
    • /
    • 2006
  • In this paper, we develop a method that derive the average sector throughput of HSDPA system. This proposed method reflects the effects of AMC, scheduling and multi-code transmission, and is performed by simple calculation procedures such as link budget analysis. Link budget table is used to estimate a cell coverage in general. We modify the link budget table in order to calculate C/I of the user according to the location of the user in CDMA packet system employing AMC. Furthermore, we utilize the proposed method to analyze the effects of scheduling and multi-code transmission.

Determining the Proper Level of Concurrent Spare Parts under Budget Constraint (예산제약하에서의 동시조달수리부속의 적정소요 산출)

  • Kim, Young-Ho;Chong, Il-Gyo;Jun, Chi-Hyuck
    • IE interfaces
    • /
    • v.14 no.3
    • /
    • pp.286-295
    • /
    • 2001
  • This paper addresses the problem of determining the proper level of concurrent spare parts(CSP) for a system consisting of multi-item parts under an available budget constraint. Initial provisioning of spare parts plays a major role in the acquisition of a new equipment system. Therefore, the proper level of spare parts should be on hand to maintain the availability of the system. This paper proposes a new CSP model and solution procedure that determines the proper level of spare parts satisfying the item priority and simultaneously available budget constraint.

  • PDF

A STUDY ON FUEL ESTIMATION ALGORITHMS FOR A GEOSTATIONARY COMMUNICATION & BROADCASTING SATELLITE

  • Eun, Jeong-Won
    • Journal of Astronomy and Space Sciences
    • /
    • v.17 no.2
    • /
    • pp.249-256
    • /
    • 2000
  • It has been developed to calculate fuel budget for a geostationary communication and broadcasting satellite. It is quite essential that the pre-launch fuel budget estimation must account for the deterministic transfer and drift orbit maneuver requirements. After on-station, the calculation of satellite lifetime should be based on the estimation of remaining fuel and assessment of actual performance. These estimations step from the proper algorithms to produce the prediction of satellite lifetime. This paper concentrates on the fuel estimation method that was studied for calculation of the propellant budget by using the given algorithms. Applications of this method are discussed for a communication and broadcasting satellite.

  • PDF

An Analysis of UAV LOS Datalink at Different Geography and Weather (지형과 기후에 따른 무인기용 가시선 데이타링크 분석)

  • Lee, Hyeon-Cheol;Jo, Tae-Gyun
    • Proceedings of the IEEK Conference
    • /
    • 2006.06a
    • /
    • pp.103-104
    • /
    • 2006
  • In this paper, we analyze the UAV datalink design with calculating link budget of long-distance (200 km) Ku-band LOS wireless link. We calculate C/N of the real system and compare it with the required C/N, using the CCIR reports. In the rainy day of summer on the Korean peninsula, to maintain percent reliability 90% and BER 10^(-5) together, link budget of uplink of the system has a lot of margin at 200 km, link budget of downlink using the block turbo code is enough for distance 200 km.

  • PDF

The Relationship Between Fire Service Demand and Project Budget (소방수요와 사업비예산과의 관계)

  • Kim, Jin-Dong;Kim, Hyung-Doo
    • Fire Science and Engineering
    • /
    • v.21 no.3
    • /
    • pp.24-32
    • /
    • 2007
  • The environment of fire service is more uncertain as cities become complicated and new combustibles are used. If fire service's budget is not allocated sufficiently for fire facilities and equipment, fire service's quality and firefighter's safety are affected seriously. Therefore project budget must be increased to prevent fire and disaster effectively. This study investigate the change of fire service demands, the change and priority of fire service budget and project budget. And this study examined the relationship between fire service demand and project budget using correlation and regression analysis. Analysis showed that a number of rescue and emergency medical service were significant variable for project budget.

Asset Evaluation Method for Road Pavement Considering Life Cycle Cost (생애주기비용을 고려한 도로포장의 자산가치 평가에 대한 연구)

  • Do, Myungsik;Kim, Jeunghwan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.1D
    • /
    • pp.63-72
    • /
    • 2009
  • This study aims at establishing the decision-making support system for the highway assets, long-term performance presumption and evaluation of asset value, which are appropriate for Korea, and proposing the methods of the optimal engineering method and the timing decision for the preventive maintenance through the project evaluation, the optimization method and life-cycle analysis related to the highways. In order to supplement the current problem of the near-sighted budget management system, which chooses the maintenance place of the highway, depending on the level of the budget with fixed amount, the long-term required budget prediction system and the economy principle were introduced, so that the pavement agency can predict the level of the required budget, and it was aimed to develop the pavement asset evaluation system to maintain the performance of the highway with the minimum of the cost. In the use of the highway pavement asset evaluation system, to maintain the appropriate level of the pavement evaluation index, when the budget was efficiently established in the reference of the required maintenance budget for the chosen section of the highway in the year concerned, it was possible to analyze the most rational pavement maintenance budget. With this result, it is estimated to prevent the unnecessary waste of budget in advance, and through the development of the decision-making system for the long-term performance presumption and the asset value estimation of the pavement, it is expected to able to analyze the previous evaluation of the project related to the highway and the feasibility of introduction.

Link Budget of WAVE Communication System for a Reliable ITS Service under Highway Environments (고속도로 환경에서 안정적인 ITS서비스를 위한 WAVE 통신 시스템 link budget 분석)

  • Song, Yoo-seung;Yun, Hyun-jeong
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.14 no.4
    • /
    • pp.80-85
    • /
    • 2015
  • The era of intelligent transportation system(ITS) has been arrived by applying information and communication technology(ICT) to the traffic. One of these technological advances is a wireless communication technology for a high speed vehicle to be connected to an infrastructure(V2I). A variety of road traffic safety services and operator comfort services are being developed by means of WAVE(Wireless Access in a Vehicular Environment) based on IEEE802.11p Standard. In this paper, the link budget is analyzed to provide a reliable quality of these ITS services. Log-distance model and two-ray model is employed for the wave propagation path loss model which is adequate for a highway environment. Reliable cell coverage is suggested for ITS services from the link budget.

Bridge Appropriate Maintenance Budget Allocation Considering Safety and Service Life (교량 안전성과 공용년수를 고려한 적정 보수보강 예산 배분)

  • Sun, Jong-Wan;Lee, Huseok;Park, Kyung-Hoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.11
    • /
    • pp.130-137
    • /
    • 2017
  • To maintain traffic safety during the target lifetime of bridges, it is essential to secure an appropriate maintenance budget and allocate that budget appropriately. This paper proposes a reasonable budget allocation system that considers various impact factors to improve the conventional budget allocation method simply considering the bridge scale. The maintenance action rate model and the unit cost model based on the prior maintenance history were developed to allocate appropriately the bridge maintenance budget for the total bridges of the management organization with the target management level. A method to determine the optimal budget allocation ratio for each management subject was proposed and case analysis was conducted using the proposed model. Proper budget allocation was made considering the bridge types, current safety level, and service life as well as the bridge size as an impact factor of the budget allocation of the bridge. The developed method can prevent budget waste and provide a rational basis for budget allocation by implementing the rational budget distribution.