Determining the Proper Level of Concurrent Spare Parts under Budget Constraint

예산제약하에서의 동시조달수리부속의 적정소요 산출

  • 김영호 (공군대학교 전쟁모의처) ;
  • 정일교 (포항공과대학교 산업공학과) ;
  • 전치혁 (포항공과대학교 산업공학과)
  • Published : 2001.09.30

Abstract

This paper addresses the problem of determining the proper level of concurrent spare parts(CSP) for a system consisting of multi-item parts under an available budget constraint. Initial provisioning of spare parts plays a major role in the acquisition of a new equipment system. Therefore, the proper level of spare parts should be on hand to maintain the availability of the system. This paper proposes a new CSP model and solution procedure that determines the proper level of spare parts satisfying the item priority and simultaneously available budget constraint.