• Title/Summary/Keyword: bridge projects

Search Result 107, Processing Time 0.023 seconds

A Benchmarking Study on CM Fee Estimation (해외사례 벤치마킹에 기반한 국내 CM 대가체계 개선 시사점 도출)

  • Kim, Sang-Bum;Lee, Jeong-Dae;Kim, Jae-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.96-106
    • /
    • 2008
  • The Korean Construction Industry significantly contributed to the Korean economic development not only by preparing the domestic infrastructure but also by successfully conducting various international projects. However, major incidents such as the collapse of Sung-Su Bridge and Sam-Pung Department Store along with stagnation of Korean Economy have raised questions about underlying systematic problems of the Korean Construction Industry. As a solution to resurrect the Korean Construction Industry, the Construction Management (CM) system introduced in late 1990's and increasingly utilized as an innovative delivery system. Despite of the fast growth of CM, the performance of CM has not been up to the hype and low CM fee has been identified as one of the main reasons of unsatisfactory CM performance. Therefore, this research attempted to propose ways of improving 'CM Fee Guidelines' published by Korean Ministry of Construction and Transportation by conducting a benchmarking study on Global Standards of estimating CM Fee. International organizations benchmarked in this research include CMAA, ASCE, DOL, DOE, etc. Various investigation and analysis revealed that Korean 'CM Fee Guidelines' need to significantly modified comparing to Global Standards. This research also tried to prepare recommendations to improve the CM deliver system focusing on the 'Method of CM Fee Estimation' and Selection of a CM firm as an owner's agent.

A Study on Applying Information Framework for BIM Based WBS -Focusing on Civil Construction- (BIM기반의 WBS 구축을 위한 정보프레임워크 도입방안 연구 -토목사업의 적용을 중심으로-)

  • Nam, Jeong-Yong;Jo, Chan-Won;Park, So-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.11
    • /
    • pp.770-777
    • /
    • 2017
  • Building information modeling (BIM) has been receiving attention as an integrated information model instead of CAD since the 2000s. BIM technology was first used in the architectural field and was later introduced to the civil engineering field. However, the government announced a plan for the application of BIM to 20% of all SOC projects from 2020, so the adoption of BIM technology is expected to accelerate. In order to successfully adopt BIM, a systematic structure should be supported for integrated design information and implementation technology. Also, it is important to establish the relationship between information systems because many complicated factors are intertwined in the construction industry. In this study, we propose a framework for constructing integrated information through identifying the information relations for introducing BIM in the civil engineering industry. We applied this framework to a bridge project to confirm its effectiveness. This study can be applied to the integrated management of the construction process and costs by introduction of a work breakdown structure (WBS) to BIM. In addition, this study is expected to contribute to the adoption of BIM in the civil engineering field through the proposal of information system standardization in this field.

The Process of Urban Development of Chilgok District in Daegu City (대구시 칠곡지구의 도시발달)

  • Jin, Won-Hyung
    • Journal of the Korean association of regional geographers
    • /
    • v.10 no.1
    • /
    • pp.83-95
    • /
    • 2004
  • Chilgok District is a historical area, which has had a certain amount of development. It has its own regional characteristics originating from its isolation from the existing built up area of Daegu City by the Kumho River This study explores the historical development processes and pending development issues of Chilgok District. In 1640 after the Japanese invasion of Korea in 1592, the district upgraded into Chilgok Dohobu due to its importance as a transportation hub of Youngnamdaero(the main road of Youngnam province in Chosun Dynasty). In its early stages, the government office was located in Kasan fortress, later the of office was moved to Eupnae-Dong. The Chilgok district has experienced a developmental lag resulting from the office's removal to Waegwan, located on the Kyungbu railroad since 1914. Later, due to the increasing influence of nearby Daegu City, urbanization continued gradually. Finally in 1981 Chilgok district was officially incorporated into Daegu Metropolitan City. In the later 1980s, the housing land development project was applied into the district centered on the alluvial plain of Palgeo-Cheon(stream) of the Northern part of Taejun-Bridge. Although the old built up zone was excluded from public sector development projects, private sector development has made the zone a modern town. Now, Chilgok district has transformed into a high-density residential new town in which high-rise apartment complexes mingle with numerous houses. As the district has developed, traffic jams have become a hot issue and it is going to get worse than now as the development continues. To solve this problem, Daegu city needs to swiftly construct the fourth belt way and the third subway line.

  • PDF

Case Study of Civil-BIM & 3D Geographical Information (3차원 지형자료와 토목 BIM의 사례적용 연구)

  • Park, Jae-Sun;Pyeon, Mu-Wook;Jo, Jun-Ho;Lee, Gun-Ho
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.29 no.6
    • /
    • pp.569-576
    • /
    • 2011
  • Recently the establishment of high accuracy 3D spatial information has been largely stimulated according to the increase in need of such 3D spatial information. In the fields of constructions and civil works, studies on increasing the productivity in these fields through converging them with other fields using the established 3D spatial information have been conducted. In such a tendency, BIM (Building Information Modeling) technologies have been rapidly applied to the fields of constructions and civil works. In particular, in the fields of constructions and civil works that represent a life span of plan-design-construction-maintenance, some BIM application methods and plans for the characteristics in each step have been proposed. Thus, the objective of this study is to simulate a project that is reasonable and can be optimized in connection with 3D spatial information and BIM technologies escaped from the conventional civil construction process that is based on empirical, statistical DB, and 2D information. For achieving this objective, 3D terrain data for the subject area engaged in this study using aerial photographs and airborne LiDAR was established. Also, a counter plan for the issues, which cannot be solved in the conventional methods for managing civil work projects, is applied through implementing bridge-based civil structure BIM by combining them with objective information.

Capacity of Distribution Science and the Energy Distribution Role for Visegrád Group Cooperation (비셰그라드 그룹의 협력에 따른 유통과학의 역량과 에너지유통의 역할)

  • Seo, Daesung
    • Journal of Distribution Science
    • /
    • v.13 no.12
    • /
    • pp.95-103
    • /
    • 2015
  • Purpose - The Visegrád Group cooperation of the past 14 years and that of V4 for the past 20 years has very important significance in the 21st century that must be maintained. This cooperation is valuable because of the trade routes that connect northern Poland to the Balkans in southern Croatia, which forman important basis for the resuscitation of Central European development. Currently, because of the European manufacturing base and industrial development, an energy supply and stable energy distribution networks have been introduced to secure cooperation and not competition within the Visegrád Group. This paper's research emphasizes the supply chain hub in neighboring countries. Although Central and Eastern European countries are small, they can provide a competitive response to Western Europe if they collaborate with the V4 group and other countries. Research design, data, and methodology - The subjects of this study in the Visegrád Group area are related to the development of Marketing and Distribution Sciences in the integrated European Union. In relation to the existing energy infrastructure, construction companies and financial institutions benefit from large-scale construction projects. Existing or new infrastructure facilities among the V4 must comply with the preconditions of regional energy markets. The network of emerging markets is changing into a European-logistics hub of new markets. This hub is closely associated with the economic development of European self-sustainment given that energy for distribution and consumption is imported from Russia. Therefore, this paper indirectly provides data on the regional distribution of energy as alternative bases in Europe for market expansion to Asia. Results - As a result, it appeared unlikely that V4 failed to implement homogeneity following the standards of Western Europe, as proposed by the EU. Throughout European history, individuals have gathered in Central Europe as an innovation hub. Currently, the region is being established independently for energy industrial development and not for tourism development, and is expected to play a central role in innovation and distribution consumption. Therefore, similar to Western and Northern Europe, V4 only appears to engage in distribution consumption on the basis of the identity that it formed for itself. This area is expected to either create a regional platform or a voice over a single economic policy. Conclusions - To this end, regarding the distribution of consumer groups within and outside the region, the V4 group is expected to be established for various policy areas and as a Eurasian outpost of trade and distribution logistics. In addition, given its purpose of engaging in the distribution of energy cooperation and trade clusters, the Visegrád Group will be in charge of the center axis of the bridge for distribution logistics trading partners from the Western Balkans to Caucasus and Eastern Europe. Thus, the Visegrád Group is entering this region as a platform for market share by enabling all or any investor can gain greater industrial benefits.

Suggestion of Modified Compression Index for secondary consolidation using by Nonlinear Elasto Viscoplastic Models (비선형 점탄소성 모델을 이용한 2차압밀이 포함된 수정압축지수개발)

  • Choi, Bu-Sung;Im, Jong-Chul;Kwon, Jung-Keun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.1115-1123
    • /
    • 2008
  • When constructing projects such as road embankments, bridge approaches, dikes or buildings on soft, compressible soils, significant settlements may occur due to the consolidation of these soils under the superimposed loads. The compressibility of the soil skeleton of a soft clay is influenced by such factors as structure and fabric, stress path, temperature and loading rate. Although it is possible to determine appropriate relations and the corresponding material parameters in the laboratory, it is well known that sample disturbance due to stress release, temperature change and moisture content change can have a profound effect on the compressibility of a clay. The early research of Tezaghi and Casagrande has had a lasting influence on our interpretation of consolidation data. The 24 hour, incremental load, oedometer test has become, more or less, the standard procedure for determining the one-dimensional, stress-strain behavior of clays. An important notion relates to the interpretation of the data is the ore-consolidation pressure ${\sigma}_p$, which is located approximately at the break in the slope on the curve. From a practical point of view, this pressure is usually viewed as corresponding to the maximum past effective stress supported by the soil. Researchers have shown, however, that the value of ${\sigma}_p$ depends on the test procedure. furthermore, owing to sampling disturbance, the results of the laboratory consolidation test must be corrected to better capture the in-situ compressibility characteristics. The corrections apply, strictly speaking, to soils where the relation between strain and effective stress is time independent. An important assumption in Terzaghi's one-dimensional theory of consolidation is that the soil skeleton behaves elastically. On the other hand, Buisman recognized that creep deformations in settlement analysis can be important. this has led to extensions to Terzaghi's theory by various investigators, including the applicant and coworkers. The main object of this study is to suggestion the modified compression index value to predict settlements by back calculating the $C_c$ from different numerical models, which are giving best prediction settlements for multi layers including very thick soft clay.

  • PDF

Design Formula for Launching Nose of ILM Bridge Considering the Interaction Behavior with Superstructure Sections (상부단면과의 상호작용을 고려한 ILM 교량용 압출추진코의 최적화 설계식)

  • Lee, Hwan-Woo;Jang, Jae-Youp
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.23 no.1
    • /
    • pp.53-60
    • /
    • 2010
  • In constructing ILM(Incremental Launching Method) bridges, a launching nose is generally used in order to absorb temporary stress occurring during launching. The sectional forces of superstructure of ILM bridges, which occurs during launching, varies significantly according to the length, weight and stiffness of the launching nose. Thus in order to guarantee the safety of section of ILM bridges, the change of stress according to interaction behavior between launching nose and superstructure should be considered. However, the span division and span length are often decided based on previous cases in practice. It makes the design sections of launching nose are similar in spite of different projects. The designer's anxiety to optimize the launching nose to affect the optimum design of superstructure is also weak. In this study, an design formular to optimize the nose is proposed by using the analysis formular of nose-deck interaction and the design level of ILM bridges constructed on 00 Expressway is examined. According to the result of this study, the proposed design formulas are expected to make a significant contribution to section design that is economically efficient and at the same time guarantees the safety of the superstructure and launching noses of ILM bridges regardless of span length.

Development of artificial intelligence-based river flood level prediction model capable of independent self-warning (독립적 자체경보가 가능한 인공지능기반 하천홍수위예측 모형개발)

  • Kim, Sooyoung;Kim, Hyung-Jun;Yoon, Kwang Seok
    • Journal of Korea Water Resources Association
    • /
    • v.54 no.12
    • /
    • pp.1285-1294
    • /
    • 2021
  • In recent years, as rainfall is concentrated and rainfall intensity increases worldwide due to climate change, the scale of flood damage is increasing. Rainfall of a previously unobserved magnitude falls, and the rainy season lasts for a long time on record. In particular, these damages are concentrated in ASEAN countries, and at least 20 million people among ASEAN countries are affected by frequent flooding due to recent sea level rise, typhoons and torrential rain. Korea supports the domestic flood warning system to ASEAN countries through various ODA projects, but the communication network is unstable, so there is a limit to the central control method alone. Therefore, in this study, an artificial intelligence-based flood prediction model was developed to develop an observation station that can observe water level and rainfall, and even predict and warn floods at once at one observation station. Training, validation and testing were carried out for 0.5, 1, 2, 3, and 6 hours of lead time using the rainfall and water level observation data in 10-minute units from 2009 to 2020 at Junjukbi-bridge station of Seolma stream. LSTM was applied to artificial intelligence algorithm. As a result of the study, it showed excellent results in model fit and error for all lead time. In the case of a short arrival time due to a small watershed and a large watershed slope such as Seolma stream, a lead time of 1 hour will show very good prediction results. In addition, it is expected that a longer lead time is possible depending on the size and slope of the watershed.

Method of Deriving Activity Relationship and Location Information from BIM Model for Construction Schedule Management (공정관리 활용을 위한 BIM모델의 공정별 수순 및 위치정보 추출방안)

  • Yoon, Hyeongseok;Lee, Jaehee;Hwang, Jaeyeong;Kang, Hyojeong;Park, sangmi;Kang, Leenseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.2
    • /
    • pp.33-44
    • /
    • 2022
  • The simulation function by the 4D system is a representative BIM function in the construction stage. For the 4D simulation, schedule information for each activity must be created and then linked with the 3D model. Since the 3D model created in the design stage does not consider schedule information, there are practical difficulties in the process of creating schedule information for application to the construction stage and linking the 3D model. In this study, after extracting the schedule information of the construction stage using the HDBSCAN algorithm from the 3D model in the design stage, authors propose a methodology for automatically generating schedule information by identifying precedence and sequencing relationships by applying the topological alignment algorithm. Since the generated schedule information is created based on the 3D model, it can be used as information that is automatically linked by the common parameters between the schedule and the 3D model in the 4D system, and the practical utility of the 4D system can be increased. The proposed methodology was applied to the four bridge projects to confirm the schedule information generation, and applied to the 4D system to confirm the simplification of the link process between schedule and 3D model.

Analysis of SEWB Activities on Appropriate Technology in Korea and in Developing Countries Including Cambodia (한국 및 개도국(캄보디아 등) 사례로 본 국경없는 과학기술자회의 적정기술 분야 사업 분석)

  • Lee, Sujung;Choi, Yoonjung;Park, Sanghee;Kim, Yongsoo;Jeong, Seongpil
    • Journal of Appropriate Technology
    • /
    • v.7 no.1
    • /
    • pp.93-101
    • /
    • 2021
  • Scientists and engineers without borders (SEWB) was established on 2009 as the NGO having specialist groups to support the underprivileged in developing countries living in the isolated area and having water and sanitation problems. After the SDGs were suggested by the UN on 2016, activities are globally conducted by the nation, NGO and etc. to improve health and education of the underprivileged in developing countries. SEWB also have been conducted the projects in Korea and developing countries to reduce the gap of the infrastructure between the developed and developing countries and to help sustainable development in the developing countries by providing appropriate technology. In Korea, SEWB have been held international conference on appropriate technology (ICAT), lectures, and competitions for specialists and students. In developing countries including Cambodia and other 5 countries, SEWB have been provided water packages funded by iCOOP KOREA and volunteer opportunities. Since 2019, 'SEWB sustainable village development project' have been conducted in Bot Veng village, Cambodia to improve infrastructures on water, electricity, transportation, and agriculture by using desalination system, Solar Cow system, strengthened wooden bridge, and poultry farm, respectively. The developed solution for developing countries from SEWB could contribute to eliminate the water shortage and poverty.