Method of Deriving Activity Relationship and Location Information from BIM Model for Construction Schedule Management  

Yoon, Hyeongseok (Department of Civil Engineering, Gyeongsang National University)
Lee, Jaehee (Department of Civil Engineering, Gyeongsang National University)
Hwang, Jaeyeong (Department of Civil Engineering, Gyeongsang National University)
Kang, Hyojeong (Department of Civil Engineering, Gyeongsang National University)
Park, sangmi (Bim Research Cluster, Korea Institute of Civil Engineering and Building Technology)
Kang, Leenseok (Department of Civil Engineering, Gyeongsang National University)
Publication Information
Korean Journal of Construction Engineering and Management / v.23, no.2, 2022 , pp. 33-44 More about this Journal
Abstract
The simulation function by the 4D system is a representative BIM function in the construction stage. For the 4D simulation, schedule information for each activity must be created and then linked with the 3D model. Since the 3D model created in the design stage does not consider schedule information, there are practical difficulties in the process of creating schedule information for application to the construction stage and linking the 3D model. In this study, after extracting the schedule information of the construction stage using the HDBSCAN algorithm from the 3D model in the design stage, authors propose a methodology for automatically generating schedule information by identifying precedence and sequencing relationships by applying the topological alignment algorithm. Since the generated schedule information is created based on the 3D model, it can be used as information that is automatically linked by the common parameters between the schedule and the 3D model in the 4D system, and the practical utility of the 4D system can be increased. The proposed methodology was applied to the four bridge projects to confirm the schedule information generation, and applied to the 4D system to confirm the simplification of the link process between schedule and 3D model.
Keywords
BIM; 4D Simulation; Automatic Schedule Generation; HDBSCAN Algorithm; Topological Sort Algorithm;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Amer, F., Koh, H.Y., and Mani, G.F. (2021). "Automated Methods and Systems for Construction Planning and Scheduling: Critical Review of Three Decades of Research." Journal of Construction Engineering and Management, 147(7) : 03121002.   DOI
2 Campello R.J.G.B., Moulavi, D., and Sander, J. (2013). "Density-Based Clustering Based on Hierarchical Density Estimates." Proc. of the 17th Pacific-Asia Conference on Knowledge Discovery and Data Mining, pp. 160-172.
3 Cho, Y.S., and Yun, S.H. (2015). "Efficiency Improvement Method for the 4D Construction Simulation System through WBS based 3D Model and Activity Automated Relationship." Journal of the Architectural Institute of Korea Structure & Construction, AIK, 31(4), pp. 111-118.   DOI
4 Jang, S.J., Park, W.H., Yun, S.H., and Peak, J.H. (2007). "Study of 4D simulation for automation with BIM CAD." Journal of the Architectural Institute of Korea Structure & Construction, AIK, 27(1), pp. 777-780.
5 Wilfredo, T.C., Chi, Y., Amer, F., and Mani, G.F. (2019). "Automated Mining of Construction Schedules for Easy and Quick Assembly of 4D BIM Simulations." ASCE International Conference on Computing in Civil Engineering, pp. 432-438.
6 Jeong, J.W., Seo, J.H., Park, H.J., and Choo, S.Y. (2019). "A Study on Implementation of 4D and 5D Support Algorithm Using BIM Attribute Information - Focused on Process Simulation and Quantity Calculation." Journal of the Regional Association of Architectural Institute of Korea, 21(4), pp. 15-26.
7 Park, J.H., Cai, H., Dunston, P.S., and Ghasemkhani H. (2017). "Database-Supported and Web-Based Visualization for Daily 4D BIM." Journal of Construction Engineering and Management, 143(10) : 04017078.   DOI
8 Park, S.H., Song, J.H., and Oh, K.S. (2018). "Development of Construction Schedule Management System based on BIM." Journal of the Architectural Institute of Korea Structure & Construction, AIK, 34(3), pp. 61-68.   DOI
9 Jo, J., Park, K.H., Park, W.H., and Peak, J.H. (2007) "An study of the automatic link between 3D model and Scheduling for 4D simulation system." Journal of the Architectural Institute of Korea Structure & Construction, AIK, 27(1), pp. 805-808.