EVALUATING CRITICAL SUCCESS FACTORS FOR ACCURATE FIRST COST ESTIMATES OF LARGE-SCALE CONSTRUCTION PROJECTS

  • Jin-Lee Kim;Ok-Kyue Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.354-360
    • /
    • 2009
  • The demands for large-scale construction projects such as Mega-projects are largely increasing due to the rapid growth of increasing populations as well as the need to replace existing buildings and infrastructure. Increasing costs of materials, supplies, and labors require the first cost estimates at the preliminary planning stage to be as accurate as possible. This paper presents the results obtained from the survey on evaluating nine critical success factors that influence the accurate first cost estimates for large-scale projects from practical experiences. It then examines the current cost structures of construction companies for large-scale projects, followed by the causes for cost and schedule overrun. Twenty completed surveys were collected and the Analytic Hierarchy Process was applied to analyze the data. The results indicate that technology issues, the contract type, and social and environmental impacts are the significant leading factors for accurate first cost estimates of large-scale construction projects.

  • PDF

공사비 변화에 따른 제로에너지건축물 경제성 분석 - 사회적비용을 고려한 비용편익 분석을 중심으로 - (Economic Analysis of Zero Energy Building in South Korea - focusing on Cost-Benefit analysis considering Social Cost -)

  • 김재문
    • 대한건축학회논문집:구조계
    • /
    • 제36권3호
    • /
    • pp.147-157
    • /
    • 2020
  • With the increasing obligation to reduce greenhouse gas emissions to the building sector, the government has been gradually expanding its obligation to zero-energy buildings since 2020. Since the ZEB certification took effect in 2017, 48 preliminary and main certifications have been completed as of March 2019, and most of them are public buildings or even certified, but have earned Grade 5 of ZEB. This means that compared with the number of annual building permits registered in Korea, the figure is insignificant, and that it receives little if not mandatory. Therefore, this study investigated empirical cases of ZEB additional construction cost and conducted cost benefit analysis according to changes in ZEB additional construction cost based on a preliminary feasibility analysis project recently conducted by the KDI. In addition, considering the public buildings, the social costs were considered, and the cost-benefit analysis method was the same as the KDI's preliminary feasibility analysis method. The analysis shows that if the ratio of ZEB additional construction cost is more than 5 percent, it is analyzed that there is no economic feasibility, and considering that the ratio of additional construction cost in the cases of ZEB in Korea is 17 percent to 38 percent, it will not be easy to obtain ZEB certification in terms of cost. Finally, to narrow these differences in cost and economic aspects, the overseas low energy and ZEB incentive examples proposed measures such as the concept of subsidy payment in Illinois and the compensation of social costs to private ZEB.

Empirical Analysis of Man-hour Data to Support a Cost-Plus Pricing Approach for Estimating BIM Service Costs

  • Koo, Bonsang;Lee, Ghang;Kim, Chung-woon;Shin, Byungjin
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.660-661
    • /
    • 2015
  • Building Information Modeling (BIM) is a nascent technology in Korea, and currently lacks formal guidelines to assist Architectural and Engineering (AE) firms in estimating BIM service fees, while also allowing government agencies to allocate budgets for the rendered BIM services. This research provides a method to estimate costs for BIM services based on the cost-plus pricing framework. The approach requires a generalized estimate of the man hour per floor area data to calculate the direct labor costs. Man-hour data were collected from forty five projects that have implemented BIM. Interpolation of the man-hours was performed to develop a general reference table for 'Type 2' (i.e., public schools and office buildings, etc.) projects. By providing an objective approach for estimating the costs of BIM services, it allows clients and AE firms to agree upon a fair cost for BIM related services, and thus expedite its adoption in Korea.

  • PDF

모듈러 건축 타워크레인 운용 계획의 대안 평가 모델 - 유닛 설치 및 마감공사를 중심으로 - (Alternative Evaluation Model for Tower Crane Operation Plan in Modular Construction - Focusing on Modular Unit Installation and Finishing works -)

  • 김주호;박문서;이현수;현호상
    • 한국건설관리학회논문집
    • /
    • 제19권2호
    • /
    • pp.50-60
    • /
    • 2018
  • 최근 인력자원 투입량 감소 및 공기단축이 가능한 모듈러 건축공법은 반복 공정이 많은 기숙사, 주거시설, 호텔 공사 등에 다양하게 적용되고 있다. 모듈러 건축공법은 유닛 설치비용을 제외한 현장 공사비에서 외장 마감공사 비용의 비중은 약 40%를 차지하며, 마감공사는 목표공기와 비용을 유지하는데 주요한 역할을 한다. 모듈러 현장에서 유닛 설치 및 마감공사 수행을 위해 한정된 장비가 후속 액티비티에 영향을 주지 않도록 공유되어야 하며 현장 마감 비중이 커지는 모듈러 프로젝트일수록 공정관리에서 양중 계획은 매우 중요하기 때문이다. 이와 같은 T/C 운용 계획은 단일 사이클 또는 다중 사이클의 형태를 가지게 되며 사이클 주기 조율은 장비효율을 높일 수 있다. 그러나 유닛 설치 및 마감공사를 지원하기 위한 T/C 운용 계획의 대안을 평가하는데 어려움이 있다. 따라서 본 연구는 모듈러 건축 현장에서 T/C 운용의 사이클 주기 설정에 따른 운용방식의 대안을 평가하기 위해 유닛 양중 시간 및 주기, 외장재 양중 시간, 마감 작업 소요시간을 변수화하여 T/C 가동시간과 공정에 주는 영향을 파악한다. 이러한 목적을 달성하기 위해 현장에서 이루어지는 작업 프로세스 분석을 바탕으로 작업 속도를 조절하여 T/C 효율을 증대시킬 수 있는 시뮬레이션 모델을 개발한다. 본 연구는 양중 사이클 개념을 적용한 자원 평준화 방법을 제시함으로써 학술적 기여가 있으며 실무적으로 현장관리자에게 장비 계획의 대안 선택을 위한 기초자료로서 활용될 수 있을 것이다.

Improvement of the PVC Window Frame Installation Method Integrated with Gangform and Field Applicability Analysis

  • Choi, Hyo-Sung;Lee, Jeong-Ho;Yoo, Huyn-Seok;Kim, Young-Suk;Han, Seung-Woo
    • 한국건축시공학회지
    • /
    • 제11권5호
    • /
    • pp.482-500
    • /
    • 2011
  • In apartment housing construction, window frame installation work, which is conducted after the structural framework, is very important, because its completion time directly affects the starting time of successive interior finishing works, as well as the overall construction period. Construction delays in interior finishing works might occur due to problems inherent to the conventional window frame installation method, such as the poor verticality of window frames, and the water leakage around them. The primary objective of this study is to analyze the problems of a 'Gangform integrated PVC window frame pre-installation method' based on its pilot test results. Next, this study proposes an improved conceptual model that enables the end users to enhance the field applicability of this method in terms of productivity, time, and cost. The field applicability of the proposed 'Gangform integrated PVC window frame pre-installation method' was also verified through a survey.

A STUDY ON THE LIFE CYCLE COST ANALYSIS IN LIGHT RAIL TRANSIT BRIDGES: FOCUSED ON SUPERSTRUCTURE

  • Lee Du-heon;Kim Kyoon-tai;Kim Hyun Bae;Jun Jin-taek;Han Choong-hee
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.30-40
    • /
    • 2007
  • The demand for light-rail construction projects has recently been increasing, and they are mostly supervised by private construction companies. Therefore, a private construction company that aim to raise gains from the operation of the facilities during the contract period greater than what they invested should b able to accurately calculate the costs from the aspect of Life Cycle Cost (LCC). In particular, a light-rail transit bridge that has a heavier portion from the aspect of the cost of light-rail transit construction requires a more accurate calculation method than the conventional LCC calculation method. For this, an LCC analysis model was developed and a cost breakdown structure was suggested based on literature review. The construction costs by shape of the upper part of a light-rail transit were calculated based on the cost breakdown system presented in this paper, and the cost generation cycle and cost unit price were collected and analyzed based on records on maintenance costs, rehabilitation and replacement. In addition, after forming some hypotheses in order to perform the LCC analysis, economic evaluation was conducted from the aspect of the LCC by using performance data by item.

  • PDF

사례분석을 통한 아파트 골조공사의 공기지연 요인 도출 및 개선방안 (Case Studies: Schedule Delay Factors and Delay Prevention Program for Concrete Frame Works in Apartment Construction Project)

  • 조태제;최종수
    • 한국건축시공학회지
    • /
    • 제11권1호
    • /
    • pp.9-17
    • /
    • 2011
  • 건설프로젝트에서 공기지연은 공정 및 공사비 관리 측면에서 핵심 관리사항에 해당된다. 본 연구는 아파트 건설공사에서 직접비의 상당부분을 차지하는 골조공사를 대상으로 공사부위별 공기지연 수준을 분석하고 대책을 제시한 실증연구로 10개 현장의 공사비 비중분석 결과에 기반하여 골조공사에서 지연이 발생하는 부위의 순위, 원인 등을 분석하였다. 분석결과 1층 골조공사에서 가장 큰 지연이 발생하는 것으로 나타났으며 지연원인을 다양한 분류에 의거하여 분석하고 대책을 제시하였다.

회귀분석을 통한 공공청사 골조 공사의 개산견적 방안 (Conceptual Cost Estimate Method of Public Office Building Structural Frame Work by Regression Analysis)

  • 조영호;최현준;김정원;윤석헌
    • 한국건축시공학회지
    • /
    • 제20권2호
    • /
    • pp.147-153
    • /
    • 2020
  • 프로젝트 초기단계에서 적정공사비 산정은 필수적이다. 적정공사비 산출을 위해서는 개산견적은 중요한 요인이 된다. 하지만 국내의 개산견적 활용 현황은 건물 유형에 따른 단위면적당 공사비만 활용하는데 그치고 있어 그 정확도가 높지 않다. 이에 본 연구에서는 따른 골조 공사의 공통 내역항목 수량을 연면적에 의한 회귀식을 제시하여 골조 공사의 철근, 레미콘, 거푸집에 대하여 개산 수량을 산출하고자 하였다. 본 연구에서 제시한 회귀식의 정확성과 타당성을 검증하기 위해 기존에 사용된 개산 수량법과 본 연구에서 제시한 회귀식을 실 사례에 적용하여 비교분석을 실시하였다. 그 결과 기존 개산 수량 법은 실소요 수량에 비해 발생한 오차율이 -102 ~ 55%였으며, 이에 기존 개산수량 법은 AACE에서 제시한 개산견적 정확도 범위인 -50~100%에 초과되었으나, 본 연구에서 제시한 회귀식의 오차율은 -6.4 ~ 11.62%였다. 이는 AACE의 개산견적 정확도 범위뿐만 아니라 상세견적 단계에서도 사용할 수 있다고 볼 수 있다. 그러나 더 높은 기대효과를 기대하기 위해서는 향후 수량뿐만 아니라 단가에 대한 영향요인을 분석하여 적정 공사비를 산출하는 연구가 필요하다고 판단된다.

BIM기반 건축물 수선교체비 산정 프로세스 (BIM-based Repair&Replacement (R&R) Cost Estimating Process)

  • 박지은;유정호
    • 한국건설관리학회논문집
    • /
    • 제17권2호
    • /
    • pp.31-38
    • /
    • 2016
  • 건설사업비 중 건축물의 유지관리비용이 차지하는 비중이 초기투자비만큼이나 상당하며 국내의 경우 건설공사의 생애주기비용(LCC)관점에서 설계VE검토 업무를 시행하고 있다. 건설산업의 정보화와 고도화 급속히 진행됨에 따라 BIM에 대한 관심이 고조되고 있다. 2012년부터 조달청은 500억원 이상인 공공공사에 BIM적용을 의무화를 시작으로 2016년부터 조달청이 발주하는 모든 공공공사에 BIM적용이 의무화된다. 건축설계의 패러다임이 2D방식에서 3D, 데이터관리 관점의 BIM으로의 전환이 정책적으로 이루어지고 있는 환경에서, LCC측면에서의 BIM활용에 대한 연구는 미흡한 실정이다. 특히, LCC분석 요소 중 하나인 수선교체비 산정을 위한 BIM 소프트웨어는 부재하며 상용화된 BIM저작도구에서 수선교체비 산정을 위한 정보의 전달이 부족하다. 따라서 본 연구에서는 데이터 표준 포맷인 IFC기반 수선교체비 산정을 위한 프로세스를 제안한다. 먼저, 현재 존재하는 수선교체 기준을 분석하고 BIM기반 수선교체비 산정 요구정보를 정의한다. 정의된 요구정보는 각 정보에 해당하는 IFC를 통해 추출되고, BIM기반 수선교체비 산정 요구정보 DB에 저장된다. 이는 외부 DB인 수선교체기준DB와 단가DB와 연계하여 수선교체비를 산정한다. 본 연구가 제시하는 프로세스를 통해 BIM환경에 대응하여 BIM모델을 활용한 수선교체비 산정의 효율화를 기대하며 수선교체비 뿐만 아니라 초기공사비, 에너지비용, 유지관리비용에 이르기까지 향후 LCC분석 요소에 확장하여 적용이 가능할 것이며 BIM기반 LCC분석의 표준화에 기여할 수 있다.

성과측정유닛을 활용한 건설 비용 - 일정 통합관리 방안 (Construction Cost-Schedule Integration Management Methodolgy by using Progress Integration Unit)

  • 강남희;최재현
    • 한국건설관리학회논문집
    • /
    • 제18권3호
    • /
    • pp.42-51
    • /
    • 2017
  • 건설 프로젝트의 생산과정에서 성과를 지속적으로 측정하고 평가하는 것은 프로젝트관리의 성공적인 수행을 위한 핵심요소이다. 성과는 일반적으로 목적물에 할당 된 공정과 원가 관련 정보를 정량적으로 평가함으로써 측정되며, 객관적인 성과측정을 위해 공정과 원가가 통합적으로 계획 관리되어야 한다. 본 연구는 공정과 원가의 통합 모델을 통해 성과 측정 방법론을 제안하고 진도관리의 기반을 마련하는데 목적이 있다. 이를 위해 공정계획과 원가계획의 표준화된 업무 프로세스를 개발하였고, EVM과 기존의 통합 모델을 분석하여, 성과측정 유닛을 활용한 WBS와 CBS의 통합 방법론을 제시하였다. 플랜트 프로젝트의 시공단계를 중심으로 공통 성과측정의 대상은 공종으로 선정하여 성과측정 유닛을 규정하고 공정과 비용정보를 연계시켜 성과비율을 산정하였다. 또한 리소스의 적용시 원가요소 중 소모성자원의 비용을 배제하여 진도측정의 객관성을 향상하였다. 본 결과는 실제 플랜트 사례 프로젝트에 적용하여 실증되었으며, 개발된 방법론은 향후 프로젝트의 성과를 보다 객관적인 기준으로 평가할 수 있어 보다 효과적인 진도관리 방법이 될 것으로 판단된다.