• Title/Summary/Keyword: architectural construction cost

Search Result 592, Processing Time 0.025 seconds

A study on the method for the Integrated Cost Estimate based on Project(ICEP) of program management with typical model (기준모델을 사용한 종합사업관리용역비 산정방법(ICEP) 연구)

  • Baek, Myeongchang;Park, Junmo;Park, Gilbeom;Kim, Okkyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.119-128
    • /
    • 2015
  • Domestic dominant method in subcontract cost estimate for comprehensive program management is estimation by referencing similar cases or relying on the experience and expertise of the engaged. However, this method is not reliable due to lack of accuracy, making it harder for clients to plan and budget the program. Since budget itself is roughly estimated, it becomes a source of cost rise in the course of management due to design modifications. Therefore, the client and service providers shall calculate more accurate service cost by applying objective and scientific method in order to minimize cost rise and cost related dispute. Traditional cases, in estimating program management cost, took Top-Down approach based on precedents and experience. On the contrary, this study will categorize management structure into phases and activities, issue WBS for each phase to estimated schedule and cost for each code, and take Bottom-UP approach. By taking this approach named ICEP (Integrated Cost Estimate based on Project), Set project typical model will be developed for service cost estimating, calculate cost by applying project-specific factors. Also, by analyzing progress data and allocated management cost to complement them, more efficient construction management will take shape based on program management cost standards which reflect project-specific features.

A Study on Cost-Benefit Analysis of BIM-based Integrated Design Process in Korean Architectural Offices (국내 설계사무소의 BIM기반 통합설계프로세스 도입에 따른 비용효과분석에 관한 연구)

  • Seo, Ji-Hyo;Choo, Seung-Yeon
    • Korean Journal of Computational Design and Engineering
    • /
    • v.15 no.4
    • /
    • pp.261-270
    • /
    • 2010
  • These days, architectural projects are becoming larger and more complex. And lots of information occurs through each phases and areas. For these reason, it is emphasized that collaboration with other parts. Therefore we need more effective architectural design process. However, it is difficult to collaborate in early stage with existing design process and it causes unnecessary spending of time and cost because of 2D-based working system. For solving these problem, we should introduce BIM-based Integrated Design Process which makes it possible to collaborate with other parts from early stage. Now the AEC industry in Korea has been trying to introduce BIM, and promoting variety of related business. However, for actual application of this system, it is unfortunately necessary to change various system throughout the construction industry. And this will cause lots of effort and expense. It is essential that scientific analysis and evaluation of efficiency and validity about this investment, because estimation of the investment and accompanying effects will provide reasonable standard of judgment for investment decision. Thus, this research conducted Cost-Benefit Analysis about BIM-based Integrated Design Process compared to existing design process. It is expected that this paper can be used for preliminary data in the future BIM market.

A Correlation Analysis of Influence Factors of Nonconformity in Construction Projects (건설프로젝트의 품질결함의 발생요인간 상관분석)

  • Chi, Sungjoon;Cha, Yongwoon;Han, Sangwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.2
    • /
    • pp.21-28
    • /
    • 2015
  • Construction defects are major components that result in cost overruns and schedule delays in construction projects. There have been extensive research efforts to investigate the cause of defects. However, little effort has been devoted to analyze correlation among various reasons of construction defects while a defect is not usually an outcome of a single cause, but rather occurs when several interrelated causes combine. Based on this recognition, this paper analyzes 831 nonconformity reports collected from 30 construction projects in Korea from 2011 to 2014. The correlation analysis revealed that a significant portion of construction defects occurred in the procurement and construction phase and as the pattern of function defect and installation defect. Triggered by human error, defective material and faulty method, these defects are treated by conccession, repair, rework that can significantly lower the cost and schedule performance. This paper is significant in terms of providing a theoretical basis for analyzing correlation among various reasons of construction defects and quantitative measures for establishing effective defect prevention strategies.

Case Study on Application of TRIZ Theory and Creative Cost Savings in Architectural Engineering (건축공학에서 트리즈이론의 적용과 창의적 비용절감사례연구)

  • Jang, Myung-Houn;Ko, Dong-Woo
    • Knowledge Management Research
    • /
    • v.16 no.3
    • /
    • pp.65-80
    • /
    • 2015
  • Problems solved by the TRIZ method have been developed and applied in many fields ranging from management as well as engineering. Most of the problems occurring in the construction site should be applied immediately. To solve the problem of building engineering, formulation of the problem solving process using the TRIZ method is needed. This study classified and analyzed the problem solving process of architectural engineering technology in accordance with the procedures of TRIZ, and showed the case of solving problem in the field and the availability of TRIZ theory in architectural engineering. This paper shows that the TRIZ theory can be used as a tool for creative problem solving and cost reduction in architectural engineering.

Ensuring Economic Benefits of Mitigation Projects for Improving the Image of Construction Industry

  • Son, Chang-Baek;Shin, Won-Sang;Kim, Dae Young
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.19 no.3
    • /
    • pp.67-74
    • /
    • 2014
  • Over the last several decades, the United States has experienced a great number of natural disasters. To minimize the impact of the natural hazard events, the U.S. government spent a tremendous amount of money through federal assistant programs. To be eligible for the programs, a mitigation project must be cost effective (more benefits compared to project costs). However, the state and local communities suffering from the natural disasters generally have difficulty in collecting reliable evidence for their damages which can be converted later into benefits when a mitigation project is implemented. Therefore, this paper shows the process of conducting a benefit cost analysis with limited data. Besides, it also provides how to apply the limited data to the analysis through a case study. Consequently, this paper help state and local communities get funding from the federal government, which in turns will improve the image of construction industry by preventing people from natural disasters.

Investigation of the effects on earthquake behavior and rough construction costs of the slab type in reinforced concrete buildings

  • Gursoy, Senol;Uludag, Omer
    • Advances in concrete construction
    • /
    • v.10 no.4
    • /
    • pp.333-343
    • /
    • 2020
  • In the architectural design process, the selection and configuration of the structural system significantly affect the earthquake behaviours of the reinforced concrete buildings. The main purpose of this study, the effects on the earthquake performances and the rough construction cost of the buildings of the slab type in reinforced concrete buildings are to examine comparatively for different local soil classes. The results obtained from this study have been determined that the building model having slabs with beams is safer compared to other types of slabs, especially when considering the vertical bearing structural elements (columns). It also shows that other types of slab, except for slab with beams, reduce the earthquake performances of reinforced concrete buildings, increase the displacement values, 1st natural vibration period values and the cost of rough construction. This matter reveals that slab type is quite important and the preference of beamed slabs in reinforced concrete buildings to be constructed in earthquake zones would be more appropriate in terms of safety and cost.

Forecasting Project Cost and Time using Fuzzy Set Theory and Contractors' Judgment

  • Alshibani, Adel
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.174-178
    • /
    • 2015
  • This paper presents a new method for forecasting construction project cost and time at completion or at any intermediate time horizon of the project duration. The method is designed to overcome identified limitations of current applications of earned value method in forecasting project cost and time. The proposed method usesfuzzy set theory to model uncertainties associated with project performance and it integrates the earned value technique and the contractors' judgement. The fuzzy set theory is applied as an alternative approach to deterministic and probabilistic methods. Using fuzzy set theory allows contractors to: (1) perform risk analysis for different scenarios of project performance indices, and (2) perform different scenarios expressing vagueness and imprecision of forecasted project cost and time using a set of measures and indices. Unlike the current applications of Earned Value Method(EVM), The proposed method has a numberof interesting features: (1) integrating contractors' judgement in forecasting project performance; (2) enabling contractors to evaluate the risk associated with cost overrun in much simpler method comparing with that of simulation, and (3) accounting for uncertainties involved in the forecasting project cost.

  • PDF

A Basic Model of the Procurement Planning of Resources by Activity in Construction Projects (건축공사 액티비티별 소요자원 조달계획의 기초모델링)

  • Kim, Ji-Hyun;Nam, Gi-Yung;Lee, Soo-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.3
    • /
    • pp.340-346
    • /
    • 2012
  • Recently, the construction industry has been pursuing the rationalization of its various systems through informatization. Procurement is a highly important element of the construction process, as it is directly related to the cost and quality of a construction project. In addition, procurement management of resources is in an indivisible relation, so that it is significant to link each other effectively. This study proposed construction activity and basic data connected to cost summary work for the categorization and utilization of resources. This study connected that activity to detailed items of material and labor cost, and proposed a procurement planning model of resources by activity that can utilize all resources and information. In addition, this model can classify resources and information by various forms. We found that the utilization of this procurement planning model will be higher because it can grasp various problems that occur in the passive procurement and provide additional functions that can be modified.

A Study on the Application Method of Construction Site Direct Construction System - Centered on domestic construction case - (건설현장 직접시공제도의 활용방안에 대한 연구 - 국내 건설 사례 중심으로 -)

  • Baek, Jae-Chul;Ock, Jong-Ho
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.11
    • /
    • pp.171-180
    • /
    • 2019
  • This research proposed the Direct Construction System for construction corporations as a strategy intended to perform cause analysis of construction technician shortage matter and solve resulting problems, and in view of the outcomes from the application of this system to the projects and workshops, it was verified that unsteady employment, lack of career prospect, and conditions of work environment can be resolved. In addition, from corporations' perspective, it is considered that by clarifying the abovementioned three problems, fundamental complications of construction administration, quality control, safety supervision, and cost management were settled, concluding forthcoming advancement of domestic construction business quality fell far behind developed counties.

Probabilistic LCC evaluation for Surface Repair of carbonated RC structure (탄산화된 RC구조물의 표면보수에 대한 확률론적 LCC 평가)

  • Lee, Hyung-Min;Yang, Hyun-Min;Lee, Han-Seung
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.2
    • /
    • pp.41-48
    • /
    • 2018
  • Carbonation is one of the major detrimental factors to the reinforced concrete structures owing to penetration of atmospheric CO2 through the micro pores, thereby it reduces the durability of the concrete. The maintenance periods and cost for concrete according to the coefficient variation of different finishing materials is documented in literature. However, it is required to carry out the systematic and well planned studies. Therefore, keeping them in mind, surface repair was carried out to the carbonated concrete and the maintenance cost was calculated to measure the durability life after repair with different variable. The deterministic and probabilistic methods were applied for durability and repair cost of the concrete. In the existing deterministic model, the cost of repair materials increases significantly when the concrete structure reaches its service life. In present study using a stochastic model, the maintenance period and cost was evaluated. According to obtained results, there was no significant difference in the number of maintenance of the coefficient variation. The initial durability has a great influence on the maintenance time and cost of the structure. Unlike the deterministic model, the probabilistic cost estimating model reduces the number of maintenance to the target service life expectancy.