Abstract
These days, architectural projects are becoming larger and more complex. And lots of information occurs through each phases and areas. For these reason, it is emphasized that collaboration with other parts. Therefore we need more effective architectural design process. However, it is difficult to collaborate in early stage with existing design process and it causes unnecessary spending of time and cost because of 2D-based working system. For solving these problem, we should introduce BIM-based Integrated Design Process which makes it possible to collaborate with other parts from early stage. Now the AEC industry in Korea has been trying to introduce BIM, and promoting variety of related business. However, for actual application of this system, it is unfortunately necessary to change various system throughout the construction industry. And this will cause lots of effort and expense. It is essential that scientific analysis and evaluation of efficiency and validity about this investment, because estimation of the investment and accompanying effects will provide reasonable standard of judgment for investment decision. Thus, this research conducted Cost-Benefit Analysis about BIM-based Integrated Design Process compared to existing design process. It is expected that this paper can be used for preliminary data in the future BIM market.