• Title/Summary/Keyword: allowance time

Search Result 163, Processing Time 0.024 seconds

Effects of Dietary Nutrient Content, Feeding Period, and Feed Allowance on Juvenile Olive Flounder Paralichthys olivaceus at Different Feeding Period and Ration

  • Kim, Byeng-Hak;Cho, Sung Hwoan
    • Fisheries and Aquatic Sciences
    • /
    • v.17 no.4
    • /
    • pp.441-448
    • /
    • 2014
  • We examined the effects of dietary nutrient content, feeding period, and feed allowance on compensatory growth, food use, chemical composition, and serum chemistry of juvenile olive flounder Paralichthys olivaceus. We placed 720 juvenile fish into 24 400-L flow-through round tanks (30 fish per tank).A $2{\time}2{\time}2$ factorial design (diet: control (C) and high protein and lipid (HPL) ${\time}$ feeding period: 8 and 6 weeks ${\time}$ feed allowance: 100% and 90% of satiation) was applied. Fish were hand-fed twice daily, based on the designated feeding schedule. Weight gain and food consumption were affected by both the feeding period and feed allowance, but not by diet. The food efficiency ratio was not affected by diet, feeding period, or feed allowance, but the protein efficiency ratio and protein retention were affected by diet and feeding period, respectively. We found that the full compensatory growth of fish was not achieved at a restricted feeding allowance.

A Relative Time Study on the Allowance Time in Thinning of Some Conifer Species (몇가지 침엽수(針葉樹) 소경재(小經材) 간벌작업(間伐作業)에서의 일반시간(一般時間)에 대한 관계시간연구(關係時間硏究))

  • Kang, Gun-Uh
    • Journal of Korean Society of Forest Science
    • /
    • v.85 no.2
    • /
    • pp.316-324
    • /
    • 1996
  • This study was conducted by relative time study to identify the allowance time and basic work time, which is together composed of the total work time, in the wage composition and work process composition. This study was done for the case of a basic one person a group from thinning treatment for some conifer species such as Japanese red pine, Japanese larch, pitch pine and Korean pine. 1. In order to apply the Japanese allowance time of four species to the general conifer case, the maximum value of allowance time composition value among those of four species was selected. The results are as follows: delay time for person 1.8%, rest time 14.1%, delay time for machine 12.5% and wating time 0.4%. The some of ratios of adjustment allowance time is 28.8%. 2. Estimated wage basis time table, which can be used for wage table or process table, was prepared by adding up adjusted general allowance time and standard work time estimated by estimation equation for each species through the time study.

  • PDF

A study on the relationship between child/family cash benefits and fertility rate: Focusing on child/family allowance (OECD 국가의 아동가족 현금지원정책과 출산율간의 관계 -아동수당을 중심으로-)

  • Choi, Young;Kim, Seul Ki
    • Journal of the Korean Society of Child Welfare
    • /
    • no.60
    • /
    • pp.59-86
    • /
    • 2017
  • The purpose of this study was to examine the effects of child/family allowance on total fertility rate by period. For this purpose, it formed pooled-time series data from 1980 to 2015 targeting 19 OECD countries that adopted the child allowance policies, and made a close inquiry into a variable-based relationship through the pooled-time series cross-section analysis. The results were as follows. The child allowance appeared to have a significant impact on fertility rate even after controlling for other variables. Such impact was shown to be more noticeable in countries that introduced a fertility encouragement mechanism within its child allowance program. Based on the results, this study suggested the necessity of stepping up a benefit for multi-child families by additionally adopting a fertility encouragement mechanism within the child allowance program, in order for the child allowance program in Korea to function as well as the fertility rate promotion down the road.

A Study on the Verification of Heavy Overhaul Maintenance Allowances for the Maintenance Shop (시뮬레이션과 BPR을 응용한 Layout 기반의 철도차량기지 중정비 검수 여유율 검증)

  • Choi, Sung-Hwan;Lee, Hi-Sung
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.1
    • /
    • pp.9-15
    • /
    • 2010
  • When designing the size of a heavy maintenance shop for rolling stock, it is required to arrange buildings and facilities in the minimum site so as to improve the maintenance efficiency. However, the fluctuation rate (hereinafter "allowance rate") on which factors such as service and maintenance fluctuation should be applied when estimating the size of the maintenance shop has been used without verification. The objective of the study is to calculate a reasonable allowance rate and to review its appropriateness through the analysis of the facilities layout and process simulation to absorb the above elements into the staying time in the heavy maintenance shop. Since the working time, in this study, is assumed to be average working time, 10~20% was given to the standard deviation of working time in consideration of difference between workers, and possible allowance rate was drawn by analysis of the simulation results. In the future, it is required to optimize the size of the shop by applying appropriate allowance rate through scientific review of such factors as O&M plan, R/S reserve rate, capability of the shop, outsourcing rate, standard work amount, and so on.

Identification of Core Items for Repair Works of Apartment Housing by Evaluating Necessity of Repair Work and Buren of Repair Cost (수선필요도와 비용부담도 평가를 통한 공동주택 수선공사 핵심항목 도출방안)

  • Song, Sanghoon;Lee, Seok-Je;Park, Seong-Sik
    • KIEAE Journal
    • /
    • v.16 no.4
    • /
    • pp.79-86
    • /
    • 2016
  • Purpose: Frequently, the apartment management offices have difficulties in effective repair works due to their insufficient technological capability to operate long-term repair program. There also have been many cases of failure in executing urgent repairs mainly because the repair allowance has not accumulated enough for the repair works on time. This study aimed to determine core items in apartment maintenance in order to reduce the confusion and unnecessary efforts for the management office by suggesting simple list of repair items. Method: Core items are defined using several indicators. The degrees of necessity for repair work(NRW) are calculated combining the impacts to living, safety, and aesthetics. Then the degrees of burden of repair cost(BRC) are estimated by analyzing actual long-term repair program of three apartment complexes. Lastly the degrees of accumulation demand for repair allowance(AD) are calculated with NRW and BRC. Result: The core items and essential items are suggested for three apartment types as case studies based on the indicators of NRW, BRC, and AD. Then, the required accumulated allowance per $m^2$ was calculated to effectively implement repair works.

Development of Fitting Process for Extra Long Stainless/Composite Material Pipes (초장축 스테인레스/복합재료 파이프의 피팅 공정 개발)

  • Park, S.H.;Lee, C.M.
    • Transactions of the Korean Society of Machine Tool Engineers
    • /
    • v.17 no.2
    • /
    • pp.77-82
    • /
    • 2008
  • Rubbing-roller is used for manufacturing liquid crystal display, and static displacement of the rubbing-roller becomes bigger as length of the rubbing roller made of aluminum is getting longer. Therefore, material of the rubbing-roller is changed from aluminum to CFRP(Carbon Fiber Reinforced plastic). Recently thermal spraying is applied to manufacturing process of long rubbing-roller. The thermal spraying has disadvantages such as increment of manufacturing time and fraction defective caused by density of stainless steel particle. In this study, fitting process by drawing was suggested and FEM analysis with Tsai-Wu failure theory and fitting experiments are carried out to find adequate shrink allowance. The suggested shrink allowance gives proper adhesive force, and CFRP failure is not occurred. Furthermore, the fitting process is applied to long rubbing-roller and availability of the fitting process is studied by measurement of roundness, straightness and shear strength.

An AHP Approach to Select the Task Related Technique for Work Efficiency Improvement in Shipbuilding Enterprise (AHP에 의한 조선기업의 작업능률향상을 위한 과업관련기법의 선택)

  • Kim, Tae-Soo;Lee, Kang-Woo
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 2006.11a
    • /
    • pp.31-37
    • /
    • 2006
  • The objective of this research is to select the most effective technique from task related techniques(motion & time study, job redesign, physical environment improvement) for improving work efficiency in shipbuilding enterprise. This study consists of several principal steps. The first step is to design critical criteria in evaluating work efficiency in shipbuilding enterprises. The second step is to develop sub-criteria of the critical criteria. The third step is to develop a four level AHP(Analytic Hierarchy Process)structure using the critical criteria, sub-criteria and techniques from task related techniques. The fourth step is to develop the pairwise comparison matrix by each level of AHP structure, which was based on survey data collected at the H heavy industry. And the last step is to select the most effective technique from task related techniques using AHP analysis. The result of AHP analysis has shown clear difference in priority among task related techniques in terms of work efficiency of the shipbuilding enterprise: The reduction of normal time has more importance than the reduction of allowance time, motion & time study techniques are most important for the reduction of normal time, physical environment improvement is most important for the reduction of allowance time as well.

  • PDF

An AHP Approach to Select the Task Related Technique for Work Efficiency Improvement in Shipbuilding Enterprise (AHP에 의한 조선기업의 작업능률향상을 위한 과업관련기법의 선택)

  • Kim, Tae-Soo;Lee, Kang-Woo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.30 no.2
    • /
    • pp.67-74
    • /
    • 2007
  • The objective of this research is to select the most effective technique among task related techniques(motion & time study, job redesign, physical environment improvement) for improving work efficiency in shipbuilding enterprise. This study consists of several principal steps. The first step is to design critical criteria in evaluating work efficiency in ship-building enterprises. The second step is to develop sub-criteria of the critical criteria. The third step is to develop a four level AHP(Analytic Hierarchy Process) structure using the critical criteria, sub-criteria and techniques among task related techniques. The fourth step is to develop the pairwise comparison matrix at each level of AHP structure, which was based on survey data collected at the H heavy industry. And the last step is to select the most effective technique among task related techniques using AHP analysis. The result of AHP analysis has shown clear difference in priority among task related techniques in terms of work efficiency of the shipbuilding enterprise: The reduction of normal time is more important than the reduction of allowance time in improving of the work efficiency. Motion & time study is the most important technique for the reduction of normal time, and physical environment improvement is the most important technique for the reduction of allowance time as well.

A Case Study on the Analysis of Man/Multi-Machine System Using Simulation (시뮬레이션을 이용한 작업자/복수기계 가동분석에 대한 사례연구)

  • Moon, Dug-Hee;Song, Cheng;Choi Mi-Jin;Jung, Jong-Yun
    • Journal of the Korea Society for Simulation
    • /
    • v.12 no.1
    • /
    • pp.21-34
    • /
    • 2003
  • This paper deals with a case study of workload analysis of an operator in an automatic line for machining the race of ball bearing. Eleven machines and three hoppers are installed in the line which is operated by an operator. The elements of operation are separated into machine controlled elements, operator controlled elements and machine/operator controlled elements. In order to analyze the system, time and motion studies are used for gathering input data for the simulation model. The first objective of this study is to evaluate whether the workload of operator is reasonable or not. The second objective is to increase throughput by reducing tact time and the last one is to increase frequencies of inspection by reducing interval. Thus we suggest some ideas for improvement, and as a result, the throughput is improved about 9%. In spite of the increasing of throughput, the allowance of operator is also increased about 4%.

  • PDF

Estimation of the Number of Optimal Dispensing Cases for the Community Pharmacist (개국약사의 적정조제건수 산출)

  • 이의경;박정영
    • Health Policy and Management
    • /
    • v.11 no.4
    • /
    • pp.88-108
    • /
    • 2001
  • Separation of prescribing and dispensing practice in Korea has changed the service pattern of the pharmacy. The prescription dispensing activities, however, are concentrated excessively on the pharmacies near hospitals or clinics. Thus this study was conducted to estimate the number of optimal dispensing cases for the community pharmacy. Forty-six pharmacies were selected using systematic stratified random sampling method, and ninety-five pharmacists were interviewed on their workload of dispensing and other activities at pharmacies. One hundred and seventy prescriptions were chosen based on the length of drug administration and drug dosage form, and the dispensing time was measured by time-watch method. Also pharmacy benefit claims data were analyzed to identify the characteristics of the pharmacies which performed more than optimal dispensing cases. According to the study results, the average work time per pharmacist per day was found to be 10hours 32minutes and the dispensing activities occupied 7hours 36minutes. It took 5.72minutes on average for each dispensing case. The optimal dispensing case was estimated as 75 cases under the condition of 10hours 32minutes work time and 6% allowance rate. Even though the pharmacies near hospitals or clinics participated dispensing services actively, only pharmacies near clinics dealt with more than optimal dispensing cases. For the pharmacies near hospitals they dealt with less than optimal cases, but drug administration period per prescription was almost 3 times longer than that of pharmacies near clinics. Thus the intensity of dispensing activities such as drug administration period is to be considered to estimate optimal dispensing cases more accurately.

  • PDF