A Study on the Verification of Heavy Overhaul Maintenance Allowances for the Maintenance Shop  

Choi, Sung-Hwan ((주)대우엔지니어링 철도사업그룹)
Lee, Hi-Sung (서울산업대학교 철도차량시스템공학과)
Publication Information
Journal of the Korean Society for Railway / v.13, no.1, 2010 , pp. 9-15 More about this Journal
Abstract
When designing the size of a heavy maintenance shop for rolling stock, it is required to arrange buildings and facilities in the minimum site so as to improve the maintenance efficiency. However, the fluctuation rate (hereinafter "allowance rate") on which factors such as service and maintenance fluctuation should be applied when estimating the size of the maintenance shop has been used without verification. The objective of the study is to calculate a reasonable allowance rate and to review its appropriateness through the analysis of the facilities layout and process simulation to absorb the above elements into the staying time in the heavy maintenance shop. Since the working time, in this study, is assumed to be average working time, 10~20% was given to the standard deviation of working time in consideration of difference between workers, and possible allowance rate was drawn by analysis of the simulation results. In the future, it is required to optimize the size of the shop by applying appropriate allowance rate through scientific review of such factors as O&M plan, R/S reserve rate, capability of the shop, outsourcing rate, standard work amount, and so on.
Keywords
Maintenance shop; Business process re-engineering; Fluctuation rate; Allowance rate;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 김동민 (2005), "신뢰성을 향상을 통해 전동차 차량상태를 최적화하고 운영 효율을 극대화하여 운영비 최소화를 위한 연구"
2 문형석 (2005), "차량 유지보수 체계의 이산사건 시뮬레이션 방법의 적용사례 연구."
3 장성용, 전병학, 이원영, 유재균 (2007), "시뮬레이션 기법을 활용한 열차 차량기지의 중정비검수 용량평가." 한국철도학회논문집, 제 10 권, 제 2 호, pp. 231-242.
4 일본철도차량 기계기술협회 (1996), "철도차량검수설비 "
5 한국철도시설공단 (2006), "경춘선 전동차 사무소 건설공사 실시설계 보고서."
6 J. Banks, J. S. Carson II, B. L. Nelson, and D. M. Nicon (2001), "Discrete event system simulation," 3rd Ed. Prentice Hall
7 민영사, 박성현 (1993), "현대 실험계획법."
8 한국철도공사 (2005), "철도차량 유지보수 및 지침."
9 한국응용통계연구소 (1996), "지하철 5, 7, 8호선 차량의 3년 및 6년 검수를 위한 차량의 공정별 작업시간 분석".
10 L. McGraw-Hill, M. Averill, and W. D. Kelton (1991), " Simulation modeling and analysis," 2nd Ed.
11 한국철도기술연구원 (2000), "중정비 정기검사의 1 인당 용역원가 산출(3Y검사, 6Y검사)".
12 한국철도기술연구원 (2000), "전동차 중정비 검수업무의 외주화 방안에 관한 연구," pp. 208-230.
13 한국응용통계연구소 (1996), "서울특별시 도시철도공사 전동차 중정비 용역 실행을 위한 연구," pp. 187-430.
14 일본정차장 선로배선연구회 (1984), "정차장선로배선 Hand Book."
15 최성환, 홍용기, 이희성, 김승환 (2009), "시뮬레이션과 BPR을 응용한 Layout 기반의 철도차량기지 중정비 검수여유율 검증," 한국철도학회 추계학술대회 논문집.