• Title/Summary/Keyword: actual working days

Search Result 39, Processing Time 0.04 seconds

Optimal Period by Calculating and Appling Correction Factor based on Setting of Non-Working Days of Construction Projects (건설공사의 작업불능일 기준설정에 의한 보정계수 계산 및 적용을 통한 최적공기 산정)

  • Lee, Pil-Yoon;Lee, Seong-Won;Byun, Yo-Seph;Cho, Choong-Yeun;Lee, Min-jae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.669-676
    • /
    • 2018
  • Schedule management in construction work is an important step for determining the construction period. On the other hand, there is a difference between the planned schedule and execution schedule because the estimation and calculation of Non-Working days, in which possible at the design stage is not performed properly. This paper proposes a method for estimating the working days by analyzing characteristics of the major work type and estimating the Non-Working days reflecting the Chuseok and New Year Holidays, which is the closest method to the actual work in the schedule planning. By applying the correction factor of the existing method and the improved method for the same construction in the same site, improved method was reduced by 22 days (9.1%) based on the actual working days. The importance of schedule management was confirmed as an example by comparing the data before and after the application of the standard (plan). These results show that the schedule delays, which are caused by the inconsistency between actual working days calculation that had been practiced conventionally and the working days on the schedule table, can be prevented. In addition, it will help to establish a schedule plan that is closer to reality.

Optimization of Estimating Duration of the Structural Frame for the High-rise Apartment Housing during the Winter season -Focusing on One Cycle Time Scheduling Mechanism of the Typical Floor- (동절기 아파트 골조공사의 적정공기 산정에 관한 연구 - 기준층 사이클 공정분석을 중심으로 -)

  • Bang Jong-Dae;Han Choong-Hee;Kim Sun-Kuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.170-178
    • /
    • 2004
  • Public construction companies have strictly followed a rule that they should not work in the wet area such as structural frame for a certain period during the winter season. It is usually known that the non-working period during the winter causes increase of the project duration, and the project cost escalation. Also, it makes negative effects on national economy because it reduces workers income. Therefore, the site work for the structural frame should be performed even during the whiter season. But the site work for the structural frame during that period cannot proceeds in the same way as during other periods, and requires a different method for estimating project duration. Through an analysis of time scheduling mechanism, actual working days are obtained for 1 cycle of typical floors in the structural frame during these periods, and non-working days of 5 years average are calculated based on calendar day using data of 5 years weather forecasts for that season. This study proposes an optimized way of estimating project duration for 1 cycle of typical floors in the structural frame during these periods. This estimating method uses the combined actual working days and non-working days of 5 years' average, and the estimated results are confirmed by being compared with field data. This study is expected to be used in estimating the construction duration of the structural frame during the winter season.

The Estimation of Construction Duration for High School Buildings Based on the Actual Data (실적자료에 의한 고등학교 시설 공기산정)

  • Kwon Dong-Chan;Lee Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.138-145
    • /
    • 2004
  • The construction duration for any building or facilities such as high school building influence the quality of the building as well as the total cost for them. Since there are no guidelines to estimate construction duration correctly, an employer(or owner) estimate it by their own experience or intuition. Therefore some conflicts related to construction duration happen between contract parties during construction. The purpose of this study is to suggest a predictive model which helps decision makers calculate exact net working days for high school building construction at the early stage of the construction project. To measure net working days for high school construction, 15 data were collected from actual spot in Incheon region. Multiple linear regression analysis was conducted to obtain the model which calculate construction duration for the substructure, the superstructure and the finishing works. total construction duration could be obtained by adding net working days to non working days which would be based on the meteorological statistics for Incheon region since 1974 to 2003.

Correlation between the Profitability and Working Capital Practices: A Case Study in the Gulf Cooperation Council

  • KHAN, Mohammed Abdul Imran;ALAM, Md. Shabbir;SYED, Ahsan Jamil
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.8 no.3
    • /
    • pp.229-235
    • /
    • 2021
  • The ability of entrepreneurs to arrange working capital is the key to maximizing the profitability of small- and medium-sized enterprises and the wealth of entrepreneurs. The study investigates the correlation between entrepreneurs' working capital management and the profitability of SMEs listed on six Gulf Cooperation Council (GCC) stock exchanges between 2019 and 2020. The secondary data is collected from the financial statements of SMEs listed on the six GCC stock exchanges. Actual sample for the research study was a total of 136 small- and medium-sized enterprises selected using purposive sampling methods. Four research models were considered in this analysis, all ending up affecting gross profits. The selected entrepreneurial SMEs were listed on six different Gulf Cooperation Council stock exchanges during 2019-2020. The fixed financial assets ratio, financial debt ratio, and company size are used as control variables and data were analyzed using multiple regression. The research results demonstrate that there is a statistically significant negative correlation between profitability measured by gross profit and cash cycle and the components of the cash cycle (including days of accounts receivable and days of inventory). The study further reveals that there is no significant correlation between gross profit and days of accounts payable.

Process Optimization Method Based on Emergency Construction Work Scenario (돌관공사 시나리오 기반 공정관리 최적화 방안)

  • Lee, Si-Hyun;Lee, Seung-hak;Woo, Mi-Sun;Son, Jae-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.117-118
    • /
    • 2015
  • These days buildings have more possibilities to occur construction delay as many variables and risks are inherent in them due to the enlargement and complexity. When a project is delayed, it generates extra working expenses and this causes a dispute between the employer and the constructor. Most construction sites conduct emergency construction work to recover the delay of the project duration. When an emergency construction is carried out in the actual construction site, it's necessary to utilize and distribute the proper working groups based on the procedure of successor and predecessor. Many constructions, however, have been going only with more number of work forces and working time. This study suggests a process management optimization plan with an application of emergency construction scenario by using linear programing.

  • PDF

A Study on the Factors of Absenteeism among the Manufacturing Workers (제조업 근로자들의 결근요인 분석)

  • Lee, Dong-Bae;Lee, Tae-Yong;Cho, Young-Chae;Lee, Young-Soo;Oh, Jang-Kyun;Park, Am
    • Journal of Preventive Medicine and Public Health
    • /
    • v.26 no.4 s.44
    • /
    • pp.574-586
    • /
    • 1993
  • This study was to examine the actual conditions and contributing factors of absenteeism in manufacturing workers. Subjects were 1,184 workers employed in Taejon city and the observation period for absenteeism was 3 months (June to August), 1992. We obtained the following results. 1. Percentage of the absentees among the studied subjects were 21.1% in gross absence and 6.9% in sickness absence. Gross absence rate of subjects was 1.2% and sickness absence rate was 0.5%. 2. In the group of absentees, mean days of absence was 2.8 days and those of sickness was 4.4 days. Mean days of sickness absence due to injury was higher than that of illness, but the total days of sickness absence was high in extremity injuries, trunk injury, general fatigue, head injury, musculoskeletal problem in that order. 3. Variables contributing to the absence were job classification, education level, working hours per day, exposure of noxious factor, worker classification. 4. In the group of absentees, variables influencing the gross absence rate were working atmosphere, body mass infer, working environment, working hours per day but those of the sickness absence were working hours per day, education level and working atomosphere.

  • PDF

Comparative Study on the Job Satisfaction of Part-time Nurses and Internship Nurses (시간제 간호사 및 인턴간호사의 직무만족도에 관한 비교연구)

  • Choi, Sook-Ja
    • Research in Community and Public Health Nursing
    • /
    • v.10 no.1
    • /
    • pp.93-105
    • /
    • 1999
  • Recently, Korean health care industry managers are paying more attention to customer oriented service, the rationalization of business administration, and quality control of service to adjust their business to outer environment since IMF bailout program. They are focusing on the cost reduction through remodeling the size and structure of man power, viz. labor flexibility. Nurses are not free from this juncture and contingent nurses are increasing fast. This article intends to verify the actual condition of two types of contingent nurses -part-time nurses and internship nurses-and to compare their job satisfaction to provide basic resource for efficient management of nurse man power. The concrete goals of this article are; Firstly, to verify the actual condition of their employment. Secondly, to compare their job satisfaction. And Thirdly, to the relation between employment condition and job satisfaction. To accomplish these research goals, a statistical survey was executed, in which 384 questionnaires - 66 for manager nurses, 318 for contingent nurses-were given to nurses working at 66 general hospitals-which have at least 100 beds-in Seoul. Among them, 121 questionnaires-of 28 general hospitals-were returned. Then, the data coded and submitted to mean, standard deviation, T-test, variance analysis (ANOVA), correlation analysis, multiple regression analysis with SAS program. The research results of the contingent nurses are followings: 1. Two types of contingent nurses shows similar age spans: they are mostly 21 - 30 years old and unmarried. But internship nurses have high level of educational career. Part - time nurses spread at general beds, out -patient part, intensive care part, operation part, etc, but internship nurses work mostly at general beds. 2. Two groups shows difference in actual employment condition: average employment career of part -time nurses is 7.0 months but internship nurses' is 2.0 months: average duty-on days per month of part - time nurses are 23.7 days but internship nurses' are 24.8 days. But there are little difference in average working time per day: 7.7 hours for part -time nurses and 0 hours for internship nurses. 3. The average wage per month for part -time nurses is 836,026 won but for internship nurses is 557,428 won-66.7% of part-time nurses'. Both groups are enjoying little additional pay. 4. Both groups are getting job not so much through advertisement of newspaper or hospitals as through acquainted person or college. 5. Both groups show very high level of job satisfaction: 3.2195 for part -time nurses and 3.2881 for internship nurses. But they show very low satisfaction on payment level compared with other categories and two groups show meaningful difference(P<.0001). 6. The multiple regression test reveals the factors related with job satisfaction: wage level, working part(OR or ICU), age, job career, and motive of contingent job-taking('because I can take care of family duties at the same time') influence positively: motive of contingent job-taking('because I can work regularly without alternation') influences negatively.

  • PDF

Evaluation of Reasonableness of the Recommended Spraying Amount Equation for De-icing Chemicals (도로 제설제 권장 살포량 산정식의 적정성 평가)

  • Kim, Jin Guk;Yang, Choong Heon
    • International Journal of Highway Engineering
    • /
    • v.19 no.4
    • /
    • pp.9-18
    • /
    • 2017
  • PURPOSES : This study evaluates the reasonableness of the recommended amount of deicing chemicals based on historical data for snow removal. The result can be used to aid decision-making for the reservation of cost-effective de-icing chemicals. METHODS : First, the recommended amount of de-icing chemical to use and historical usage data were evaluated to identify specific usage characteristics for each region. Road maintenance length and snow-removal working days were analyzed over the past five winter seasons. Next, differences in the recommended amount of chemical to use and actual use were compared using the Kolmogorov-Smirnov test. Last, the two types of data were analyzed using a chi-square test to verify if the two distributions of variation pattern are statistically significant. We found that there are significant differences between the data from each region during the past five winter seasons. RESULTS : The results showed that the equation for calculating the amount of de-icing chemical to use appears to be revised. CONCLUSIONS : The results imply that the equation for calculating the amount of de-icing chemical to apply as a national standard is very important when the public agency makes decisions related to snow-removal.

Evaluation for Operational Efficiency of Road Management Equipment using Analytical Hierarchy Process (계층분석법을 이용한 도로관리장비 운영의 효율성 평가)

  • Yang, Choong-Heon;Kim, In-Su
    • International Journal of Highway Engineering
    • /
    • v.14 no.5
    • /
    • pp.157-164
    • /
    • 2012
  • PURPOSES: Regional offices of the Ministry of Land, Transport and Maritime Affairs use a computerized system called KAMIS so as to manage road equipment systematically. Road agencies can record number of operating days by equipment, actual working hours, accumulated operating hours (or distance) by equipment, and operating cost. However, KAMIS does not provide critical information, although it is strongly related to efficient road management equipment operation. In other words, road agencies do not know whether they have sufficient equipment to handle their actual work. METHODS: Therefore, this study suggests a methodology to evaluate for operational efficiency of road management equipment using analytical hierarchy process(AHP). First of all, estimated weights related criteria can be produced by AHP, and then use operational history by pieces of equipment. RESULTS: Results show that importance of management work can differ from weather conditions through five areas. CONCLUSIONS: Commonly, this results can imply to help save money for the purchase and maintenance of road management equipment, and they would improve the functional performance of KAMIS.

A Study on Determining the Optimal Amount of Labor Force for Cargo Handling in the Harbor (항만 하역 노동력의 최적 규모 결정에 관하여)

  • Lee, Cheol-Yeong;Jang, Yeong-Jun
    • Journal of Korean Port Research
    • /
    • v.3 no.1
    • /
    • pp.35-55
    • /
    • 1989
  • Today, about 99% of total import and export cargo in Korea is being transported through the port. The general trends of cargo handling show increases in capacity and speed, In order to cope with these trends, it is not only required to raise the efficiencies of port operation and function but also necessary to decide the optimal amount of the skilled labor force for cargo handling in the port. Cargo handling in the port is basically relied on the cargo handling facilities. Therefore, it is very important to reserve the amount of labor force for cargo handling system has been developed up to a certain level but the personnel management system which is the superior structure has not been followed well. In this study, therefore, we show a method to determine the required amount of labor force for cargo handling considering the amount of cargo and type of cargo handling work per each cargo, and the optimal amount labor force in cope with the fluctuation of the basic cargo handling labor force with respect to the time of in and out cargo flow in the viewpoint of minimizing the expences due to reservation of extra labor force than needed and firing employment of labor force using the Dynamic Programming. The derived algorithm is introduced into the computer simulation for Pusan port with the analyzed real data such as amount of cargo handling in the port with respect to working hour, cargo capacity, working step, the ratio of cargo handling facility and actual number of workers and we estimated the required labor force. As a result of analysis the labor force of Pusan port showed the over-employment such as maximum 21.4%, minimum 8.2% when we assumed that the averages of actual working hours and days were 8 hours in a day and 20 day in a month.

  • PDF