Kim, Jeong-Gil;Lee, Dong-Keun;Oh, Joo-Young;Nam, Ju-Seok
Journal of the Korean Society of Manufacturing Process Engineers
/
v.20
no.5
/
pp.111-120
/
2021
A tractor is an agricultural machine that performs farm work, such as cultivation, soil preparation, loading, bailing, and transporting, through attached working implements. Farm work must be carried out on time per the growing season of crops. As a result, the reliability of a tractor's transmission is vital. Ideally, the transmission's design should reflect the actual load during agricultural work; however, configuring such a measurement system is time- and cost-intensive. The design and analysis of a transmission are, therefore, mainly performed by empirical methods. In this study, a tractor with a measurement system was used to measure the actual working load in the field. Its hydro-mechanical transmission was then analyzed using the measured load. It was found that the velocity factor, load distribution factor, lubrication factor, roughness factor, relative notch sensitivity factor, and life factor affect the gear strength of the transmission. Also, loading conditions have a significant influence on the reliability of the transmission. It is believed that transmission reliability can be enhanced by analyzing the actual load on the transmission, as performed in this study.
Korean Journal of Construction Engineering and Management
/
v.9
no.2
/
pp.182-189
/
2008
In private and public construction works, cost estimation and site productivity management are based on designed labor quantities calculated by the Standard Quantities per Unit (SQU). The designed labor quantities are regarded as the basis for insurance costs and safety and environmental costs and also affect the progress measurement of construction works. Even though the designed labor quantities from the SQU has been considered to be different from actual labor quantities put to construction works, there is no research that empirically analyzes the statistical differences. This study analyzes actual labor quantities of form workers, steel-bar fabricators, concrete pourers in reinforced concrete works of the 43 apartment projects, and compares the actual labor quantities to labor quantities from the SQU. It goes further to scrutinize the critical reasons underlying the differences through a survey on 65 practitioners and interviews with 32 site managers and supervisors. The regression models of labor quantities of the apartment concrete work produced by the present study will contribute to reasonable construction contracts based on the past actual costs and practical site management by the actual labor quantities.
The Internet is flourishing and the World Wide Web is growing at an exponential rate. A fundamental concept of Intranet, the so-called second wave, was introduced only a few years ago. Intranets have been embraced by corporate users of information services and made substantial inroads in strategic vision documents and procurement practices. Business organizations have come to the conclusion that they require an extensive data repository in order to acquire a competitive advantage in a dynamically change market. This rich assortment of data must further be delivered and deliverable enterprise-wide in a secure and cost-efficient manner. Information technology(IT) has created the Intranet as a vitally important mechanism for the storage, dissemination, and even the analysis data. The present study is an attempt to develop a more through understanding of the potential and actual impact of the Intranet on organizational functions and activities. Expecially, it also consists of an effort to assess the impact of the Intranet on work collaboration. The research also addresses the issue of how the Intranet affects work collaboration and shapes or modifies business activities. The results of literature review and study revealed that middle managers believe that the extent of the Intranet use is significantly related to improvements in overall organizational functions and activities. While communication, decision-making, productivity, work collaboration, and business activities are all enhanced by Intranet use, Work Collaboration appears to be most dramatically improved by Intranet use.
International conference on construction engineering and project management
/
2020.12a
/
pp.30-37
/
2020
In the building construction, the steel-frame work occupies an important position in terms of structure, cost and quality. Especially in Japan, steel frames have traditionally been the main structure of many buildings. For steel-frame works in such positions, this paper investigates an existing steel fabricator to clarify the actual conditions of design decision making process and management method in steel production process. This study focuses on a steel fabricator (Company M in the following sentences), whose main market is Japan and which has facilities in Thailand, China, and Japan. Company M uses QR codes to control the production status of products, and exchanges all information between inside and outside the company via specialized departments in the form of documents. The authors have already analyzed the relationship between production lead time and defect rate based on actual project data at Architectural Institute of Japan in 2016. In 2019, we expressed the process from the confirmation of the design information of the current steel frame to the production by WBS, and clarified the relationship between the production lead time and steel frame product quality structurally. In this paper, the authors reoport the progress of the survey conducted so far, the positioning of the collected data, and the future survey policy.
Purpose: This study is to contribute to the development of monitoring technology through the increase of confidence in construction monitoring by deriving the analysis of construction monitoring cost and improvement measures of railway tunnel construction in Seoul. Method: It presents the status on design and contract of construction monitoring cost, status on application construction monitoring cost and its analysis, analysis on safety management cost and quality management cost, expansion of application of the price calculation standard for monitoring management services to improve this, and monitoring for direct order of ordering organization. Results: If the monitoring management service that was meanwhile ordered as included in the construction work is performed by the directly selected company of ordering organization through the preliminary screening for bidding qualification, then the improvement of monitoring quality and the accurate monitoring data can be secured. Conclusion: For the price calculation standard for monitoring management service, the application of actual cost addition method under the Engineering Promotion Act and the calculation standard of monitoring management cost for standard estimation for ground survey should be extended through the direct order of ordering organization, not the method to be included in the net construction cost where it is performed by a subcontractor via contractor.
Korean Journal of Construction Engineering and Management
/
v.10
no.6
/
pp.58-66
/
2009
Due to a shortage of professional labor and the stagnant construction industry in recent days, there has been an increasing demand for securing profitability through cost reduction. Though its importance in the cost and its great influence on the safety and durability of structures, the labor intensiveness of rebar work has caused a serious problem of rising cost accompanied by the loss of rebar materials. In the plant manufacturing process, rebar is cut and bent at the automated facilities and conveyed to the construction site, which makes it possible to manufacture higher-quality bars and to reduce the losses from rebar materials. Different from the expectation, however, this type of plant manufacturing still has not been active since its first introduction in 1990s. In this study, a research on the actual condition of rebar manufacturing plant has been implemented and a standardized rebar manufacturing has been provided as a way to activate rebar manufacturing.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.450-453
/
2003
It is very important to examine and compare initial plan with earned value repeatedly in construction. For this purpose, progress measurement, which reflects the actual progress correctly, is required and it is necessary that accurate field data should be offered. To measure the progress, the entire project mutt be divided into unit works that have an accurate scope of work, and required information must be distributed to the all parties. Under the circumstances of domestic construction industry which focus on the specifications, progress measurement needs to reflect the information of schedule as well as cost that includes the quantity of unit work and construction expenses. Therefore this research proposes weighted method of progress measurement based on the information of cost and schedule.
Purpose: Frequently, the apartment management offices have difficulties in effective repair works due to their insufficient technological capability to operate long-term repair program. There also have been many cases of failure in executing urgent repairs mainly because the repair allowance has not accumulated enough for the repair works on time. This study aimed to determine core items in apartment maintenance in order to reduce the confusion and unnecessary efforts for the management office by suggesting simple list of repair items. Method: Core items are defined using several indicators. The degrees of necessity for repair work(NRW) are calculated combining the impacts to living, safety, and aesthetics. Then the degrees of burden of repair cost(BRC) are estimated by analyzing actual long-term repair program of three apartment complexes. Lastly the degrees of accumulation demand for repair allowance(AD) are calculated with NRW and BRC. Result: The core items and essential items are suggested for three apartment types as case studies based on the indicators of NRW, BRC, and AD. Then, the required accumulated allowance per $m^2$ was calculated to effectively implement repair works.
This work presents an iterative mesh partitioning approach to improve the efficiency of parallel substructure finite element computations. The proposed approach employs an iterative strategy with a set of empirical rules derived from the results of numerical experiments on a number of different finite element meshes. The proposed approach also utilizes state-of-the-art partitioning techniques in its iterative partitioning kernel, a cost function to estimate the computational cost of each submesh, and a mechanism that adjusts element weights to redistribute elements among submeshes during iterative partitioning to partition a mesh into submeshes (or substructures) with balanced computational workloads. In addition, actual parallel finite element structural analyses on several test examples are presented to demonstrate the effectiveness of the approach proposed herein. The results show that the proposed approach can effectively improve the efficiency of parallel substructure finite element computations.
Software industry has put more emphasis on maintenance and enhancement work than on the new development. The existing effort estimation models can still be applied to maintenance projects, though modifications are needed. This paper suggests a way to estimate the size of a maintenance project from the regression analysis of ISBSG's benchmarking data. First of all, among the 3 elements(addition, modification and deletion of the program) which influences the software cost, we selected and classified 4 groups from a total of 8 which shows actual maintenance cost from ISBSG's data. Moreover, we developed statistical model and a model which uses RBF(Radial Basis Function) Network and after evaluating each functions we concluded that the RBF Network is superior to the statistical model.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.