The Cost Monitoring of Construction Projects through Earned Value Analysis

  • Waris, Muhammad;Khamidi, Mohd Faris;Idrus, Arazi
    • Journal of Construction Engineering and Project Management
    • /
    • 제2권4호
    • /
    • pp.42-45
    • /
    • 2012
  • In construction industry, the term 'procurement' is considered as a project based job where clients and contractors are always keen to observe performance indicators. These indicators represent financial and non-financial efficiency of project activities. Among these, the monitoring of financial indicators such as cost monitoring is an ongoing process and its importance cannot be undermined during the project life cycle. It can be monitored by using traditional approach of direct reporting of actual cost against budget. However, the comparison of budget versus actual spending does not indicate the worth of the work which is completed at any given time. This approach does not represent the true cost performance of the project. Because of these limitations, this paper discusses the applications of Earned Value Analysis (EVA) for cost monitoring of construction projects in Malaysia. Besides traditional approach, EVA is a three-dimensional approach that compares three cost indicators i.e. the budgeted value of work scheduled with the earned value of physical work completed and the actual cost of work completed. Therefore, cost monitoring by EVA is an objective measure of actual work performed. This paper uses a case study, an example application of EVA as a cost monitoring tool. This case study reaffirms the benefits of using EVA for project cash flow analysis and forecasting.

조경공사 적산방식의 비교연구 - 실적공사비와 표준품셈의 단가비교 - (Comparative Study of Cost Estimate System in Landscape Architectural Construction - Comparison of Unit Price between Actual Construction Cost and Standard Quantity per Unit -)

  • 정운수;최기수
    • 한국조경학회지
    • /
    • 제40권2호
    • /
    • pp.97-111
    • /
    • 2012
  • 본 연구는 공공건설공사 중 조경공사 적산의 단가 비교로 적정 공사비 산출방안을 모색하고자 하였다. 2011년 상반기 실적단가에서 조경공사로 분류되는 12항목 중 유사기준인 7항목을 대비하며, 준용 공종은 5개 현장에 적용된 실적단가 80항목 중 비교 가능한 35항목을 유사기준인 2011년 3월의 표준품셈 단가로 대비하였다. 조경부문 7항목의 실적공사비율은 항목별로는 104.86%, 총공사비로는 92.09%이다. 실적공사비율이 높은 이유는 암반 적용 여부로 씨앗뿜어붙이기의 높은 비율도 있지만, 근본적인 이유는 잔디와 씨앗뿜어붙이기의 사면처리 비용 때문이므로, 품셈의 불합리성과 토양 종류별 기준별 보정계수 규정을 세분할 필요가 있다. 토목과 건축 준용부문 35항목의 실적공사비율은 항목별로 78.65%, 총공사비로는 71.31%(70.17%)이다. 이는 실적단가가 구조적으로 실제 금액을 반영하지 못하는 점과, 품셈은 인력시공에서 현실성이 결여된 때문으로 판단된다. 국토해양부 발표인 85.1~91.2%의 실적공사비율은 신규 전환품목 단가이므로, 이 결과는 실제적인 실적공사비율로 추정되며, 실적단가가 적정 비율을 보이도록 검증 후 보완하고 표준품셈도 이러한 실적자료 등으로 보완이 필요하다.

소규모 건축공사의 적정 실적공사비 단가보정 모델 개발 (Development of an Unit Cost Modification Model for Proper Actual Cost Data in Small Building Construction Projects)

  • 김강식;현창택;홍태훈;조성민;문현석
    • 한국건축시공학회지
    • /
    • 제10권1호
    • /
    • pp.81-89
    • /
    • 2010
  • 정부는 2004년부터 원가산정체계를 실적공사비 중심으로 전환하였다. 이러한 실적공사비는 계약단가를 기준으로 산정되며, 현재 10억원 이상의 공공 건설공사에 적용되고 있다. 그러나 대형공사 위주의 평균단가로 구성되어 있는 실적공사비를 10억원 미만의 소규모 건축공사에 직접적으로 반영하게 됨으로써 소규모 건축공사의 실행금액이 계약금액 이상으로 증가되는 경우가 빈번히 발생하고 있다. 뿐만 아니라, 이에 따른 영업이익의 감소로 기업운영 및 생산성 등에 악영향을 미치는 등과 같은 여러 문제들이 야기되고 있다. 따라서 10억원 미만의 소규모 건축공사에 실적공사비를 적용하기 위해서는 사업의 규모 등을 반영할 수 있는 단가보정 방안이 있어야 한다. 이에 본 연구에서는 실적공사비를 10억원 미만의 소규모 건축공사에 적용하는데 발생할 수 있는 단가적용의 문제를 해결하기 위하여 실적단가를 보정할 수 있는 실적공사비 단가보정 모델을 개발하였다. 이 모델은 소규모 건축공사의 생산성과 적정한 이윤을 책정하는데 도움을 줄 수 있으며, 소규모 건설업체의 경영이 악화되는 것을 방지할 수 있을 것으로 판단된다. 그리고 발주처는 예산편성 시 현실성 있는 공사비를 확보할 수 있을 것으로 기대된다.

실적공사비 분석을 통한 공공주택 공사비 추정에 관한 연구 (A Study on the Presumption of Construction Cost of Public Apartment by Analyzing Actual Construction Cost)

  • 윤우성;이현철;이한민;고성석
    • 한국건설관리학회논문집
    • /
    • 제10권2호
    • /
    • pp.132-144
    • /
    • 2009
  • 본 연구에서는 기 준공된 국내 공공주택의 실적공사비 분석을 토대로 공공주택 공사비 추정을 위한 기초자료를 제시하고자 하였다. 이에 대한주택공사(이하 주공)에서 발주하여 2004년부터 2007년까지 준공된 각 지역별 23개의 공공주택을 연구 대상으로 선정하여, 실제 투입 및 정산된 실적공사비를 분석하였다. 분석항목으로는 주요 직접비 항목인 공통가설, 건축, 토목, 기계설비 4개의 공종을 대상공종으로 하였으며, 물가상승률을 고려한 경상가 기준의 투입 공사비를 준공연도, 지역, 연면적, 분양방식별로 분류하고, 이에 따른 $3.3m^2$당 실적공사비를 각 공종별로 비교 분석하여 평균 실적공사비를 토대로 한 공사비의 유추와 산정식을 분석 제시하였다.

시멘트 액체방수 공사의 작업조 기반 품셈을 위한 생산량 및 노무량 분석 (Analysis of Actual Labor and Productivity for Based Work Crew Standard of Cement Liquid Watertight Construction)

  • 하기주;최민권;이동렬;하민수;하재훈;김외곤
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.171-174
    • /
    • 2009
  • The standard estimation system, used to estimate the predetermined cost of construction work, is measured by the standard and typical construction methods and field conditions. And the standard estimation system is applied to basic data for the measuring of construction cost, such as the consumed quantity of material, labor hours, and machinery cost. However it does not reflect sufficiently for the diversity and reality of constructions work Therefore, this study is recognized the necessity of new cost estimation models for the rational construction cost estimation. To improve estimation technique and construction ability, it was analyzed labor hours, production volume based on the work crew in construction work.

  • PDF

실적공사비에 의한 지하철 공사비 예측모형에 관한 연구 (A Study on the Prediction-Formulas of Approximate Estimate Based on Actual Work Cost for Subway)

  • 박종혁;전영배;박홍태
    • 한국재난정보학회 논문집
    • /
    • 제9권1호
    • /
    • pp.11-21
    • /
    • 2013
  • 본 연구는 2004년 이후 도입된 실적 공사비 제도에 의하여 착공된 지하철 건설공사를 대상으로 실적공사비, 공사규모 그리고 시간을 고려하여 공사비를 예측하는 식을 제시하였다. 11개의 지하철공사 자료를 이용하여 지하철 공사비 예측을 위한 비용-규모 지수 n(신뢰범위:0.5~0.7)을 구한 결과, 총공사비 0.713, 순공사비 0.77로 도출되었다. 본 연구에서 제시한 공사비 예측 식 모델은 향후 지하철 공사 적용 현장의 사업기획, 예비조사, 타당성조사, 기본설계 단계에서 개산 공사비를 추정하는데 효과적으로 적용할 수 있을 것이다.

수로터널공사의 효율성 분석을 통한 굴진속도 및 직접공사비 분석 - 구경 5.0m 중심으로 (Analysis of Excavation Speed and Direct Construction Cost Based on the Operating Productivities of TBM Method Site - Diameter 5.0m Target)

  • 박홍태;이양규
    • 한국재난정보학회 논문집
    • /
    • 제8권4호
    • /
    • pp.328-335
    • /
    • 2012
  • 건설공사의 표준품셈에 의한 자원기반 적산방식은 정부고시 노임단가와 기자재의 공시가 격에 표준적이고 보편적인 공법 및 공종에 대한 단위작업당 재료량, 노무량, 장비사용시간 등을 수치로 표시한 품을 곱하여 견적하였다. 그러나 자원기반 적산방식은 실제 거래가격을 적절히 반영하지 못하는 한계점이 발생하였다. 따라서 본 연구는 이러한 한계점을 극복하기 위하여 새로운 시도로 수로터널 현장을 대상으로 Cutter 점검/교환, TBM 정비, TBM 점검/급유, 후속설비, 광차, 운영교대, 갱내보강/낙반보강, 안전/회의의 작업 공종 별로 TBM 굴진 생산성을 분석하고, 이를 근거로 순굴진속도를 분석하여 실적 공사비를 분석하였다. 본 연구에서 제시하는 실적공사비 산정 접근법은 TBM 수로터널 현장에서 실적 공사비를 예측하는데 유용한 도구로 활용할 수 있을 것으로 확신한다.

교육시설 BTL 사업의 실적공사비 적용을 위한 작업분류체계(WBS) 구축 (A Model of Work Breakdown Structure for being applied to Historical Data in BTL Project for Educational Facilities)

  • 김성겸;조창연;손재호;김재온
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.499-502
    • /
    • 2007
  • 정부는 기존의 품셈에 의한 예정가격 산정 방식을 폐지하고, 실적계약 단가를 근거로 하는 실적공사비 적산제도를 도입하여 시행중에 있다. 그러나 현재 BTL 교육시설물 예정가격 산정방법의 경우 표준화된 작업분류체계(WBS : Work Breakdown Structure) 및 내역서 작성지침의 부족으로 인하여 단가 산정에 정확한 근거 마련이 힘든 실정이다. 따라서 본 연구에서는 BTL로 발주된 교육시설물의 내역서를 바탕으로 BTL 교육시설물의 실적공사비 적용을 위한 작업분류체계(WBS : Work Breakdown Structure) 구축을 목적으로 한다. 이를 통해 일반 시설물과는 다른 특징을 가지는 교육시설물 분류체계를 구축하고 이를 이용한 공사비 항목 및 유지보수비 항목의 체계화가 가능할 것으로 예상된다.

  • PDF

Prediction Model of Final Project Cost using Multivariate Probabilistic Analysis (MPA) and Bayes' Theorem

  • Yoo, Wi Sung;Hadipriono, FAbian C.
    • 한국건설관리학회논문집
    • /
    • 제8권5호
    • /
    • pp.191-200
    • /
    • 2007
  • This paper introduces a tool for predicting potential cost overrun during project execution and for quantifying the uncertainty on the expected project cost, which is occasionally changed by the unknown effects resulted from project's complications and unforeseen environments. The model proposed in this stuff is useful in diagnosing cost performance as a project progresses and in monitoring the changes of the uncertainty as indicators for a warning signal. This model is intended for the use by project managers who forecast the change of the uncertainty and its magnitude. The paper presents a mathematical approach for modifying the costs of incomplete work packages and project cost, and quantifying reduced uncertainties at a consistent confidence level as actual cost information of an ongoing project is obtained. Furthermore, this approach addresses the effects of actual informed data of completed work packages on the re-estimates of incomplete work packages and describes the impacts on the variation of the uncertainty for the expected project cost incorporating Multivariate Probabilistic Analysis (MPA) and Bayes' Theorem. For the illustration purpose, the Introduced model has employed an example construction project. The results are analyzed to demonstrate the use of the model and illustrate its capabilities.

건설공사의 사고예방비용에 대한 투자효과 분석 (The Benefit Cost Analysis of the Accident Prevention Cost in Construction Work)

  • 박종근
    • 한국안전학회지
    • /
    • 제20권1호
    • /
    • pp.113-118
    • /
    • 2005
  • This study delivers the actual condition of investment for industrial accident prevention based on survey of 500 construction sites from 'reports far industry safety and health' published by Korea Occupational Safety & Health Agency (KOSHA). The various research techniques were used such as technical statistic analysis for construction industry, cost comparison of industrial accident prevention and accident loss. A formula was deduced to calculate accident loss and accident frequency by accident prevention cost through regression analysis.