1 |
Kim, K.Y. (2007). "Cost estimating model framework development for construction step-by-step of the bridge project." Journal of Construction & Transportation R & D Performance Forum, pp.120-123.
|
2 |
Yun, W.S. (2009). "Public housing construction cost through the actual cost analysis." Journal of Construction Engineering and Management, Vol.10, No.2, pp.132-144.
|
3 |
Dodge, W.J. (1962). "The module estimating technique as on aid in developing plant capital cost." Journal of the Construction.
|
4 |
Jelen, F.C. (1983). Cost and Optimization Engineering. McGraw-Hill Book Company.
|
5 |
Kim, B.S. (2009). "Study on the cost estimation for the basic design steps model at RC rigid frame bridge." Journal of Construction Engineering and Management, Vol.10 No.2, pp.111-119.
|
6 |
Lee, B.H. (2003). Construction Project Management Theory and Practice. Gumi Publication. Ostwald, P.F. (1984). Cost Estimating. Prentice-Hall Inc.
|
7 |
Williams, C., Miller, P.E., Leonard, G. (1980). Estimating and Cost Control in Plumbing Design. VAN Nostrand Reihold Company.
|