• Title/Summary/Keyword: actual Construction cost

Search Result 399, Processing Time 0.026 seconds

Comparative Study of Cost Estimate System in Landscape Architectural Construction - Comparison of Unit Price between Actual Construction Cost and Standard Quantity per Unit - (조경공사 적산방식의 비교연구 - 실적공사비와 표준품셈의 단가비교 -)

  • Jung, Un-Soo;Choi, Key-Soo
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.40 no.2
    • /
    • pp.97-111
    • /
    • 2012
  • This study aims to find a proper construction cost calculation method by comparing unit prices of cost estimate in landscape construction among other public ordering construction projects. There were 7 out of 12 items from the actual work cost in the first half of 2011 were compared. The 12 items were classified as landscape Architectural construction and the 7 items were the approximate standard. As applied construction types, the comparable 35 items out of the 80 actual work cost items applied to 5 sites were compared to the unit price of the standard quantity per unit in March 2011, which was the approximate standard. Actual construction rate of the 7 items in the category of landscape sector was 104.86% for each item and 92.09% as a total construction cost. The high actual construction rate was caused by the high rate of seed spray depending on the status of applying rocks. However, there were more fundamental reasons for the cost generated from aslope treatment for grass and seed spray. So, it requires more detailed regulations on the modification factors for each soil type, the standard and needs to improve theillogical standard quantity per unit system. Actual construction rate of the 35 items in the applied sectors of civil engineering and architecture was 78.65% for each item and 71.31% (70.17%) as a total construction cost. This shows that actual unit cost cannot reflect actual cost structurally and standard quantity per unit system lacks practicality in terms of construction due to thelabor force. 85.1~91.2 % actual construction rate announced by the Ministry of Land and Maritime Affairs referred to the newly switched items. So the result was estimated as actual construction rate. This requires supplementation after verification in order to make the actual work cost produce at a proper rate. Also, standard quantity per unit system needs complementation with these actual data and so on.

Development of an Unit Cost Modification Model for Proper Actual Cost Data in Small Building Construction Projects (소규모 건축공사의 적정 실적공사비 단가보정 모델 개발)

  • Kim, Kang-Shik;Hyun, Chang-Taek;Hong, Tae-Hoon;Jo, Seong-Min;Mun, Hyun-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.81-89
    • /
    • 2010
  • Since 2004, the government has changedthe cost estimate system to one of an actual cost basis in order to calculate the optimum construction cost by reflecting changes in circumstance on the construction site in a timely manner. Currently, this is being applied to public construction work forover a billion won of actual cost data in estimation by contract unit cost. However, directly reflecting actual cost, which for large-sized construction work was originally an average unit cost, to a small building, entails the application of a low discount rate for the cost of materials, labor, etc. and therefore can frequently give rise to cases in which the actual cost of work performed exceeds the contract sum, which in turn causes problems such as decreased revenues, bad effectson business operation, productivity, etc. Therefore, to apply actual cost to small-sized construction work (less than a billion won), there should be a plan to modify unit cost in a manner that can reflect project scale, etc. in order to resolve the problem of unit cost application of actual cost to small-building construction projects. The unit cost modification model for proper actual construction cost in small-scale construction projects developed by this study will help to increase the relevant productivity and proper gain, preventing the aggravation of business operations. Organizations placing orders are also expected to be able to secure a more realistic construction cost in arranging the budget.

The Cost Monitoring of Construction Projects through Earned Value Analysis

  • Waris, Muhammad;Khamidi, Mohd Faris;Idrus, Arazi
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.4
    • /
    • pp.42-45
    • /
    • 2012
  • In construction industry, the term 'procurement' is considered as a project based job where clients and contractors are always keen to observe performance indicators. These indicators represent financial and non-financial efficiency of project activities. Among these, the monitoring of financial indicators such as cost monitoring is an ongoing process and its importance cannot be undermined during the project life cycle. It can be monitored by using traditional approach of direct reporting of actual cost against budget. However, the comparison of budget versus actual spending does not indicate the worth of the work which is completed at any given time. This approach does not represent the true cost performance of the project. Because of these limitations, this paper discusses the applications of Earned Value Analysis (EVA) for cost monitoring of construction projects in Malaysia. Besides traditional approach, EVA is a three-dimensional approach that compares three cost indicators i.e. the budgeted value of work scheduled with the earned value of physical work completed and the actual cost of work completed. Therefore, cost monitoring by EVA is an objective measure of actual work performed. This paper uses a case study, an example application of EVA as a cost monitoring tool. This case study reaffirms the benefits of using EVA for project cash flow analysis and forecasting.

A Study on the Presumption of Construction Cost of Public Apartment by Analyzing Actual Construction Cost (실적공사비 분석을 통한 공공주택 공사비 추정에 관한 연구)

  • Yoon, Woo-Sung;Lee, Hyun-Chul;Lee, Han-Min;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.132-144
    • /
    • 2009
  • In this study, the basic data for calculating the proper construction cost as minimizing the uncertainty at the stage of forecasting construction cost with the basis of the analysis on the actual construction cost within completed domestic public apartment house. In this regard, 23 public apartment houses by each region which were ordered by the Korea National Housing Corporation and completed from 2004 to 2007 were selected as the objects of study. Four works such as common temporary installation, construction work, civil work and machine/equipment work which are the important direct cost items based on the actually inputted and settled construction costs were classified by completion year, region, architectural area, and the distribution type considering inflation rate. The sequent actual construction costs per 3.3m2 were compared and analyzed by each work, the proper construction costs were analogized and the calculating formula were presumed with the basis of average actual construction costs to be analyzed and presented.

A Study on the Prediction-Formulas of Approximate Estimate Based on Actual Work Cost for Subway (실적공사비에 의한 지하철 공사비 예측모형에 관한 연구)

  • Park, Jong-Hyuk;Jeon, Yong-Bae;Park, Hong-Tae
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.1
    • /
    • pp.11-21
    • /
    • 2013
  • This study proposed cost prediction equation model by considering duration, construction, size, actual cost with the subway construction started by the actual cost system which was introduced since 2004. Costs - scale exponent n(confidence range: 0.5 to 0.7) for cost prediction of subway construction was drawn total cost(0.713), net cost(0.77) in point of the 11 subway construction data. The cost prediction equation model of the subway construction which was presented in this study is able to effectively apply to business planning, preliminary investigation, feasibility study, basic design stage to estimate the approximate cost in the future.

The Establishment of Improvement Direction through Case Analysis of Cost Standards in Overseas Construction Engineering (해외 건설엔지니어링분야 대가기준 사례분석을 통한 개선방향 마련)

  • Ko, Hyun A;Han, Jae Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.165-166
    • /
    • 2020
  • The standard for the cost calculation in the field of domestic construction engineering can be largely divided into the construction cost ratio method and the actual cost addition method. However, the standard for calculating the cost of the construction cost ratio method is a trend to switch to the actual cost addition method due to limitations such as not reflecting the characteristics of the construction. Therefore, this study aims to derive implications by investigating and analyzing examples of cost standards in the field of overseas construction engineering, such as the United States, and deriving directions for improvement in domestic cost standards in the future.

  • PDF

Application of Probabilistic Risk Analysis for Profitability-Evaluation of Apartment Reconstruction Projects (아파트 재건축사업의 수익성평가에 대한 확률적 위험도 분석 모형 적용방안)

  • Woo, Kwang-Min;Lee, Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.167-176
    • /
    • 2006
  • It was found that Korean Standard of Estimate which has been used as the only basis of cost estimate of public construction projects had some side effects such as jerry-build construction and over-estimation because it failed to reflect the current price and the state-of-the-art construction methods in a changing construction environment. Therefore, the government decided to gradually introduce historical construction cost into cost estimate of public construction projects from 2004. This paper presents analytic criteria and a process model for deducing more current and reasonable historical construction cost for contract items from not only previous contract prices but also all of the other bid prices that were not contracted. The procedure of estimating actual unit cost proposed in this paper focuses on the removal of abnormal values including strategically too low or high prices and the time correction. In addition, basic research is conducted for the correction of actual unit cost through the analysis of fluctuation of bid price depending on bidding types and rates of successful bid. It is anticipated that the effective use of the proposed process model for estimating actual unit cost would make the cost estimation more current and reasonable.

Development of Construction Cost Estimation Model with the Actual Cost Data for Rural Development Project (실적자료에 의한 농어촌정비사업 사업비 결정에 있어서의 단가모델 구축)

  • 배연정;이정재;윤성수
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 1999.10c
    • /
    • pp.359-364
    • /
    • 1999
  • Providing the reasonable construction cost at the initial stage of the rural development project, is a kety factor of the each step of project , such as propriety analysis , cost planning , design, and planning the progress of work. The explainable construction cost can be estimated at the early stage using the actual cost data by statistical analysis. In this study, the influence factors are extracted by factor analysis with the actual cost data of rural development project, object cost model is developed by multiple regression analysis, and verify the developed cost model by Monte-Carlo simulation .

  • PDF

Analysis of Actual Labor and Productivity for Based Work Crew Standard of Cement Liquid Watertight Construction (시멘트 액체방수 공사의 작업조 기반 품셈을 위한 생산량 및 노무량 분석)

  • Ha, Gee-Joo;Choi, Min-Kwon;Yi, Dong-Ryul;Ha, Min-Su;Ha, Jae-Hoon;Kim, Oe-Gun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.171-174
    • /
    • 2009
  • The standard estimation system, used to estimate the predetermined cost of construction work, is measured by the standard and typical construction methods and field conditions. And the standard estimation system is applied to basic data for the measuring of construction cost, such as the consumed quantity of material, labor hours, and machinery cost. However it does not reflect sufficiently for the diversity and reality of constructions work Therefore, this study is recognized the necessity of new cost estimation models for the rational construction cost estimation. To improve estimation technique and construction ability, it was analyzed labor hours, production volume based on the work crew in construction work.

  • PDF

Methodology of data analyses under presence of outliers for estimating construction cost (공사비 예측시 이상값 존재하에서 데이터 처리 분석 방안)

  • O, Se-Dae;Huh, Young-Ki
    • KIEAE Journal
    • /
    • v.7 no.3
    • /
    • pp.31-37
    • /
    • 2007
  • Statistical analyses with actual data are used in estimating construction cost for many years, but collected data could include factors that distort analytical results, namely outliers. To enhance reliability in predicting construction cost, the methodology, which is able to identify outliers and determine how to manage them, is needed. Actual costs obtained from 22 construction projects were studied. It is found that there is substantial disparity between results considering outliers and results not considering ones. Therefore, it is to identify outliers and apply an optimum process in estimating construction cost when actual data is used in statistical analysis.