Browse > Article

Methodology of data analyses under presence of outliers for estimating construction cost  

O, Se-Dae (한국에이비엠건설(주), 경영혁신팀)
Huh, Young-Ki (부산대학교 건축학부)
Publication Information
KIEAE Journal / v.7, no.3, 2007 , pp. 31-37 More about this Journal
Abstract
Statistical analyses with actual data are used in estimating construction cost for many years, but collected data could include factors that distort analytical results, namely outliers. To enhance reliability in predicting construction cost, the methodology, which is able to identify outliers and determine how to manage them, is needed. Actual costs obtained from 22 construction projects were studied. It is found that there is substantial disparity between results considering outliers and results not considering ones. Therefore, it is to identify outliers and apply an optimum process in estimating construction cost when actual data is used in statistical analysis.
Keywords
outlier;
Citations & Related Records
연도 인용수 순위
  • Reference
1 신관호(2006), "국가간 위험분담의 경제적 요인 분석", 금융학회지 제11권 제1호
2 이명재, 이진용, 김규범, 원종호(2005), "국가지하수 관측소 층정자료의 이상값 분석", 한국지하수토양환경학회지 Vol. 10, No 1
3 성웅현, 양동우(2005), "중소벤처기업의 기술가치평가를 위한 할인율 추정에 관한 연구", 지식경영연구 제6권 제1호
4 박효열, 송용식, 김선국(2003), "공동주택 사업비 산정을 위한 표준DB 연구", 대한건축학회논문집 구조계 19권 6호
5 박효열, 송용식, 김선국(2003), "공동주택 실적공사 표준 DB를 이용한 COST MODEL", 대한건축학회논문집 구조계 20권 5호
6 성웅현(2005), "사업성 종합지수를 이용한 기술의 사업성 상대등급 평가에 관한 연구", 지식경영연구 제6권 제2호
7 남경두(1995), "Performance Comparison of Neural Networks and Univariate Linear Regression Models in the Presence of an Outlier", 건국대학교 경제경영연구소 상경연구, 제20집