Kim Yeoung-Noh;Shin Bong-Il;Lee Hee-Chul;Kwak No-Hong;Jeon Young-Soo;Park Sang-Ho;Lee Il-Moo
Proceedings of the KIPE Conference
/
2006.06a
/
pp.432-434
/
2006
The additional matters appear to be considered in several aspects for building up power-quality measuring system of transmission system(high voltage system) compared to distribution system(middle or low voltage system). Like in distribution system, input signals are also received from PT and CT source of voltage and current respectively in transmission system and applied in accordance with a certain rate. In this case, very big error rate can be occurred according to the specification of the measuring system as the applying rate is bigger than in distribution system beyond comparison. In addition, when the abnormal signal occurred such as sag/swell, interruption, transient etc., power quality of other sires linked to the system also should be checked to find the accurate cause of the abnormal power-quality signals from the corresponding. site. Accordingly, the accurate diagnosis on the condition of power quality for the system depends on the way how the synchronization system is brought along for each site. This paper will suggest the solution for the most effective system building focused on how to solve the problem of the error rate and synchronization described in the above when building up the measuring system of power quality for transmission system.
Kim, Yeoung-Noh;Shin, Bong-Il;Lee, Hee-Chul;Kwak, No-Hong;Jeon, Young-Soo;Park, Sang-Ho;Lee, Il-Moo
Proceedings of the KIEE Conference
/
2006.07a
/
pp.107-109
/
2006
The additional matters appear to be considered in several aspects for building up power-quality measuring system of transmission system(high voltage system) compared to distribution system(middle or low voltage system). Like in distribution system, input signals are also received from PT and CT source of voltage and current respectively in transmission system and applied in accordance with a certain rate. In this case, very big error rate can be occurred according to the specification of the measuring system as the applying rate is bigger than in distribution system beyond comparison. In addition, when the abnormal signal occurred such as sag/swell, interruption, transient etc., power quality of other sites linked to the system also should be checked to find the accurate cause of the abnormal power-quality signals from the corresponding site. Accordingly, the accurate diagnosis on the condition of Power quality for the system depends on the way how the synchronization system is brought along for each site. This paper will suggest the solution for the most effective system building focused on how to solve the problem of the error rate and synchronization described in the above when building up the measuring system of power quality for transmission system.
This study is aimed to develop a safety diagnosis system for fire pumps that detects normal and abnormal signals for the stable operation of the system. Hence, the following activities were carried out: first, a threshold value was identified for the normal operation and six abnormal operations (adherence of impeller, absence of water source, separation of pump and motor, run-stop operation, air inflow into the casing, and reverse-phase loss of the power line) reflecting changes in the current, flow and pressure of fire pumps; secondly, based on the identified signals, an algorithm capable of detecting three abnormal signals was developed and in terms of hardware, a current, pressure and flow sensor suitable for the analogue input values of NI-6009 was designed and installed. This combination of the hardware and software is applicable as a diagnosis system to ensure the stable operation of fire pumps.
It is important from prevention of the malfunction and an important accident by the failuer, to detect a failuer in revolution devices. The acoustic emission(AE) method is expected as means that defects an abnormal phenomenon of revolution devices earlily and utilized. Although a research example by the AE method is reported regarding a gears, little reserch has been conducted using the AE method for running gears in a bending fatigue process of spur gear teeth. Therefore, in this report, with two micro AE sensors attached to the side of the gear, AE was measured in a bending fatigue process of a carburizing gear by using the power circurating-type machine and AE source location in gear teeth were required. By various analysis in these data, the AE characteristics in the fatigue damaging process of the gear tooth were determined.
Using stretch sensors, a stuttering treatment training device that improve the abnormal breathing of stutterer was designed and developed. To improve stutterer's inadequate breathing method that is one of principal reason of stammering, the device estimates breathing method by checking the changes of the stretch sensor's resistances those are put on the chest and abdomen of user. And a vocal exercise program that carry out exercises only when the user maintains the abdominal breathing was designed. Using a PIC16C711 device that includes an A/D convertor, a main controller was designed and the vocal exercises software was developed using Director and C program with graphic user interface for user convenience. The controller sends the resistance data of sensors to PC through the serial port and the software verifies the breathing method. And the device was designed that the RTS (request to send) pin of serial port in PC is used as a power source so that it can work without any battery or other power source. Three stutterers have carried out the clinical experiments using the implemented device for two months and the results showed it was excellent to alleviate the stuttering.
According to the survey, abnormal condition of the system is the main source for interrupting an elevator service, especially faults in worm gears used for the traction machine. Worm gear is popularly used in traction machine for middle and low speed elevators. Elevators need high reliability and stability, because they are closely related to human life. Usually, traction machine is applied to drive the elevators that have height about 35 m and it is an important mechanical unit for riding quality in elevators. There are some research results about types of vibration fault for worm gear in International Association Elevator Engineers (IAEE). But this study concerns with diagnosis of various faults in elevator worm gear using vibration signal. The analysis of fault characteristics is compared with previous researches in traction machine.
Journal of the Korean Society of Mechanical Technology
/
v.13
no.3
/
pp.119-124
/
2011
Electric night storage heater was introduced and disseminated for power grid balancing and efficient management of power generation facility. But fuel cost for heating has been increased rapidly while the cost of electricity increased slightly. This abnormal rate system caused peak load in winter at last. To solve this problem, application of an air source heat pump was suggested. In the study, the effect of replacing night heater by heat pump and the economics were analysed. In addition the expectation of prospect of heat pump penetration was simulated based on surveyed and investigated data. As a result, fund supporting as well as institutional backing was needed for effective propagation and return of investment.
Coordination under short-circuit conditions is a systematic application of protective devices in the electrical power system, which, in response to a fault, will remove only a minimum amount of equipment from service. The objective is not only to minimize the equipment damage and process outage costs, but also to protect personnel from the effects of these failures. The coordination study of an electric power system consists of an organizes time-current study of all devices in series from the utilization device to the source. This study is a comparison of the time it takes the individual devices to operate when certain levels of normal or abnormal current pass through the protective devices. The objective of a coordination study is to determine the characteristics, ratings, and settings of overcurrent protective devices that will ensure that the minimum unfaulted load is interrupted when the protective devices isolate a fault or overload anywhere in the system. At the same time, the devices and settings selected should provide satisfactory protection against overloads on the equipment and interrupt short-circuit as rapidly as possible.
Web presence is one of the key issues for extensive deployment of Internet-of-Things (IoT). An obstacle to overcome for Web presence is relatively low computing power of IoT devices. In this paper, we present implementation of an IoT platform based on Constrained Application Protocol (CoAP) which is a web transfer protocol proposed by Internet Engineering Task Force (IETF) for the low performance IoT devices such as Wireless Sensor Network (WSN) nodes and micro-controllers. To qualify the performance of CoAP-based IoT system for such an application as smart grid, we designed a test platform consisting of Raspberry Pi2, Kmote WSN node and a desktop PC. Using open source softwares, CoAP was implemented on top of the platform. Leveraging the GET command defined at CoAP specification, performance of the system was measured in terms of round-trip time (RTT) from web application to the Kmote sensor node. To investigate abnormal cases among the test results, hop-by-hop delays were measured to analyze resulting data. The average response time of CoAP-based communication except the abnormal data was reduced by 23% smaller than the previous research result.
Roseline, Johnson Anitha;Vijayenthiran, Subramanian;V., Rajini;Mahadevan, Senthil Kumaran
Journal of Power Electronics
/
v.15
no.3
/
pp.670-684
/
2015
The hybrid cascaded multilevel inverter (HCMLI) is a popular converter topology that is being increasingly used in high power medium voltage drives. The intricacy of the control technique for a HCMLI increases with the number of levels and due to fluctuating dc voltages. This paper presents a novel offline quadrant search based space vector modulation technique to synthesize a sinusoidal output from a dispersed pattern of voltage vectors due to different voltages in the auxiliary unit. Such an investigation has never been reported in the literature and it is being attempted for the first time. The method suggested distributes the voltage vectors for a reduced total harmonic distortion at minimal computation. In addition, the proposed algorithm determines the maximum modulation index in the linear modulation range in order to synthesize a sinusoidal output for both normal and abnormal vector patterns. It is better suited for a wide range of practical applications. It is particularly well suited for renewable source fed inverters which utilize large capacitor banks to maintain the dc link, which are prone to such slow fluctuations. The proposed quadrant search space vector modulation technique is simulated using MATLAB/SIMULINK and implemented using a Nexys-2 Spartan-3E FPGA for a developed prototype.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.