• 제목/요약/키워드: a planning phase

검색결과 672건 처리시간 0.027초

GSI(Global Single Instance)기반의 Global ERP 구축 방법론 및 적용 사례 (A Methodology for Global ERP Implementation Based on GSI(Global Single Instance) and Its Application)

  • 이재광;조민호
    • 한국IT서비스학회지
    • /
    • 제7권3호
    • /
    • pp.97-114
    • /
    • 2008
  • Many companies have implemented ERP systems to enhance their process competitiveness. Since most ERP systems down to date are implemented and managed on each separated business-unit or company level, such systems run short of the consideration about global business processes and global system managements. In order to integrate a successful global ERP, it is essential to apply the well-systematic implementation methodology which considers global standardization and global IT requirements. It is, however, the actual circumstance that such well-structured methodologies for global ERP implementation are hardly shown not only from domestic site but from foreign one. This paper indicates the global ERP implementation guideline with integrated approach including; the standard process design for efficient execution of global business; the ERP implementation method considering global IT requirements; and, the management method for global system operation. GSI ERP methodology is composed of 3 Phase:Global Strategy Planning, Global Template Construction and Global Roll-Out. Phase1; Global Strategy Planning contains Environment Analysis, GSI direction and Implementation Plan. Phase2; Global Template Construction contains Business blueprint, GSI operation design and Global template implementation. Phase3; Global Roll-out contains local business analysis, local ERP implementation and Global ERP Operation.

A PROFIRABILITY MODEL BASED ON PRIMARY FACTOR ANALYSIS IN THE EARLY PHASE OF HOUSING REDEVELOPMENT PROJECTS

  • Kyeong-Hwan Ahn;U-Yeong Gim;Jong-Sik Lee;Won Kwon;Jae-Youl Chun
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.497-501
    • /
    • 2013
  • An important decision-making element for the success of housing redevelopment projects is a prediction of the profitability of redevelopment. Risk factors influencing profitability were deduced through a review of the literature about profitability and a risk analysis developed by a survey of maintenance projects. In addition, a profitability prediction depending on the analysis of risk factors is necessary to judge the business feasibility of a project in the planning stages. A profitability prediction model of management and disposal method, which is calculated by proportional rate and which helps estimate contributions to profitability, is proposed to prevent difficulties in business development. The proposed model has the potential to prevent interruptions, reduce the length of projects, generate cost savings, and enable rational decision-making during the project period by allowing a judgment of profitability at the planning stage.

  • PDF

고층 사무소건축의 공사비계획을 위한 웹 기반 개산견적 프로그램 (Web-Based Cost Planning Program for High-Rise Office Building)

  • 김기홍;박찬식;장선호
    • 한국건설관리학회논문집
    • /
    • 제6권2호
    • /
    • pp.69-79
    • /
    • 2005
  • The Purpose of cost Planning at the early Phase of construction Projects is to provide the clients with the appropriate cost information during the design decision-making process. Therefore, the cost planning process is expected not only to predict projects' cost accurately but also closely to coordinate with the design decision-making activities. This paper proposes a new cost planning method for the effective and efficient directions relating a design decision-making process. Strategies for this method are i ) to utilize elemental cost breakdown system, and ii ) to apply probabilistic distribution theories. Based on these strategic direction, this paper proposed a probabilistic cost planning model for high-rise office building projects. The suggested model provides appropriate cost information to meet clients limited budget and various project' requirements during the design decision-making process. This study is based on probabilistic distribution variables theories and the range estimating technique. This study also develops a web-based software program in order to apply the proposed cost planning model effectively in high-rise of office building construction practices.

비평탄 지형에서 사각 보행 로봇의 고장후 보행 (Post-Failure Walking of Quadruped Robots on a Rough Planar Terrain)

  • 양정민;박용국
    • 대한전기학회논문지:시스템및제어부문D
    • /
    • 제54권9호
    • /
    • pp.547-555
    • /
    • 2005
  • A fault-tolerant gait of multi-legged robots with static walking is a gait which can maintain gait stability and continue its walking against an occurrence of a leg failure. This paper proposes fault-tolerant gait planning of a quadruped robot walking over a rough planar terrain. The considered fault is a locked joint failure, which prevents a joint of a leg from moving and makes it locked in a known position. In this Paper, two-phase discontinuous gaits are presented as a new fault-tolerant gait for quadruped robots suffering from a locked joint failure. By comparing with previously developed one-phase discontinuous gaits, it is shown that the proposed gait has great advantages in gait performance such as the stride length and terrain adaptability. Based on the two-phase discontinuous gait, quasi follow-the-leader(FTL) gaits are constructed which enable a quadruped robot to traverse two-dimensional rough terrain after an occurrence of a locked joint failure. During walking, two front legs undergo the foot adjustment procedure for avoiding stepping on forbidden areas. The Proposed wait planning is verified by using computer graphics simulations.

패션브랜드의 온라인 상품기획 -자사몰 운영의 여성복 브랜드를 중심으로- (Online Product Planning in a Fashion Brand -Focused on the Brand of Women's Clothing Run by the Company's Mall-)

  • 이수진;이금희
    • 패션비즈니스
    • /
    • 제24권3호
    • /
    • pp.69-84
    • /
    • 2020
  • The purpose of this study is to analyze examples of online fashion product planning of domestic fashion brands, to grasp the characteristics and step-by-step problems in product planning, and to suggest product planning methods. This study consists of a literature study and a case study. The results of th study are as follows. First, in the information analysis and product planning, product planning according to analysis and targeting of online consumers should be conducted separately from offline, and the proportion of online-only products should be expanded. Second, in the design planning and product development stages, it should be possible to secure the quantity through the pre-planning of fabrics, a to acquire the novelty of the material through the preemption of good fabrics and the pre-planning of colors to secure competitive design. Third, in the convention, a systematic review process involving company members and customer review teams should be conducted to ensure product quality and sales-ability Fourth, in the production stage, the production period must be to reduce cost. Fifth, differentiated services according to the characteristics of their products for each brand in the promotion and sales stages. Based on this analysis, a desirable approach online product planning should first run promotion phase, increasing pre-planning for the product, and organizing specialize work and manpower issues.

건축 기획 지원 시뮬레이션 시스템 개발에 관한 기초 연구 (A Basic Study on the Development of Simulation Systems for Supporting the Pre-design Phase of Construction Projects)

  • 민경민;함남혁;김주형;김재준
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2007년도 정기 학술대회 논문집
    • /
    • pp.176-181
    • /
    • 2007
  • The widespread of IT technology caused a remarkable change in many industries and the construction industry is also one of them being influenced in the form of CIC(Computer Integrated Construction) and BIM(Building Information Modeling). Construction projects have many participants from various disciplines involved throughout the entire process. Therefore the success of the project greatly depend on the efficiency of decision-making using the information generated from each process stage. Looking from this aspect, the greatest potential value lies in the planning and pre-design stage when considering the construction life cycle. In this paper, we propose a project on developing a 3D object oriented simulation system for supporting the pre design phase. We define the needs for such system through previous case studies and suggest a to be process model. Finally we anticipate the effects that the project will eventually contribute to the construction industry.

  • PDF

군 시설사업 우선순위선정을 위한 의사결정모형에 관한 연구 (A Study on the Decision Making Models for Evaluating the Priorities in the Army Facility Enterprise)

  • 정성환;이상헌
    • 한국국방경영분석학회지
    • /
    • 제27권2호
    • /
    • pp.37-55
    • /
    • 2001
  • The main purpose of this study is to review the current system and to develop a decision support system for evaluating the priorities among those possible alternatives in the army facility enterprise. This paper also provides an information system which can be effectively applied to various criteria and stages in decision making process such as Planning and Programming phases in PPBEES. The model base of decision support systems uses the concepts of the analytic hierarchy process along with the supplementary techniques such as TOPSIS and 0-1 integer programming. Both AHP and TOPSIS are used scoring approaches in the Planning phase and IP is induced at the Programming phase to give GO/NO-GO solution for each project. We use Expert Choice, Excel and LINDO s/w's to implement a prototyped model. The proposed methodology in this paper enables the decision makers to evaluate the priority based on quantitative and qualitative data in a systematic way.

  • PDF

A path planning of free flying object and its application to the control of gymnastic robot

  • Nam, Taek-Kun;So, Myung-Ok
    • Journal of Advanced Marine Engineering and Technology
    • /
    • 제27권4호
    • /
    • pp.526-534
    • /
    • 2003
  • Motions of animals and gymnasts in the air as well as free flying space robots without thruster are subject to nonholonomic constraints generated by the law of conservation of angular momentum. The interest in nonholonomic control problems is motivated by the fact that such systems can not stabilized to its equilibrium points by the smooth control input. The purpose of this paper is to derive analytical posture control laws for free flying objects in the air. We propose a control method using bang-bang control for trajectory planning of a 3 link mechanical system with initial angular momentum. We reduce the DOF (degrees of freedom) of control object in the first control phase and determine the control inputs to steer the reduced order system from its initial position to its desired position. Computer simulation for a motion planning of an athlete approximated by 3 link is presented to illustrate the effectiveness of the Proposed control scheme.

모델 변환법을 이용한 점핑 로봇 제어의 운동경로 생성에 관한 연구 (A Study on Motion Planning Generation of Jumping Robot Control Using Model Transformation Method)

  • 서진호;산북창의;이권순
    • 한국정밀공학회지
    • /
    • 제21권4호
    • /
    • pp.120-131
    • /
    • 2004
  • In this paper, we propose the method of a motion planning generation in which the movement of the 3-link leg subsystem is constrained to a slider-link and a singular posture can be easily avoided. The proposed method is the jumping control moving in vertical direction which mimics a cat's behavior. That is, it is jumping toward wall and kicking it to get a higher-place. Considering the movement from the point of constraint mechanical system, the robotic system which realizes the motion changes its configuration according to the position and it has several phases such as; ⅰ) an one-leg phase, ⅱ) in an air-phase. In other words, the system is under nonholonomic constraint due to the reservation of its momentum. Especially, in an air-phase, we will use a control method using state transformation and linearization in order to control the landing posture. Also, an iterative learning control algorithm is applied in order to improve the robustness of the control. The simulation results for jumping control will illustrate the effectiveness of the proposed control method.

토목공사 기획 및 설계단계의 BIM 적용방안 연구 (BIM Application for Civil Engineering Project in Planning and Design Phases)

  • 강인석;김슬기;김현승;문현석
    • 한국BIM학회 논문집
    • /
    • 제1권1호
    • /
    • pp.26-31
    • /
    • 2011
  • 국내에서 BIM의 실무 활용은 건축공사 중심으로 적용되고 있다. 건축공사의 부위별 객체 특성이 정형적, 수직적, 반복적인 형태를 갖는 반면에 토목공사의 객체 특성은 비정형적, 수평적, 비반복적인 형태를 갖으므로 3D객체 구성이 어렵기 때문이다. 본 연구에서는 토목공사의 기획단계부터 설계단계까지의 업무 및 정보관리의 문제점을 파악한 후 BIM기반에서의 적용 프로세스를 제안하며, 제시한 프로세스를 기반으로 BIM시스템을 구축하여 교량공사를 대상으로 실무 적용성을 검토한다.