• Title/Summary/Keyword: Work Breakdown Structure

Search Result 168, Processing Time 0.03 seconds

Development of Project Management System for Geothermal Well Construction (지열발전 시추공 구축 프로젝트관리시스템 개발)

  • Kim, Kwang-Yeom;Lee, Seung-Soo
    • New & Renewable Energy
    • /
    • v.8 no.3
    • /
    • pp.38-46
    • /
    • 2012
  • Enhanced Geothermal System (EGS) among geothermal system types enables to produce sustainable energy even in non-volcanic region while conventional geothermal energy has been restricted to obtain only from hot and permeable formation such as in volcanic regions. Successful EGS project in terms of economy, however, can be expected only when the project is managed effectively considering most of influencing factors (e.g., tangible and intangible resources, cost, time, risks, etc.). In particular, well construction is of the utmost importance in geothermal project as it dominantly influences on time and cost in the whole project. Therefore, when it comes to viable geothermal project without abundant experience, managing drilling economically and efficiently is inevitable. In this study, a project management system for well construction in geothermal project based on project control system including work breakdown structure and cost account was developed to predict and assess the performance of drilling and to visualize the progress.

Risk Analysis in Tender Stage for Successful Construction Project in China (중국건설시장에서의 성공적인 발주를 위한 입찰단계 리스크 분석)

  • Liu, Yue-Fei;Oh, Jae-Hun;Huh, Young-ki
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.140-141
    • /
    • 2015
  • Although the depression of oversea construction market becomes more serious recent years, asian construction market is relatively dynamic, particularly in china. However, few research has been conducted about how to manage construction projects in china as foreign developers. Four important risks are identified from series of surveys using the WBS-RBS method, the result shows that the main risk of tender stage is 'Tender max price error', ' Bill of quantities error', 'Unusual low price' and 'Moral risk' respectively.

  • PDF

The Configuration of Work Breakdown Structure and Part Breakdown Structure for Light Railway Transit System (경량전철시스템 작업분류구조 및 부품분류구조 구성)

  • 목재균;이우동;이병송;최규형
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.71-77
    • /
    • 2000
  • The system is defined as groups which are operative, dependentive, configurational of all each others. In oner to develop the AGT system efficiently, the system engineering process has to be organized It will be started by the configuration of WBS and PBS. A WBS is a method of naming and organizing all of the wok elements to be done for a projects. It completely defines the projects, is normally prepared in an hierarchical during design and project execution. A number, or alpha-numeric identification, is assigned to every WBS elements. Also a hierachy of system physical components should be established. It named to PBS, which is a method of naming and organizing all of the physicals elements to be done far a projects. Therefore we will propose the WBS and PBS to fit for AGT system in this reports.

  • PDF

Field emission properties of diamond-like carbon films deposited by ion beam sputtering (이온빔 스퍼터링으로 제작된 다이아몬드성 카본 필름의 전계 방출 특성)

  • 안상혁;이광렬;전동렬
    • Journal of the Korean Vacuum Society
    • /
    • v.8 no.1
    • /
    • pp.36-42
    • /
    • 1999
  • Field emission behaviors from diamond-like carbon films were investigated. The films were deposited on n-type Si wafer by ion beam sputtering method using 3 cm Kaufman type ion source. Regardless of the film thicknesses and atomic bond structure, the emission current was much enhanced by electrical breakdown between anode and the film surface. The effective work function was estimated to be about 0.1 eV. In order to identify the emission site, tungsten tip was scanned the damaged region damaged region but localized to a specific site. Analysis using Auger electron spectroscopy and SEM shows that SiC compound was not a sufficient condition for the electron emission. This result showed that the enhanced emission was mainly due to the changes in the chemical bond of the damaged region rather than the enhanced electric field caused by the morphological change.

  • PDF

A Study on Traceability Management Using SWBS for a Naval Ship Acquisition

  • Jeong, Yeonhwan
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.7 no.2
    • /
    • pp.31-37
    • /
    • 2011
  • Korean Naval Ship acquisition processes are very complicate. There are 4 phases, Feasibility Study, Concept Design, Basic Design, Detail Design and Construction. A number of organizations and support groups exist to acquire naval war ships. Thus, It is very important how to establish traceability about requirements. This work has investigated how to improve traceability about requirements using Shipboard Work Breakdown Structure.

Optimization of 4H-SiC Superjunction Accumulation MOSFETs by Adjustment of the Thickness and Doping Level of the p-Pillar Region (p-Pillar 영역의 두께와 농도에 따른 4H-SiC 기반 Superjunction Accumulation MOSFET 소자 구조의 최적화)

  • Jeong, Young-Seok;Koo, Sang-Mo
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.30 no.6
    • /
    • pp.345-348
    • /
    • 2017
  • In this work, static characteristics of 4H-SiC SJ-ACCUFETs were obtained by adjusting the p-pillar region. The structure of this SJ-ACCUFET was designed by using a two-dimensional simulator. The static characteristics of SJ-ACCUFET, such as the breakdown voltages, on-resistance, and figure of merits, were obtained by varying the p-pillar doping concentration from $1{\times}10^{15}cm^{-3}$ to $5{\times}10^{16}cm^{-3}$ and the thickness from $0{\mu}m$ to $9{\mu}m$. The doping concentration and the thickness of p-pillar region are closely related to the break down voltage and on-resistance and threshold voltages. Hence a silicon carbide SJ-ACCUFET structure with highly intensified breakdown voltages and low on-resistances with good figure of merits can be achieved by optimizing the p-pillar thickness and doping concentration.

A Study on the Standard Method of Measurement Information Communication Field Contractors (정보통신시설공사 수량산출기준에 관한 연구)

  • Seol, Dong-Hwa;Lee, Kwang-Hee
    • Journal of The Institute of Information and Telecommunication Facilities Engineering
    • /
    • v.2 no.4
    • /
    • pp.52-63
    • /
    • 2003
  • This study proposes a change from the currentexpected price integrated system, which is based on the standard of estimated unit manpower and material, to a new actual construction cost integrated system. In order to implement it, the standard method of measurement organization system as well as the communication area standard of estimated unit manpower and material should be changed Moreover, the work breakdown structure and itemized structure should be assorted.

  • PDF

Development of a Generic-YWBS for Engineering Integrated Management of Sailing Yacht (세일링 요트 엔지니어링 통합 관리를 위한 Generic-YWBS 개발)

  • Lee, Dong Kun;Nam, Seung Hoon;Jeong, Yong-Kuk;Shin, Jong-Gye
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.51 no.1
    • /
    • pp.16-25
    • /
    • 2014
  • To develop a sailing yacht successfully, systematic engineering information is required including technologies from various companies and know-how about sailing yacht. The engineering information about sailing yacht has a complex and extensive structure. Therefore, a robust and high-level of management system is needed to manage the information. In this paper, we design and propose Generic-YWBS (Generic-Yacht Work Breakdown Structure), a work breakdown structure for sailing yachts. The Generic-YWBS is aimed at constructing sailing yachts and contains contents about product- and process-oriented information of sailing yachts. In addition, the Generic-YWBS plays an important role in managing the engineering information as a basic schema of database and system architecture. The Generic-YWBS is derived from fundamental WBS design processes and various rules about sailing yachts, for example, ISAF (International Sailing Federation) equipment rule and IRC rating rule, and a generic structure concept is applied for flexibility. The Generic-YWBS is applicable for various purposes. We designed a detailed code system in order to apply the Generic-YWBS to contents management system. The series of activities are realized through a web-based RIA(Rich Internet Application) program. This program manages the YWBS structure in an XML schema, and the Generic-YWBS management application offers a customizing function to be adapted in the field.

A Development of Unified and Consistent BIM Database for Integrated Use of BIM-based Quantities, Process, and Construction Costs in Civil Engineering

  • Lee, Jae-Hong;Lee, Sung-Woo;Kim, Tae-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.24 no.2
    • /
    • pp.127-137
    • /
    • 2019
  • In this study, we have developed a calculation system for BIM-based quantities, 4D process, and 5D construction costs, by integrating object shape attributes and the standard classification system which consist of Cost Breakdown System(CBS), Object Breakdown System(OBS) and Work Breakdown System(WBS) in order to use for the 4 dimensional process control of roads and rivers. First, a new BIM library database connected with the BIM library shape objects was built according to the CBS/OBS/WBS standard classification system of the civil engineering field, and a integrated database system of BIM-based quantities, process(4D), and construction costs(5D) for roads and rivers was constructed. Nextly, the process classification system and the cost classification system were automatically disassembled to the BIM objects consisting of the Revit-family style elements. Finally, we added functions for automatically generating four dimensional activities and generating a automatic cost statement according to the combination of WBS and CBS classification system The ultimate goal of this study was to extend the integrated quantities, process(4D), and construction costs(5D) system for new roads and rivers, enabling the integrated use of process(4D) and construction costs(5D) in the design and construction stage, based on the tasks described above.

A Case Study on Improvement for Optimal Organization of Work Items in Construction Bill of Quantities (건축공사 내역서 세부항목 구성에 대한 사례연구)

  • Noh, Hae-Ra;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.10a
    • /
    • pp.67-68
    • /
    • 2016
  • In construction management, BoQ(Bill of Quantities) has been commonly used for the cost estimation. However, many problems have been recognized about the work items used in the BoQ that could be varied by the experience and knowledge of the estimators or the project. Also, there are lots of work items that have to be written in BoQ even though the cost proportion of those items is relatively lower than the others. In this study we consider the way how to organize optimally the work items through the analysis of case. The results of this study could be useful for improving the efficiency of preparing construction BoQ and conducting Quantity take-off in our construction management practices.

  • PDF