• 제목/요약/키워드: Wind farm development process

검색결과 12건 처리시간 0.019초

육상풍력 적지분석 프로세스에 대한 연구 (The Study of Onshore Wind Farm Suitability Analysis Process)

  • 고정우;이병걸
    • 한국환경과학회지
    • /
    • 제25권3호
    • /
    • pp.457-464
    • /
    • 2016
  • The most wind farm development process in Korea still have not been defined since the history of the wind farm development experiences are very short compared to EU and other developed countries. Therefore, most wind farm development company and researchers have a lot of trouble to implement the wind farm development and need a guideline for the process. Establishing the wind farm needs a complex processes such as transportation system, construction conditions, natural environment and wind conditions etc. Specially, for the restricted development area, the social negotiation and legal minds are necessary. In the case, the decision making process of suitable wind farm area using GIS tool is very useful. However, before using GIS technique, we should understand the development processes and the items for surveying tools. Recently, suitability analysis of selecting Onshore Wind Farm has been studied to consider exclusion analysis to solve the limited develop condition problem. This paper proposed the onshore wind farm development process which can suitable to Korea wind farm environment based on European guideline with GIS tool. To estimate the processes, the processes are divided into two parts, the basic design and wind farm planning. Next, the planning stages are classified into five stages in which the factors for each step were considered.

풍력발전에 적합한 기본풍속 연구 (Study on Basic Wind Speed Suiteable for Wind Power Development)

  • 김정환;정호성;김형준;한정헌;박선규;최진웅
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2010년도 추계학술대회 초록집
    • /
    • pp.189.1-189.1
    • /
    • 2010
  • The wind farm where the wind velocity condition is excellent and economical can be established to produce power with the multiple wind power turbine. The wind velocity which is suitable to Wind Power Development must be evaluated for searching the economical wind farm on planning the wind farm. In this paper, based on wind speed data at 24 locations in Korea from 1971 through 2009, the basic wind velocity which can be applied to designing wind power development is estimated using the statiscal process. The wind velocity which is measured from observation stations is revised according to wind gauge's height and Circumferential environment. The wind speeds for 200 year's return period in 24 locations are determined using the Gumbel's distribution.

  • PDF

풍력발전단지 관리·분석 시스템의 Real-Time Simulator 도입을 위한 계통모델 연동방안 연구 (A Study About Grid Impose Method On Real-Time Simulator For Wind-Farm Management System)

  • 정승민;유연태;김현욱;장길수
    • 조명전기설비학회논문지
    • /
    • 제29권7호
    • /
    • pp.28-37
    • /
    • 2015
  • Owing to the variability of large-scaled wind power system, the development of wind farm management technologies and related compensation methods have been receiving attention. To provide an accurate and reliable output power, certain wind farm adopts a specified management system including a wind prediction model and grid expectation solutions for considering grid condition. Those technologies are focused on improving the reliability and stability issues of wind farms, which can affect not only nearby system devices but also a voltage condition of utility grid. Therefore, to adapt the develop management system, an expectation process about voltage condition of Point of Common Coupling should be integrated in operating system for responding system requirements in real-time basis. This paper introduce a grid imposing method for a real-time based wind farm management system. The expected power can be transferred to the power flow section and the required quantity about reactive power can be calculated through the proposed system. For the verification process, the gauss-seidel method is introduced in the Matlab/Simulink for analysing power flow condition. The entire simulation process was designed to interwork with PSCAD for verifying real power system condition.

항만해상풍력단지 건설기술 로드맵 수립 (Construction Technology Roadmapping for Port Offshore Wind Farm)

  • 김기윤;정석재;이석준
    • 디지털융복합연구
    • /
    • 제11권2호
    • /
    • pp.137-148
    • /
    • 2013
  • 본 논문의 목적은 항만해상풍력단지 건설을 위한 기술개발 로드 맵을 제시하는 것이다. FGI(Focus Group Interview)와 설문지를 이용한 AHP(Analytical Hierarchy Process) 방법을 적용해서 대/중/소 분류된 건설기술의 가중치를 도출했고, 분류된 건설기술에 대한 우선순위를 근거로 항만해상풍력단지 건설기술 로드 맵이 수립되었다. 기술 로드 맵은 항만해상풍력단지의 분류된 건설기술에 대한 R&D 사업을 달성하기 위한 20년간(2016년부터 2036년 까지)의 일정을 제시하고 있다. 이러한 건설기술 로드 맵은 녹색항만건설산업의 R&D 전략을 수립하기 위한 이정표로 활용될 수 있다.

블랙 숄즈 모델을 이용한 잠재적 풍력발전 위치의 경제적 가치분석 (The Economic Value Analysis of the Potential Wind Farm Site Using the Black-Scholes Model)

  • 심재훈
    • 산업경영시스템학회지
    • /
    • 제45권4호
    • /
    • pp.21-30
    • /
    • 2022
  • To mitigate the environmental impacts of the energy sector, the government of South Korea has made a continuous effort to facilitate the development and commercialization of renewable energy. As a result, the efficiency of renewable energy plants is not a consideration in the potential site selection process. To contribute to the overall sustainability of this increasingly important sector, this study utilizes the Black-Scholes model to evaluate the economic value of potential sites for off-site wind farms, while analyzing the environmental mitigation of these potential sites in terms of carbon emission reduction. In order to incorporate the importance of flexibility and uncertainty factors in the evaluation process, this study has developed a site evaluation model focused on system dynamics and real option approaches that compares the expected revenue and expected cost during the life cycle of off-site wind farm sites. Using sensitivity analysis, this study further investigates two uncertainty factors (namely, investment cost and wind energy production) on the economic value and carbon emission reduction of potential wind farm locations.

해상풍력 주민수용성 연구: 군산 말도를 중심으로 (A Study on Local Acceptance of Offshore Wind Farm: Focus on Maldo, Gunsan)

  • 이상혁;박재필
    • 신재생에너지
    • /
    • 제16권2호
    • /
    • pp.20-27
    • /
    • 2020
  • According to "The Renewable Energy 3020 Implementation Plan", offshore wind power accounts for 12 GW of the total new capacity of 48.7 GW. Like the south-west 2.5 GW offshore wind farm case, government-led development has had difficulty in securing the residents' acceptability. This study contributes to the study of local acceptance by analyzing the perceptions of Maldo residents. To this end, in-depth interviews were conducted with the head of a village and fishing village chief, and the entire contents of the interview were revised and analyzed. The cognitive structure of the stakeholders could be confirmed using semantic network analysis, which analyzes the network structure among words. Based on the analysis results, focusing on the identity frames related to the compensation process from previous national projects, gain vs. loss frames act as the dominant frame in terms of profits from offshore wind turbines. To invigorate offshore wind farms, the policy implications as follows. First, a negotiation organization should be organized to deal with strategic opposition by fishes. Second, installing offshore wind farms on a public water body will result in demands for compensation from various actors, and a licensed fishing territory as an offshore wind farm installation site should be considered.

Application of Neural Network for Long-Term Correction of Wind Data

  • ;김현구
    • 신재생에너지
    • /
    • 제4권4호
    • /
    • pp.23-29
    • /
    • 2008
  • Wind farm development project contains high business risks because that a wind farm, which is to be operating for 20 years, has to be designed and assessed only relying on a year or little more in-situ wind data. Accordingly, long-term correction of short-term measurement data is one of most important process in wind resource assessment for project feasibility investigation. This paper shows comparison of general Measure-Correlate-Prediction models and neural network, and presents new method using neural network for increasing prediction accuracy by accommodating multiple reference data. The proposed method would be interim step to complete long-term correction methodology for Korea, complicated Monsoon country where seasonal and diurnal variation of local meteorology is very wide.

  • PDF

풍력자원해석 및 에너지예측을 통한 풍력발전단지 설계 연구 (The Study of the Wind Resource and Energy Yield Assessment for the Wind Park Development)

  • 변효인;류지윤;김두훈
    • 신재생에너지
    • /
    • 제1권2호
    • /
    • pp.19-25
    • /
    • 2005
  • This study explains ther procedure that should be taken to develp a successful wind park project. It provides a guideline for the activities and studies to be done as a step by step solution. This study follows a chronological flow throughout the whole development Process. This Paper covers technical consideration, assessment of wind energy resource, wind Park siting and energy yield calculation This presented knowledge h3s been mostly gained by the experience from Youngduk wind park project. The further comparison study will be performed between the theoretical prediction and the actual yield of the Youngduk wind park.

  • PDF

방향별 후류를 고려한 풍력발전단지 연간 에너지 생산량 예측 프로그램 개발 및 적용 (Development of Wind Farm AEP Prediction Program Considering Directional Wake Effect)

  • 양경부;조경호;허종철
    • 대한기계학회논문집B
    • /
    • 제41권7호
    • /
    • pp.469-480
    • /
    • 2017
  • 풍력발전단지에서 연간 에너지 생산량 예측의 정확도를 위해서는 바람 방향별 후류영향에 의한 풍속감소와 이에 따른 발전량 손실을 효과적으로 계산하여야 한다. 본 연구에서는 연간 에너지 생산량 예측을 위하여 방향별 후류영향을 고려한 계산 프로그램을 개발하고, 예측 적합성을 확인하기 위해 실제 풍력발전단지의 연간 에너지 생산량 분석 결과 및 기존 상용 소프트웨어의 계산결과와 비교하였다. 적용된 계산식들은 기존 이론들을 바탕으로 하고 있어 상용 소프트웨어와 동일하지만 풍향별 후류영향 범위의 계산과정에서 차이가 있다. 비교결과 개발 프로그램은 실제 풍력발전단지 전체 시스템 이용율에 1% 이내로 근접하였고 기존 상용 프로그램을 이용한 예측 결과보다 2% 이상 실제 연간 시스템 이용율에 근접하는 결과를 보여주었다.

한우사 내부 위치 및 TMR 배합 작업에 따른 분진 모니터링 (Dust Concentration Monitoring in Korean Native Cattle Farm according to Sampling Location and TMR Process)

  • 박관용;권경석;이인복;여욱현;이상연;김준규
    • 한국농공학회논문집
    • /
    • 제59권4호
    • /
    • pp.75-83
    • /
    • 2017
  • Many parts of problems in livestock industry today are associated with organic dust. Endotoxin and toxic gasses on the surface of dust and dust itself can cause aesthetic displeasure and respiratory disease. It also reduces livestock productivity by suppressing immunity of animals and carrying microbes causing animal disease. However, dust level of cattle farm was rarely reported in Korea, and regulation for cattle farm worker does not exist. In this paper, dust concentration and environmental condition were regularly monitored in a commercial Korean native cattle farm. The measurement was conducted according to location and working activities. From the measurement, distribution of dust concentration was affected by wind environment, as the result of natural ventilation. TMR mixer was a major source of dust in target cattle house. The maximum inhalable dust concentration was 637.8 times higher than exposure limit as feed dropped into the TMR mixer. It was expected that dust generation could be affected by particle size and drop height of feed. This study suggests potential risk of dust in cattle farm, and necessity for latter study. Effect of aerodynamic condition and TMR processing should be investigated for dust reduction study.