• Title/Summary/Keyword: Wind farm development process

Search Result 12, Processing Time 0.022 seconds

The Study of Onshore Wind Farm Suitability Analysis Process (육상풍력 적지분석 프로세스에 대한 연구)

  • Ko, Jung-Woo;Lee, Byung-Gul
    • Journal of Environmental Science International
    • /
    • v.25 no.3
    • /
    • pp.457-464
    • /
    • 2016
  • The most wind farm development process in Korea still have not been defined since the history of the wind farm development experiences are very short compared to EU and other developed countries. Therefore, most wind farm development company and researchers have a lot of trouble to implement the wind farm development and need a guideline for the process. Establishing the wind farm needs a complex processes such as transportation system, construction conditions, natural environment and wind conditions etc. Specially, for the restricted development area, the social negotiation and legal minds are necessary. In the case, the decision making process of suitable wind farm area using GIS tool is very useful. However, before using GIS technique, we should understand the development processes and the items for surveying tools. Recently, suitability analysis of selecting Onshore Wind Farm has been studied to consider exclusion analysis to solve the limited develop condition problem. This paper proposed the onshore wind farm development process which can suitable to Korea wind farm environment based on European guideline with GIS tool. To estimate the processes, the processes are divided into two parts, the basic design and wind farm planning. Next, the planning stages are classified into five stages in which the factors for each step were considered.

Study on Basic Wind Speed Suiteable for Wind Power Development (풍력발전에 적합한 기본풍속 연구)

  • Kim, JungHwan;Jeong, HoSeong;Kim, HyeongJun;Han, JungHun;Park, SunKyu;Choi, JinWoong
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.11a
    • /
    • pp.189.1-189.1
    • /
    • 2010
  • The wind farm where the wind velocity condition is excellent and economical can be established to produce power with the multiple wind power turbine. The wind velocity which is suitable to Wind Power Development must be evaluated for searching the economical wind farm on planning the wind farm. In this paper, based on wind speed data at 24 locations in Korea from 1971 through 2009, the basic wind velocity which can be applied to designing wind power development is estimated using the statiscal process. The wind velocity which is measured from observation stations is revised according to wind gauge's height and Circumferential environment. The wind speeds for 200 year's return period in 24 locations are determined using the Gumbel's distribution.

  • PDF

A Study About Grid Impose Method On Real-Time Simulator For Wind-Farm Management System (풍력발전단지 관리·분석 시스템의 Real-Time Simulator 도입을 위한 계통모델 연동방안 연구)

  • Jung, Seungmin;Yoo, Yeuntae;Kim, Hyun-Wook;Jang, Gilsoo
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.7
    • /
    • pp.28-37
    • /
    • 2015
  • Owing to the variability of large-scaled wind power system, the development of wind farm management technologies and related compensation methods have been receiving attention. To provide an accurate and reliable output power, certain wind farm adopts a specified management system including a wind prediction model and grid expectation solutions for considering grid condition. Those technologies are focused on improving the reliability and stability issues of wind farms, which can affect not only nearby system devices but also a voltage condition of utility grid. Therefore, to adapt the develop management system, an expectation process about voltage condition of Point of Common Coupling should be integrated in operating system for responding system requirements in real-time basis. This paper introduce a grid imposing method for a real-time based wind farm management system. The expected power can be transferred to the power flow section and the required quantity about reactive power can be calculated through the proposed system. For the verification process, the gauss-seidel method is introduced in the Matlab/Simulink for analysing power flow condition. The entire simulation process was designed to interwork with PSCAD for verifying real power system condition.

Construction Technology Roadmapping for Port Offshore Wind Farm (항만해상풍력단지 건설기술 로드맵 수립)

  • Kim, Ki-Yoon;Jeong, Suk-Jai;Lee, Suk-Jun
    • Journal of Digital Convergence
    • /
    • v.11 no.2
    • /
    • pp.137-148
    • /
    • 2013
  • This paper aims to presents a systematic procedure for the development of construction technology roadmap, which can consider the offshore wind farm on port. Then the weight among the large/medium/small classified construction technology has identified through the AHP(Analytical Hierarchy Process) approach using FGI(Focus Group Interview) and questionnaire study. Based on the priority for classified construction technology a construction technology roadmap for port offshore wind farm was also developed. The technology roadmap suggests the time frame(20 years, from 2016 to 2036) to complete R&D work for the classified construction technology of port offshore wind farm. Such construction technology roadmap can be utilized as a milestone in setting up the R&D strategy in the green port construction industry.

The Economic Value Analysis of the Potential Wind Farm Site Using the Black-Scholes Model (블랙 숄즈 모델을 이용한 잠재적 풍력발전 위치의 경제적 가치분석)

  • Jaehun Sim
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.45 no.4
    • /
    • pp.21-30
    • /
    • 2022
  • To mitigate the environmental impacts of the energy sector, the government of South Korea has made a continuous effort to facilitate the development and commercialization of renewable energy. As a result, the efficiency of renewable energy plants is not a consideration in the potential site selection process. To contribute to the overall sustainability of this increasingly important sector, this study utilizes the Black-Scholes model to evaluate the economic value of potential sites for off-site wind farms, while analyzing the environmental mitigation of these potential sites in terms of carbon emission reduction. In order to incorporate the importance of flexibility and uncertainty factors in the evaluation process, this study has developed a site evaluation model focused on system dynamics and real option approaches that compares the expected revenue and expected cost during the life cycle of off-site wind farm sites. Using sensitivity analysis, this study further investigates two uncertainty factors (namely, investment cost and wind energy production) on the economic value and carbon emission reduction of potential wind farm locations.

A Study on Local Acceptance of Offshore Wind Farm: Focus on Maldo, Gunsan (해상풍력 주민수용성 연구: 군산 말도를 중심으로)

  • Lee, Sanghyuk;Park, Jaepil
    • New & Renewable Energy
    • /
    • v.16 no.2
    • /
    • pp.20-27
    • /
    • 2020
  • According to "The Renewable Energy 3020 Implementation Plan", offshore wind power accounts for 12 GW of the total new capacity of 48.7 GW. Like the south-west 2.5 GW offshore wind farm case, government-led development has had difficulty in securing the residents' acceptability. This study contributes to the study of local acceptance by analyzing the perceptions of Maldo residents. To this end, in-depth interviews were conducted with the head of a village and fishing village chief, and the entire contents of the interview were revised and analyzed. The cognitive structure of the stakeholders could be confirmed using semantic network analysis, which analyzes the network structure among words. Based on the analysis results, focusing on the identity frames related to the compensation process from previous national projects, gain vs. loss frames act as the dominant frame in terms of profits from offshore wind turbines. To invigorate offshore wind farms, the policy implications as follows. First, a negotiation organization should be organized to deal with strategic opposition by fishes. Second, installing offshore wind farms on a public water body will result in demands for compensation from various actors, and a licensed fishing territory as an offshore wind farm installation site should be considered.

Application of Neural Network for Long-Term Correction of Wind Data

  • Vaas, Franz;Kim, Hyun-Goo
    • New & Renewable Energy
    • /
    • v.4 no.4
    • /
    • pp.23-29
    • /
    • 2008
  • Wind farm development project contains high business risks because that a wind farm, which is to be operating for 20 years, has to be designed and assessed only relying on a year or little more in-situ wind data. Accordingly, long-term correction of short-term measurement data is one of most important process in wind resource assessment for project feasibility investigation. This paper shows comparison of general Measure-Correlate-Prediction models and neural network, and presents new method using neural network for increasing prediction accuracy by accommodating multiple reference data. The proposed method would be interim step to complete long-term correction methodology for Korea, complicated Monsoon country where seasonal and diurnal variation of local meteorology is very wide.

  • PDF

The Study of the Wind Resource and Energy Yield Assessment for the Wind Park Development (풍력자원해석 및 에너지예측을 통한 풍력발전단지 설계 연구)

  • Byun, Hyo-In;Ryu, Ji-Yune;Kim, Doo-Hoon
    • New & Renewable Energy
    • /
    • v.1 no.2 s.2
    • /
    • pp.19-25
    • /
    • 2005
  • This study explains ther procedure that should be taken to develp a successful wind park project. It provides a guideline for the activities and studies to be done as a step by step solution. This study follows a chronological flow throughout the whole development Process. This Paper covers technical consideration, assessment of wind energy resource, wind Park siting and energy yield calculation This presented knowledge h3s been mostly gained by the experience from Youngduk wind park project. The further comparison study will be performed between the theoretical prediction and the actual yield of the Youngduk wind park.

  • PDF

Development of Wind Farm AEP Prediction Program Considering Directional Wake Effect (방향별 후류를 고려한 풍력발전단지 연간 에너지 생산량 예측 프로그램 개발 및 적용)

  • Yang, Kyoungboo;Cho, Kyungho;Huh, Jongchul
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.41 no.7
    • /
    • pp.469-480
    • /
    • 2017
  • For accurate AEP prediction in a wind farm, it is necessary to effectively calculate the wind speed reduction and the power loss due to the wake effect in each wind direction. In this study, a computer program for AEP prediction considering directional wake effect was developed. The results of the developed program were compared with the actual AEP of the wind farm and the calculation result of existing commercial software to confirm the accuracy of prediction. The applied equations are identical with those of commercial software based on existing theories, but there is a difference in the calculation process of the detection of the wake effect area in each wind direction. As a result, the developed program predicted to be less than 1% of difference to the actual capacity factor and showed more than 2% of better results compared with the existing commercial software.

Dust Concentration Monitoring in Korean Native Cattle Farm according to Sampling Location and TMR Process (한우사 내부 위치 및 TMR 배합 작업에 따른 분진 모니터링)

  • Park, Gwanyong;Kwon, Kyeong-Seok;Lee, In-bok;Yeo, Uk-Hyeon;Lee, Sang-Yeon;Kim, Jun-Gyu
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.59 no.4
    • /
    • pp.75-83
    • /
    • 2017
  • Many parts of problems in livestock industry today are associated with organic dust. Endotoxin and toxic gasses on the surface of dust and dust itself can cause aesthetic displeasure and respiratory disease. It also reduces livestock productivity by suppressing immunity of animals and carrying microbes causing animal disease. However, dust level of cattle farm was rarely reported in Korea, and regulation for cattle farm worker does not exist. In this paper, dust concentration and environmental condition were regularly monitored in a commercial Korean native cattle farm. The measurement was conducted according to location and working activities. From the measurement, distribution of dust concentration was affected by wind environment, as the result of natural ventilation. TMR mixer was a major source of dust in target cattle house. The maximum inhalable dust concentration was 637.8 times higher than exposure limit as feed dropped into the TMR mixer. It was expected that dust generation could be affected by particle size and drop height of feed. This study suggests potential risk of dust in cattle farm, and necessity for latter study. Effect of aerodynamic condition and TMR processing should be investigated for dust reduction study.