• Title/Summary/Keyword: Wall pile

Search Result 209, Processing Time 0.027 seconds

A Study on the Pullout Behavior of Shear Connectors which Fix the Additional Wall to the PHC-W Piles in the PHC-W Type Permanent Building Retaining Wall (PHC-W 흙막이를 활용한 건축영구벽체에서 PHC-W말뚝과 증설벽체를 합벽시키는 전단연결재의 인발거동에 관한 연구)

  • Jin, Hong-min;Kim, Sung-su;Choi, jeong-pyo;Choi, Yongkyu
    • Journal of the Korean Geotechnical Society
    • /
    • v.33 no.12
    • /
    • pp.107-113
    • /
    • 2017
  • Shear Connector should be used to fix the PHC pile with extension wall in order to utilize PHC-W retaining wall as permanent wall. The pullout behaviours on shear connectors anchored into PHC-W pile were observed as two modes. The first type behaviour showed that after reaching the maximum pullout resistance, the anchorage was broken and shear connector was pulled out abruptly. The second type behaviour showed that even after arriving the maximum pullout resistance, the anchorage was not destroyed and there was a progressive increase in pullout displacement. The maximum pullout resistance of the steel anchor shear connector is larger than that of deformed bar shear connector. The larger the diameter and the longer the embedment length of shear connector, the higher the maximum pullout resistance would be. The pullout displacements corresponding to the maximum pullout resistance of the shear connector showed various ranges regardless of the materials, the diameters and the anchoring lengths. A-D20 shear connectors showed a pull-out displacement of about 8~10 mm. A-D16, D-D19 and D-D16 shear connectors exhibited a pulling displacement of about 14~20 mm, but a pulling displacement of about 6~10 mm when the anchoring lengths were 50 and 80 mm.

Behavior Analysis of Earth Retaining Wall with S.G.P method (강판을 사용한 흙막이 벽체공법(SGP) 거동분석)

  • Cho, Seong-Ha;Choi, Gwan-Woo;You, Kwong-Ho;Kim, Sung-Duk;Kim, Young-Hyun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.1269-1277
    • /
    • 2008
  • In this study, the behavior of retaining wall composed with soldier pile and steel plate is analysed. The steel guided plate(SGP) method is applied to the site near the riverside in which geotechnical condition results in flood and large deformation. Following the concept of preventing infiltration from huge permeability stratum and decreasing deformation with strengthened stiffness simultaneously, this method is discussed its effectiveness with the instrumentation data. Also the differences of behavior between predicted and detected are investigated with numerical methods. It is found that SGP has a good deal of advantages with regard to balancing between control of permeability and deformation. In addition, it is revealed that SGP can give resonable construction plan for sustaining stiffness for which the sheetpiling method cannot be adopted effectively in waterfront condition.

  • PDF

Stability Analysis of Upper Structures by Soil Grouting (지반 그라우팅에 의한 상부구조물의 안전성 분석)

  • Hwang, Chulsung
    • Journal of the Korean Society of Safety
    • /
    • v.28 no.4
    • /
    • pp.58-65
    • /
    • 2013
  • Transportation and further expansion of social infrastructure was needed along the development of urbanization and population concentration. To use the underground space due to the lack of availability of land, it is inevitable to intersect between present structure and tunnel during construction. Soil grouting is one of the ground improvement methods to reinforce weak soil around the underground structures by injection of grouting liquid. Some of central columns of an upper structure are damaged during injection of grouting liquid by injection pressure. To investigate and improve the stability of the tunnel, three dimensional analysis are performed with full construction stages which includes the construction of present underpass, damaging columns of the underpass, reinforcing the columns by H-pile and shear walls, and excavation and construct tunnel. The arrangement of grouting holes such as curtain and horizontal type affects largely to the stability of upper structure and horizontal arrangement diminish the shear forces which is the cause of damage of central columns. The liquid injection type of reinforcement for tunnel is not recommended while the presence of upper structure with columns. Wall type reinforcing is utilize for permant support of upper structures which is affected by grouting injection pressure. H-pile is utilize for temporary support, but not for permanent since the sharing of shear forces is not much to shear wall during tunnel construction.

The Characteristics of the Composite Ground with Sand Compaction Pile(SCP) using Large Soil Box (대형토조시험을 이용한 모래다짐말뚝이 적용된 복합지반의 침하 및 하중전이특성)

  • Kim, Oo-Seok;Park, Eon-Sang;Kim, Jae-Kwon;Kim, Soo-Sam
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.974-981
    • /
    • 2005
  • Because general laboratory tests for sand compaction pile method including unit-cell test device have fixed outside diameter, as area replacement ratio increase, diameter of sand pile increase. These condition can bring about overestimation of stiffness of composite ground. In addition, existing large soil box which consist of bellows type loading plate can occur serious mistake in checking the amount of drained water because there are additional drainage along the inside wall in device. Overcoming these shortcoming, this paper developed modified large scale soil box consist of piston type load plate. In this study, using this device, series of modified large scale soil box tests were performed, and investigated the settlement and stress transportation characteristics with area replacement ratio in sand compaction pile method.

  • PDF

Seismic Analyses of Soil Pressure against Embedded Mat Foundation and Pile Displacements for a Building in Moderate Seismic Area (중진지역 건축물의 묻힌온통기초에 작용하는 토압과 말 뚝변위에 대한 지진해석)

  • Kim, Yong-Seok
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.21 no.1
    • /
    • pp.69-76
    • /
    • 2017
  • Seismic analyses of a pile under a large rigid basement foundation embedded in the homogeneous soil layer were performed practically by a response displacement method assuming a sinusoidal wave form. However, it is hard to take into account the characteristics of a large mat foundation and a heterogeneous soil layer with the response displacement method. The response displacement method is relevant to the 2D problems for longitudinal structures such as tunnel, underground cave structure, etc., but might not be relevant with isolated foundations for building structures. In this study, seismic pile analysis by a pseudo 3D finite element method was carried out to compare numerical results with results of the response displacement method considering 3D characteristics of a foundation-soil system which is important for the building foundation analyses. Study results show that seismic analyses results of a response displacement method are similar to those of a pseudo 3D numerical method for stiff and dense soil layers, but they are too conservative for a soft soil layer inducing large soil pressures on the foundation wall and large pile displacements due to ignored foundation rigidity and resistance.

Application of numerical simulation for the analysis and interpretation of pile-anchor system failure

  • Saleem, Masood
    • Geomechanics and Engineering
    • /
    • v.9 no.6
    • /
    • pp.689-707
    • /
    • 2015
  • Progressive increase in population causing land scarcity, which is forcing construction industry to build multistory buildings having underground basements. Normally, basements are constructed for parking facility. This research work evaluates important factors which have caused the collapse of pile-anchor system at under construction five star hotel. 21 m deep excavation is carried out, to have five basements, after installation of 600 mm diameter cast in-situ contiguous concrete piles at plot periphery. To retain piles and backfill, soil anchors are installed as pit excavation is proceeded. Before collapse, anchors are designed by federal highway administration procedure and four anchor rows are installed with three strands per anchor in first row and four in remaining. However, after collapse, system is modeled and analyzed in plaxis using mohr-coulomb method. It is investigated that in-appropriate evaluation of soil properties, additional surcharge loads, lesser number of strands per anchor, shorter grouted body length and shorter pile embedment depth caused large deformations to occur which governed the collapse of east side pile wall. To resume work, old anchors are assumed to be standing at one factor of safety and then system is analyzed using finite element approach. Finally, it is concluded to use four strands per anchor in first new row and five strands in remaining three with increase in grouted and un-grouted body lengths.

Influence of the Anchor Slope on Behaviour of Sheet Pile (앵커의 경사(傾斜)가 널말뚝의 거동(擧動)에 미치는 영향(影響))

  • Chun, Byung Sik;Kang, In Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.9 no.1
    • /
    • pp.79-87
    • /
    • 1989
  • The influence of anchor slope on behavior of sheet pile is analysed by results of model test. It can be seen that the larger inclination of anchor causes more causes more increases of the horizontal and vertical deflection of wall, but the bending moment is less influenced by the inclination of anchor. The negative friction against vertical settlement of wall has the yielding point at the excavation level of 0.71-0.80 H. The redistribution of earth pressure on the sheet pile with dredging must be considered by soil-arching. The zero pressure point from the toe of wall is 20% higher than that of the Free Earth Support Method. It is also observed that the angle of failure planes to major principal plane is larger than the angle of $45^{\circ}+{\phi}/2$.

  • PDF

Effects of Soil Conditions on the Behavior of Open -Ended Steel Pipe Pile (지반조건의 변화가 개단강관말뚝의 거동에 미치는 영향)

  • Baek, Gyu-Ho;Lee, Jong-Seop;Lee, Seung-Rae
    • Geotechnical Engineering
    • /
    • v.9 no.3
    • /
    • pp.23-34
    • /
    • 1993
  • Model pile teats, using large calibration chamber in which the stress state and the relative density can be controlled, were performed in order to study on the effect of soil condition on the behavior of open-ended steel pipe pile. The model pipe pile was made up of two pipes to separately measure each component of bearing capacity of open -ended steel pipe pile. According to the tests results, pile plugging and driving resistance of the pile installed in sand were primarily dependent on the horizontal stress and the relative density. Plug bearing capacity, outside skin fricition and total bearing capacity were also mainly dependent on the horizontal stress and relative density. Moreover, the ratio of the horizontal stress acting on the outside wall of open -ended pipe pile after installation to the original horizontal stress was not nearly affected by original value of horizontal stress. It is bigger than one in the case of dense deposit, equal to one for medium deposit, and smaller than one for very loose deposit. It seems to be mainly dependent on the relative density for a given soil.

  • PDF