A Study on the Pullout Behavior of Shear Connectors which Fix the Additional Wall to the PHC-W Piles in the PHC-W Type Permanent Building Retaining Wall |
Jin, Hong-min
(Musung Construction Co., Ltd.)
Kim, Sung-su (Musung Construction Co., Ltd.) Choi, jeong-pyo (Musung Construction Co., Ltd.) Choi, Yongkyu (School of Civil, Environmental & Urban Engrg. Kyungsung Univ.) |
1 | Byun, D. K., Sin, H. M., and Moon, J. G. (2002), Reinforced Concrete, Vol.6, Dongmyung, Korea, p.33. |
2 | Choi, J. P. (2014), Study on the Economic Analysis of Retaining PHC-W Method Improved High Strength Pile, Master's Thesis, Busan National University, pp.25-33. |
3 | Hill Engineering Structral Technology Co. (2017), Construction project report of Rainwater Storage Tank at 844-9, Daedond-ro, Daedong-myeon, Gimhae-city, pp.1-249. |