• 제목/요약/키워드: WBS(Work Breakdown Structure) Model

검색결과 28건 처리시간 0.019초

모델기반 시스템공학을 응용한 대형복합기술 시스템 개발 (Application of Model-Based Systems Engineering to Large-Scale Multi-Disciplinary Systems Development)

  • 박중용;박영원
    • 제어로봇시스템학회논문지
    • /
    • 제7권8호
    • /
    • pp.689-696
    • /
    • 2001
  • Large-scale Multi-disciplinary Systems(LMS) such as transportation, aerospace, defense etc. are complex systems in which there are many subsystems, interfaces, functions and demanding performance requirements. Because many contractors participate in the development, it is necessary to apply methods of sharing common objectives and communicating design status effectively among all of the stakeholders. The processes and methods of systems engineering which includes system requirement analysis; functional analysis; architecting; system analysis; interface control; and system specification development provide a success-oriented disciplined approach to the project. This paper shows not only the methodology and the results of model-based systems engineering to Automated Guided Transit(AGT) system as one of LMS systems, but also propose the extension of the model-based tool to help manage a project by linking WBS (Work Breakdown Structure), work organization, and PBS (Product Breakdown Structure). In performing the model-based functional analysis, the focus was on the operation concept of an example rail system at the top-level and the propulsion/braking function, a key function of the modern automated rail system. The model-based behavior analysis approach that applies a discrete-event simulation method facilitates the system functional definition and the test and verification activities. The first application of computer-aided tool, RDD-100, in the railway industry demonstrates the capability to model product design knowledge and decisions concerning key issues such as the rationale for architecting the top-level system. The model-based product design knowledge will be essential in integrating the follow-on life-cycle phase activities. production through operation and support, over the life of the AGT system. Additionally, when a new generation train system is required, the reuse of the model-based database can increase the system design productivity and effectiveness significantly.

  • PDF

공사일지의 텍스트 마이닝을 통한 우천 공기지연 리스크 정량화 (Quantification of Schedule Delay Risk of Rain via Text Mining of a Construction Log)

  • 박종호;조민건;엄세호;박선규
    • 대한토목학회논문집
    • /
    • 제43권1호
    • /
    • pp.109-117
    • /
    • 2023
  • 건설공사에서의 공기지연은 공사금액 증가, 발주처 클레임, 무리한 공기단축에 따른 건설공사의 질 하락 등 건설프로젝트에 악영향을 끼치는 주요 리스크 요인이다. 기존 연구에서는 공기지연 리스크의 중요도 및 우선순위를 파악하고 중요도에 따라 공정을 관리하였으나, 공기지연 리스크의 심도는 데이터 수집의 한계 등으로 정량화 연구가 미흡하다. 따라서 본 연구에서는 BERT (Bidirectional Encoder Representations from Transformers) 언어 모델을 활용하여 비정형데이터로 저장된 공사일지의 작업내용을 분석 가능한 WBS (Work Breakdown Structure) 기반의 정형데이터로 변환하고 리스크 분류 및 도출 체계, 공정계획에 사용가능한 리스크 발생확률, 리스크 확률분포(심도)의 정량화 방안을 제시하였다. 제안된 프로세스를 고속도로공사 8개 공구에 적용하여, 39개 세부 공중 중 8개의 세부 공종에서 75건의 우천 공기지연 리스크를 도출하였다. K-S 검정을 통해 4개 공종에서 유의미한 확률분포를 도출하였으며 위험도를 비교하였다. 향후 본 연구에서 제시된 프로세스는 시공단계에서 발생하는 다양한 공기지연 요인의 도출 및 심도 정량화에 적용될 수 있을 것으로 기대된다.

액티비티 기반의 EVM - PMIS 통합모델 구축 (The Establishment of an Activity-Based EVM - PMIS Integration Model)

  • 나광태;강병희
    • 한국건축시공학회지
    • /
    • 제10권1호
    • /
    • pp.199-212
    • /
    • 2010
  • 국내 건설산업에 있어서 기술과 정보의 기반구조를 확립하기 위하여 몇몇 건설정보관련 법규가 제도화되었다. 그러나 국내 건설정보 분류체계, 공정 공사비 통합관리(EVM), 프로젝트관리 정보시스템(PMIS)은 주요한 문제점을 내포하고 있다. 특히 현행 PMIS의 기능은 시공자 위주의 시스템으로 되어 있고, EVM이 적용되지 않아 발주자를 위한 보고, 분석, 예측기능이 매우 취약하다. 더욱이 EVM과 PMIS가 서로 분리된 체계로 운영되고 있어 발주자가 실시간으로 공정 및 공사비 정보를 확인할 수 없다. 본 연구의 목적은 PMIS가 EVM기능을 제공하고 사업참여자들이 제반정보를 공유할 수 있도록 WBS 구축방안과 EVM - PMIS 통합모델을 제안하여, E-비즈니스 업무환경하에서 PMIS를 효율적으로 운용할 수 있는 틀(framework)을 제공하는 것이다. EVM - PMIS 통합의 핵심은 EVM과 PMIS가 액티비티 기반의 동일한 운영체계를 갖는 것이다. 통합의 원리는 액티비티의 정보항목(field)을 PMIS의 공정 및 공사비관리 기능을 위한 하위모듈을 구성하는 관계형 데이터베이스 테이블(table)의 항목과 연계시키는 것이다. 따라서 액티비티의 계획공사비(PA), 달성공사비(EV), 실투입비(AC), 공정편차(SV), 공정수행지수(SPI), 공사비편차(CV), 공사비지출지수(CPI)는 PMIS의 공정 및 공사비 하위모듈을 위한 데이터베이스 테이블의 항목으로 연계된다.

CRMS를 활용한 건설공사의 리스크관리 절차모형 개발 (Development of a Risk Management Procedure Model for the Construction Project Using Construction Risk Management System)

  • 김창학;강인석;박홍태
    • 대한토목학회논문집
    • /
    • 제30권4D호
    • /
    • pp.423-432
    • /
    • 2010
  • 본 연구에서는 공사기획단계와 시공단계에서 공사의 성공적 이행을 보장하기 위해 기존의 리스크관리 프로세스를 살펴보고 이에 적합한 새로운 리스크분석 모델인 CRMS를 제시한다. CRMS는 시공자가 건설공사의 이행중 리스크를 확인하고, 분석하고, 관리해 가기 위한 리스크관리절차이다. 이것은 시공자가 인지한 리스크를 정량화하고 이에 적절한 리스크관리 방안을 수립하는데 큰 도움을 줄 수 있다. 특히 건설공사의 리스크관리 중 가장 중요하고 어려운 부문이 리스크를 인지하는 것으로 볼 수 있다. 따라서 본 연구에서는 건설공사의 리스크인지를 쉽게 할 수 있는 절차의 개발에 좀 더 집중하였다. 리스크의 확인은 프로젝트의 외적 리스크와 내적 리스크로 구분한다. 글로벌 리스크의 경우 확인을 용이하게 하기 위해 분석에 필요한 목록을 제시하고, 아울러 RBS의 구축방법과 WBS와의 연계방안을 제시하였다. 이러한 연구결과는 리스크관리용 전산시스템을 개발하기 위한 기초자료로 활용되게 될 것이다.

INTEGRATION MODEL OF COST AND SCHEDULE IN STEEL BOX GIRDER BRIDGE PRODUCTION PROCESS

  • Seok Kim;Kyoungmin Kim;Seung-Ho Ha ;Kyong Ju Kim
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1262-1267
    • /
    • 2005
  • It is still difficult to share and utilize the information generated at each phase of a steel box girder production process due to the spatial gap and different level of management information. The physical distance results in the inefficiency of the information transmission, the accidental omission and typos of the relative information, and so on. Various levels of management information make it difficult to embody a new management system. Eventually, these factors incur the loss of cost and schedule and interrupt development of a new management system. This paper analyzes a current process and presents graphical process flow by using IDEF0. Based this analysis, the research for new production process and work breakdown structure (WBS) is conducted. At the end of this paper, the conceptual design of this system is suggested. Through new management system, it is expected that the model proposed in this study will improve the management process in the steel box production, and the improved process will reduce the redundant cost and schedule information, transmission and deposit generated by manual paper.

  • PDF

해저터널 적정 공사기간 예측을 위한 표준공정관리 체계 연구 (A Study on Standard Construction Process Management System for Prediction of Proper Construction Period of Subsea Tunnel)

  • 배근우
    • 한국건설관리학회논문집
    • /
    • 제18권4호
    • /
    • pp.36-47
    • /
    • 2017
  • 대표적인 국내 해저터널 시공사례로 침매공법을 적용한 가덕 해저터널이 완공되어 운영 중이고, NATM 공법을 적용한 보령~태안간 해저터널이 건설중이다. 호남~제주 간 고속철도 해저터널이 구상중 이고, 일본, 중국과도 해저터널 건설에 대한 타당성이 검토되고 있다. 그러나 Shield TBM 공법을 적용한 해저터널에 대한 국내 시공사례가 없어, 현재의 기술력으로는 장대 해저터널 사업성 분석 및 적정 공사기간 예측 등 공사수행을 위한 공정계획정보 제공이 어렵다. 경제성 등 이유로 정부기관 및 발주기관도 Shield TBM 공법 적용에 소극적이고, Shield TBM 공법을 적용한 공정관리분야 기술적 자료도 부족한 실정이다. 따라서, 장대 해저터널 사업성 분석 및 적정 공사기간 예측하기 위한 표준공정관리체계가 필요하다. 본 연구를 통해 WBS, Network Diagram, 단위 공사기간 산출모델 등 해저터널 표준공정관리 체계를 제시하므로써, 장래 건설되어질 해저터널 사업에 기술적, 경제적으로 기여하고자 한다.

FPSO Topsides Pipe Rack 견적 중량 추산 방법 연구 (A Study on Weight Estimation and Calculation of the Pipe Rack Structures for FPSO EPC Projects)

  • 이수호;안현식;김한성;허윤;배재류;김기수;함승호;이성민;노명일
    • 대한조선학회논문집
    • /
    • 제53권5호
    • /
    • pp.362-370
    • /
    • 2016
  • The weight estimation and calculation of FPSO topsides is first performed at the bidding stage of projects. At this time, it is difficult to estimate and calculate accurately the weight because most of items of FPSO are not apparently defined. Especially, in the case of the pipe rack module, its portion of the total weight and the range of weight variation are large due to special features of piping and electric equipment in the module. Thus, it is very important to estimate and calculate accurately its weight in the task of the weight estimation and calculation of FPSO topsides. In this study, the past data for the weight of the pipe rack module were collected and analyzed, the WBS (Work Breakdown Structure) for the pipe rack module was constructed, and primary variables and secondary variables for developing a weight estimation and calculation model were selected. That is, after analyzing the past data, the volume was selected as the primary variable and the regression analysis was performed based on the variable. Then, several secondary variables were selected and incorporated into a weight estimation and calculation model. At this time, the weight per discipline was assumed from ratios of the total weight. Finally, the weight of the pipe rack module was estimated and calculated by using the developed model. As a result, the deviation from the model was better than that (-20 % ~ 60 %) of other studies about the weight estimation and calculation of FPSO topsides. Thus, the validity and applicability of the weight estimation and calculation of the pipe rack could be checked.

건설공정관리를 위한 BIM데이터와 템플릿 활용 방안 (A Study on the Using of BIM Data and Template for Construction Progress Management)

  • 오건수;박소현;송정우
    • 한국산학기술학회논문지
    • /
    • 제17권8호
    • /
    • pp.157-163
    • /
    • 2016
  • 현재 국내 건설사에서 일부 BIM을 적용하고 있지만, BIM도입에 따른 업무변화와 새로운 학습에 대한 막연한 거부감으로 업무에 적극적으로 활용되지 못하고 있다. 또한 설계단계에 작성된 BIM모델을 시공단계에 활용하기 위해서는 시공시 필요한 공정정보가 제공되어져야 하는데, 공정정보의 입력 체계와 활용 방법이 미비한 실정이다. 따라서 건설사의 BIM의 적극적 도입과 생산성 향상을 위해 본 연구는 BIM의 기본적인 정보를 건축 공정상의 흐름에 따라 필요한 정보가 쉽고 간편한 결과로 나타날 수 있도록 건설공정관리 BIM템플릿을 개발하였다. 이를 위해 작업분류체계(WBS)의 단위정보(주요단위, 세부단위, 상세단위)를 매개변수에 적용하여 공정별 기간별 공정진도 탐색기를 구성하고, 3D뷰 일람표를 생성하였다. 템플릿을 사용하기 위해 Dynamo를 활용하여 BIM모델 객체에 공정정보를 입력하는 방법을 고안하였다. 또한 건설공사의 자재별 물량을 쉽고 빠르게 산출 할 수 있도록 하였다. 건설공정관리 BIM템플릿을 검증하기 위해 실제 프로젝트에 적용하여 가시성과 일람표를 평가하였다. 그 결과 건설공정관리 BIM템플릿이 프로젝트 공정정보를 용이하게 관리할 수 있게 하여, 건설사의 BIM의 적극적 도입과 생산성 향상에 기여할 수 있다.