1 |
J. W. Song, K. S. Oh, J. H. Song, K. J. Lim, H. W. Park, "A study on the Development of BIM Template for Construction schedule management", The Annual Conference for AIK, Vol.2, No.35, pp. 547-548, 2015
|
2 |
H. J. Choe. "A Study on the Development of Scheduling Software in Building Construction", Master's Thesis, KyungWoon University, 2002.
|
3 |
D. I. Kim. "A Study on the Application of Scheduling Based on Work Breakdown Structure in Apartment Housing Projects", Master's Thesis, Inha University, 2013.
|
4 |
H. J. Gang, "A Study on the Development of BIM Template to introduce of BIM in Small and Middle Architectural Design Firms using AHP method", Master's Thesis, HanYang University, 2013.
|
5 |
J. H. Lee, "A Study on the Development of BIM Template for the Design of Small Housing" Master's Thesis, DongSeo University, 2014.
|
6 |
J. J. Park, J. H. Park, W. H. Yun, S. H. Paek, J. Hong, "A Study on the BIM based Architectural Construction Simulation System using Combinative Construction Schedule Creation Method", Journal of The Architectural Institute of Korea, vol. 24 no. 7, 2008.
|
7 |
S. H. Park, J. H. Song, K. S. Oh. "A study on the Information for the Schedule Management of the Construction based BIM, Journal of Digital Contents Society, vol. 16, no. 4, 2015. DOI: http://dx.doi.org/10.9728/dcs.2015.16.4.555
|
8 |
H. J. Jeon, "The Object-Oriented Thought Process", A mid-level researcher support project, HanYang University, 2013.
|
9 |
ivanilmatto, Revit-Element ID in schedules using Dynamo,YouTube,2014,https://www.youtube.com/watch?v=U-tVoCYilxo&list=PLC2cCmic-A5u8lw8SLVtq-rPfNob-BUg6&index=1, 2016.
|