• Title/Summary/Keyword: Variable Cost

Search Result 1,157, Processing Time 0.024 seconds

The Effect of the Credit Period on Inventory Policy under Trade Credit with Ordering Cost inclusive of a Freight Cost

  • Shinn, Seong-Whan
    • International Journal of Advanced Culture Technology
    • /
    • v.9 no.3
    • /
    • pp.271-276
    • /
    • 2021
  • In this paper we analyze the effect of the credit period on inventory policy under trade credit with ordering cost including a fixed cost and freight cost, where the freight cost has a quantity discount. For marketing purposes, some supplier offers credit period to his buyer to stimulate the demand for the product he produces. The delay in payments during the credit period has the effect of reducing the buyer's capital opportunity cost. It is also assumed that the buyer pays the freight cost for the order and hence, the ordering cost consists of a fixed ordering cost and a variable freight cost which depends on the order quantity. As a result, the possibilities of trade credit and discounts on freight costs are expected to play an important role in the buyer's inventory policy. Based on the economic order quantity inventory model, we analyze how the buyer can determine the optimal inventory policy and we examine the effect of the length of credit period on the buyer's inventory policy.

A robust multi-objective localized outrigger layout assessment model under variable connecting control node and space deposition

  • Lee, Dongkyu;Lee, Jaehong;Kang, Joowon
    • Steel and Composite Structures
    • /
    • v.33 no.6
    • /
    • pp.767-776
    • /
    • 2019
  • In this article, a simple and robust multi-objective assessment method to control design angles and node positions connected among steel outrigger truss members is proposed to approve both structural safety and economical cost. For given outrigger member layouts, the present method utilizes general-purpose prototypes of outrigger members, having resistance to withstand lateral load effects directly applied to tall buildings, which conform to variable connecting node and design space deposition. Outrigger layouts are set into several initial design conditions of height to width of an arbitrary given design space, i.e., variable design space. And then they are assessed in terms of a proposed multi-objective function optimizing both minimal total displacement and material quantity subjected to design impact factor indicating the importance of objectives. To evaluate the proposed multi-objective function, an analysis model uses a modified Maxwell-Mohr method, and an optimization model is defined by a ground structure assuming arbitrary discrete straight members. It provides a new robust assessment model from a local design point of view, as it may produce specific optimal prototypes of outrigger layouts corresponding to arbitrary height and width ratio of design space. Numerical examples verify the validity and robustness of the present assessment method for controlling prototypes of outrigger truss members considering a multi-objective optimization achieving structural safety and material cost.

Economic Design of Three-Stage $\bar{X}$ Control Chart Based on both Performance and Surrogate Variables (성능변수와 대용변수를 이용한 3단계 $\bar{X}$ 관리도의 경제적 설계)

  • Kwak, Shin-Seok;Lee, Jooho
    • Journal of Korean Society for Quality Management
    • /
    • v.44 no.4
    • /
    • pp.751-770
    • /
    • 2016
  • Purpose: Two-stage ${\bar{X}}$ chart is a useful tool for process control when a surrogate variable may be used together with a performance variable. This paper extends the two-stage ${\bar{X}}$ chart to a three stage version by decomposing the first stage into the preliminary stage and the main stage. Methods: The expected cost function is derived using Markov-chain approach. The optimal designs are found for numerical examples using a genetic algorithm combined with a pattern search algorithm and compared to those of the two-stage ${\bar{X}}$ chart. Sensitivity analysis is performed to see the parameter effects. Results: The proposed design outperforms the optimal design of the two-stage ${\bar{X}}$ chart in terms of the expected cost per unit time unless the correlation between the performance and surrogate variables is modest and the shift in process mean is smallish. Conclusion: Three-stage ${\bar{X}}$ chart may be a useful alternative to the two-stage ${\bar{X}}$ chart especially when the correlation between the performance and surrogate variables is relatively high and the shift in process mean is on the small side.

A Study on the Rationalization of Logistics Based on the Design of Variable Desks and Chairs (가변형 책·걸상 설계를 통한 물류합리화에 관한 연구)

  • Kim, Byeongchan;Lee, Changmin
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.15 no.3
    • /
    • pp.89-100
    • /
    • 2019
  • Uniform and integrated college desks and chairs have low efficiency of loading for transportation and delivery and low efficiency of storage for warehousing due to their simple uniform physical properties, thus increasing logistics costs for companies and decreasing their competitiveness. In an effort to overcome the limitations of previous studies, this study analyzed the stages of logistics for desks and chairs in college lecture rooms via the transportation route including the factory warehouses and local warehouses and via the delivery route from local warehouses by the region to the orderers including college lecture rooms. The study developed a model for the rationalization of corporate logistics by making a variable folding desk and chair capable of distance adjustment according to height to replace the uniform and integrated college desks and chairs in lecture rooms. A model was developed between the old uniform and integrated college desks and chairs and the new variable folding desks and chairs for three scenarios of cost development including product storage costs, transportation costs from the specialized factory warehouses to the local warehouses by the region, and delivery costs from the local warehouses to college lecture rooms as the orderer. For the generalization of the model, it was applied to each of the 90%, 95%, and 99% service levels.

Economic Design of Variable Sample Size ${\bar{X}}$ Control Chart Using a Surrogate Variable (대용변수를 이용한 가변형 부분군 크기 ${\bar{X}}$ 관리도의 경제적 설계)

  • Lee, Tae Hoon;Lee, Min Koo;Kwon, Hyuck Moo;Hong, Sung Hoon;Lee, Jooho
    • Journal of Korean Society for Quality Management
    • /
    • v.45 no.4
    • /
    • pp.943-956
    • /
    • 2017
  • Purpose: This paper proposes a VSS(Variable Sample Size) ${\bar{X}}$ control chart using surrogate variable and shows its effectiveness compared with FSS(Fixed Sample Size) ${\bar{X}}$ control chart using either performance variable or surrogate variable. Methods: The expected cost function of VSS ${\bar{X}}$ control chart is derived. The optimal designs are then found for numerical examples using a GA(genetic algorithm) and compared to those of the FSS ${\bar{X}}$ control charts. Results: Computational results show that VSS ${\bar{X}}$ control chart using surrogate variables is superior to FSS ${\bar{X}}$ control chart using either performance variable or surrogate variable from the economic view points. Conclusion: The proposed VSS ${\bar{X}}$ control chart will be useful in industry fields where a performance variable is not avaliable or too costly.

An Economic Design of Rectifying Inspection Plans Based on a Correlated Variable (대용품질특성치를 이용한 계수선별형 샘플링 검사방식의 경제적 설계)

  • Bai, D.S.;Lee, K.T.;Choi, I.S.
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.23 no.4
    • /
    • pp.793-802
    • /
    • 1997
  • A sampling plan is presented for situations where sampling inspection is based on the quality characteristic of interest and items in rejected lots are screened based on a correlated variable. A cost model is constructed which involves the costs of misclassification errors, sampling and screening inspections. A method of finding optimal values of sample size, acceptance number and cutoff value on the correlated variable is presented, and numerical studies are given.

  • PDF

Optimum Screening Procedures Using Prior Information

  • Kim, Sang-Boo
    • Journal of Korean Society for Quality Management
    • /
    • v.22 no.1
    • /
    • pp.142-151
    • /
    • 1994
  • Optimum screening procedures using prior information are presented. An optimal cutoff value on the screening variable X minimizing the expected total cost is obtained for the normal model; it is assumed that a continuous screening variable X given a dichotomous performance variable T is normally distributed and that costs are incurred by screening inspection and misclassification errors. Methods for finding optimal cutoff values based on the prior distributions for unknown parameters are presented.

  • PDF

International Development Direction of Variable Gauge Vehicles (궤간 가변 차량의 세계적인 개발동향)

  • Ham Young-Sam;Yoon Ji-Na
    • Proceedings of the KSR Conference
    • /
    • 2003.10c
    • /
    • pp.418-423
    • /
    • 2003
  • Many countries in Asia have been researching for linking and activation of Asia transverse railway and we are trying to link Trans-Korean railway and Transcontinental railway. However we are confronted with a difficult question that the railway system of each country is different from each other-gauge, track formation and signal system. These problems will obstruct prior occupation of market because of loss of time and cost for trans vehicles and transshipment. In this paper, we tried to setting up development direction of Korean variable gauge vehicles by examine international development direction of variable gauge vehicles.

  • PDF

K-1 Tank Life Cycle Cost Estimate Using PRICE Model (PRICE 모델을 이용한 K1전차 수명주기 비용추정)

  • 강창호;강성진
    • Journal of the military operations research society of Korea
    • /
    • v.25 no.2
    • /
    • pp.44-61
    • /
    • 1999
  • Cost estimation has posed a significant challenge to estimators, planners, and managers in both government and military. Considerable historical evidence shows that accurate cost estimation has been difficult to achieve across a wide range of projects, including weapon systems. This paper introduces new cost estimating concept, CAIV(Cost As an Independent Variable) and a cost estimating case study using PRICE model, computer aided parametric estimating models(CAPE) for K1 tank cost estimate. CAIV concept is to set realistic but aggressive cost objectives easily in each acquisition program and to achieve cost, schedule, and performance objectives considering various managing risks with a project manager and industry teams. The Price model is one of computer aided cost estimating models and widely used in U.S. defense system analysis as a tool for CAIV. We analyze theories, inputs, outputs of the PRICE model and present a case study for K1 tank to estimate costs in requirement and concept phase, program and budgeting phase, and life cycle phase. Finally we obtain results that the Price model can be used in various phases of PPBEES depending upon available data and time.

  • PDF

The Cost Structure of the Lines of Urban Railway (도시철도 노선의 비용구조 분석)

  • Kim, Soo Hyun;Jung, Hun Young
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.5
    • /
    • pp.1559-1569
    • /
    • 2014
  • The purpose of this study is to estimate the degree of cost inefficiency for the urban railway lines of a metropolitan city operated by public institutions in Korea and identify the causes of this inefficiency. To this end, we assume that the urban railway lines produce the output of train-km by putting three production factors of labor, electric power and maintenance and set the variable cost function model with the translog function to make a stochastic cost frontier analysis. Based on estimated result, we conclude that the cost savings for 6 years of all lines are about 6,672 hundred million won and top five lines with high inefficiency are Busan Line1, Daegu Line1, Daejeon Line1, Gwangju Line1, and Daegu Line2. The causes of inefficiency are attributable to labor and maintenance factors. The results of this study can be useful in case of finding the priorities of measures and specific plans for reducing labor and maintenance costs in the urban railway operation.