Journal of the Korean Society of Propulsion Engineers
/
v.13
no.1
/
pp.43-50
/
2009
The characteristics at the intermediate operation point of the turbopump-gas generator(TP-GG) coupled test were investigated by analytical method. The pump outlet pressure, gas generator mixture ratio, gas generator pressure, and temperature were examined considering risk minimization of test. The engine system shows different behavior from the TP-GG coupled test at the intermediate operation point since the combustion pressure feeds back to the flow rate in the lines. The advanced valve changes in the combustor line helps less risky mode transition.
Hydrogen is one of the most popular eco-friendly energy sources for reducing global warming. To use hydrogen as a conventional fuel, liquid hydrogen plants should introduce waste hydrogen treatment processes. A major safety issue of liquid hydrogen plants is choosing the most suitable purge gas to use in case of an accident. A purge gas prevents the formation of explosive mixed gases in the vent header. In general, nitrogen is the main purge gas used in chemical plants. Nitrogen has a freezing point of -210℃, which is higher than the boiling point of hydrogen. Helium, with a freezing point lower than hydrogen, is instead recommended as a purge gas of the vent header during hydrogen liquefaction. However, helium is roughly 100 times more expensive than nitrogen. To address this issue, this study uses simulations to investigate safe conditions for introducing nitrogen as the purge gas during hydrogen liquefaction. The temperature change from the safety valve to the vent header is evaluated when the external temperature of the safety valve discharge pipe is at 5℃, 10℃, and 20℃. Additionally, the most optimal length for a discharge pipe according to pipe diameter is investigated.
Special Issue of the Society of Naval Architects of Korea
/
2009.09a
/
pp.71-79
/
2009
The world-wide ship construction market is forecast that the considerable portion of shipbuilding and oceanic plant industry will be transferred consequently in China after 5 or 10 years. This point of view where the Korean ship construction industry seizes the initiative from the world-wide ship construction/oceanic field, we must cultivate technical power of base technology, and focus our interests on the development of core parts. In this study, our proprietary remotely operated valve actuator system with power line technology was developed to enhance the installation and commissioning process by our own technology. This paper describes the new design and functions of the remotely operated valve system for shipbuilding and offshore market especially for FPSO.
Journal of the Korea Academia-Industrial cooperation Society
/
v.4
no.3
/
pp.155-158
/
2003
The effects of Mn, V addition on the behavior of structure and the effects of cooling rate of S20C steel for use of Tn housing and valve for automotive parts have been investigated. Transformation start temperature measured from inflection point of cooling curves has been found out to decrease with increasing cooling rate and to be more sensitive to Mn contents when cooling rate is fast. It was therefore shown that the grain was refined. If there is a big compacting pressure, it is indicated that hardness becomes much greater at surface than inside.
Draft control is key technique in plow control system for automation of implement control system. To make the consistent draft force is an essential factor for preventing the reduction of working efficiency by tractor's slip and also improving the working efficiency. Therefore, the purpose of this study is to develop the draft sensor for draft control of plow and evaluate the usability of the algorithm of draft control system using proportional control valve. The developed draft control system could extract the draft force very well regardless of draft condition, change of setting draft force and response time in the response characteristic test. The maximum draft force at 3-Point linkage was 10,000 N and the deviation of the control system was 125.8 N in steady state condition. The developed control system worked very well with regard to the change of draft force in field and even in soil condition with soil reaction. The results of experiment showed the characteristics of response was sufficient to be used as the implement draft control system for tractor using proportional valve.
Rotary and plow implements are mainly utilized for the tillage operation in Korea, and a implement control system for agricultural tractors was designed and fabricated to improve the working accuracy and efficiency. The control system was composed of three units: 1) sensors fur detection of angle of liftarm, draft force, engine rpm, tillage depth and so on, 2) a controller, and 3) hydraulic circuits, which included solenoid valves and so on, for operation of three point linkage and implements. The control system can control the speed(high and low speed) of implements by adjusting input flow rates of the hydraulic cylinder which was controled by two speed valve, which was composed of a solenoid valve and a orifice. Indoor experiments were conducted to evaluate response characteristics of the designed implement control system under experimental conditions of various engine nm, two kinds of input flow rates of the cylinder and some input frequency. The results of experiments showed the response characteristics sufficient to use as the implement control system fur agricultural tractors.
Park, Seong-Je;Ko, Jun-Seok;Hong, Yong-Ju;Kim, Hyo-Bong;Yeom, Han-Kil;Koh, Deuk-Yong
Progress in Superconductivity and Cryogenics
/
v.12
no.2
/
pp.29-33
/
2010
The experimental results of the 2 stage Gifford-McMahon(GM) type pulse tube refrigerator (PTR) or cryopump are presented in this paper. The objectives of his study are to develop design technology of the integral type 2 stage PTR which rotary valve is directly connected to he hot end of the regenerator and acquire its improved performance. Design of the 2 stage PTR is conducted by FZKPTR(Forschungs Zentrum Karlsruhe Pulse Tube Refrigerator) program for the design of pulse tube refrigerators. The fabricated PTR has U-type configuration and incorporates orifice valve, double-inlet valve and reservoir as phase control mechanism. Rotary valve is used to make pulsating pressure and is directly connected to inlet of $1^{st}$ stage regenerator. From experiments, cooling performance map and pressure waveform at each point were measured for different operating frequencies. Experimental results show the best cooling performance with 2 Hz operation in spite of small pressure amplitude. The lowest temperatures of the 2 stage PTR were 16.9 K at the second stage and 58.0 K at the first stage. The cooling capacities achieved were 14.4 W at 79 K, the first stage and 3.6 W at 29 K, the second stage.
Hemolytic anemia due to tiny prosthetic paravalvular leakage is one of a complication of prosthetic valve replacement. Mild Hemolysls usually occurs after aortic valve replacement with mechanical valve but rarely occurs in mitral valve position especially in case of tissue valve. Cardiac valves fabricated from biologic material are associated with a reduced incidence of hemolytic anemia. Hemolysis was reported in patients with an lonescu-Shiley bovine pericardial xenograft prosthesis in the aortic position but not in the mitral site. A 41-year-old female patient was admitted due to sudden development dark colored urine. About 10 years ago the patient was underwent MVR (Mitral Valve Re lacement) with fTmm lonescu-Shiley valve due to MR (Mitral regurgitation). Echocardiographic examination showed mild degree of mitral regurgitation with valvular thickening. However, there was no definitive evidence of paravalvular leakage. The peripheral blood smear showed nomochromic normocytic anemia, but the hematologic and urinary examination revealed severe hemolytic evidence. Mitral valve replacement with St. Jude Medical valve (27mm) was done and intraoperatively, a tiny paravalvular leakage was found which was regarded as the point of hemolysis. The hemolytic evidence completely disappeared. We are reporting a case of severe hemolytic anemia due to tiny prosthetic paravalvular leakage with a review of the literature.
The Korean Government has proceeded petroleum gas pipeline construction business since 2014 for rural districts. The operating pressure of petroleum gas pipeline are from 25kPa to 75kPa which are different from that of natural gas pipeline. Petroleum gas pipeline pressure is ten or forty times higher than natural gas operating pressure. For this reason, petroleum gas pipeline has higher probability of accident occurrence from massive gas leakage. Korea Gas Safety Corporation begins to development excess flow valves and their performance testing equipment since 2017. The excess flow valves stop the gas flow when a overflow happened in gas pipeline. The excess flow valves are generally not installed in main pipeline, because that may block massive gas supply. So, the valves are installed in starting points of branch pipes. According to the number of house and amount of gas use, a shut-off point of exxcess flow valve is determined called as Trip Flow. The trip point is the most important thing of excess flow valve, so, it is required a equipment testing the performances of excess flow valve as trip point.
Kim, Kyoung-Hun;Yeo, In-Seoung;Yi, Jin-Seok;Lee, Hyung-Jin;Yang, Ji-Ho;Lee, Il-Woo
Journal of Korean Neurosurgical Society
/
v.46
no.4
/
pp.370-377
/
2009
Objective : There is no definite adjustment protocol for patients shunted with programmable valves. Therefore, we attempted to find an appropriate method to adjust the valve, initial valve-opening pressure, adjustment scale, adjustment time interval, and final valve-opening pressure of a programmable valve. Methods : Seventy patients with hydrocephalus of various etiologies were shunted with programmable shunting devices (Micro Valve with $RICKHAM^{(R)}$ Reservoir). The most common initial diseases were subarachnoid hemorrhage (SAH) and head trauma. Sixty-six patients had a communicating type of hydrocephalus, and 4 had an obstructive type of hydrocephalus. Fifty-one patients had normal pressure-type hydrocephalus and 19 patients had high pressure-type hydrocephalus. We set the initial valve pressure to $10-30\;mmH_2O$, which is lower than the preoperative lumbar tapping pressure or the intraoperative ventricular tapping pressure, conducted brain computerized tomographic (CT) scans every 2 to 3 weeks, correlated results with clinical symptoms, and reset valve-opening pressures. Results : Initial valve-opening pressures varied from 30 to $180\;mmH_2O$ (mean, $102{\pm}27.5\;mmH_2O$). In high pressure-type hydrocephalus patients, we have set the initial valve-opening pressure from 100 to $180\;mmH_2O$. We decreased the valve-opening pressure $20-30\;mmH_2O$ at every 2- or 3-week interval, until hydrocephalus-related symptoms improved and the size of the ventricle was normalized. There were 154 adjustments in 81 operations (mean, 1.9 times). In 19 high pressure-type patients, final valve-opening pressures were $30-160\;mmH_2O$, and 16 (84%) patients' symptoms had nearly improved completely. However, in 51 normal pressure-type patients, only 31 (61%) had improved. Surprisingly, in 22 of the 31 normal pressure-type improved patients, final valve-opening pressures were $30\;mmH_2O$ (16 patients) and $40\;mmH_2O$ (6 patients). Furthermore, when final valve-opening pressures were adjusted to $30\;mmH_2O$, 14 patients symptom was improved just at the point. There were 18 (22%) major complications : 7 subdural hygroma, 6 shunt obstructions, and 5 shunt infections. Conclusion : In normal pressure-type hydrocephalus, most patients improved when the final valve-opening pressure was $30\;mmH_2O$. We suggest that all normal pressure-type hydrocephalus patients be shunted with programmable valves, and their initial valve-opening pressures set to $10-30\;mmH_2O$ below their preoperative cerebrospinal fluid (CSF) pressures. If final valve-opening pressures are lowered in 20 or $30\;mmH_2O$ scale at 2- or 3-week intervals, reaching a final pressure of $30\;mmH_2O$, we believe that there is a low risk of overdrainage syndromes.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.