• 제목/요약/키워드: Unit schedule

검색결과 159건 처리시간 0.028초

회분공정의 장치 고장을 고려한 동적생산계획 기법 (Rescheduling algorithms considering unit failure on the batch process management)

  • 고대호;문일
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1996년도 한국자동제어학술회의논문집(국내학술편); 포항공과대학교, 포항; 24-26 Oct. 1996
    • /
    • pp.1028-1031
    • /
    • 1996
  • Dynamic scheduling is very important in constructing CIM and improving productivity of chemical processing systems. Computation at the scheduling level requires mostly a long time to generate an optimal schedule, so it is difficult to immediately respond to actual process events in real-time. To solve these problems, we developed dynamic scheduling algorithms such as DSMM(Dynamic Shift Modification Method), PUOM(Parallel Unit Operation Method) and UVVM(Unit Validity Verification Method). Their main functions are to minimize the effects of unexpected disturbances such as process time variations and unit failure, to predict a makespan of the updated dynamic schedule and to modify schedule desirably in real-time responding to process time variations. As a result, the algorithms generate a new pertinent schedule in real-time which is close to the original schedule but provides an efficient way of responding to the variation of process environment. Examples in a shampoo production batch process illustrate the efficiency of the algorithms.

  • PDF

Evaluating Schedule Uncertainty in Unit-Based Repetitive Building Projects

  • Okmen, Onder
    • Journal of Construction Engineering and Project Management
    • /
    • 제3권2호
    • /
    • pp.21-34
    • /
    • 2013
  • Various risk factors affect construction projects. Due to the uncertainties created by risk factors, actual activity durations frequently deviate from the estimated durations in either favorable or adverse direction. For this reason, evaluation of schedule uncertainty is required to make decisions accurately when managing construction projects. In this regard, this paper presents a new computer simulation model - the Repetitive Schedule Risk Analysis Model (RSRAM) - to evaluate unit-based repetitive building project schedules under uncertainty when activity durations and risk factors are correlated. The proposed model utilizes Monte Carlo Simulation and a Critical Path Method based repetitive scheduling procedure. This new procedure concurrently provides the utilization of resources without interruption and the maintenance of network logic through successive units. Furthermore, it enables assigning variable production rates to the activities from one unit to another and any kind of relationship type with or without lag time. Details of the model are described and an example application is presented. The findings show that the model produces realistic results regarding the extent of uncertainty inherent in the schedule.

수술수가의 적정성에 관한 연구 - 상대가격체계와 항목분류를 중심으로 - (A Study on the Propriety of the Medical Insurance Fee Schedule of Surgical Operations - In Regard to the Relative Price System and the Classification of the Price Unit of Insurance Fee Schedule -)

  • 오진주
    • 한국보건간호학회지
    • /
    • 제2권2호
    • /
    • pp.21-44
    • /
    • 1988
  • In Korea, fee-for service reimbursement has been adopted from the begining of medical insurance system in 1977, and the importance of the relative value unit is currently being investigated. The purpose of this study was to find out the level of propriety of the difference in the fees for different surgical services, and the appropriateness of the classification of the insurance fee schedule. For the purpose of this study, specific subjects and the procedural methodology is shown as follows: 1. The propriety of the Relative Price System(RPS). 1) Choice of sample operations. In this study, sample operations were selected and classified by specialists in general surgery, and the number of items they classified were 32. For the same group of operations the Insurance Fee Schedule(IFS) classified the operations into 24 separate items. In order to investigate the propriety of the RPS, one of the purpose of this study, was to examine the 24 items classified by the IFS. 2) Evaluation of the complexity of surgery. The data used in this study was collected The data used in this study was collected from 94 specialists in general surgery by mail survey from November I to 15, 1986. Several independent variables (age, location, number of bed, university hospital, whether the medical institution adopt residents or not) were also investigated for analysis of the characteristics of surgical complexity. 3) Complexity and time calculations. Time data was collected from the records of the Seoul National University' Hospital, and the cost per operation was calculated through cost finding methods. 4) Analysis of the propriety of the Relative Price System of the Insurance Fee Schedule. The Relative Price System of the sample operation was regressed on the cost, time, comlexity relative ,value system (RVS) separately. The coefficient of determination indicates the degree of variation in the RPS of the Insurance Fee Schedule explained by the cost, time, complexity RVS separately. 2. The appropriateness of the classification of the Insurance Fee Schedule. 1) Choice of sample operations. The items which differed between the classification of the specialist and the classification of medical, Insurance Fee Schedule were chosen. 2) Comparisons of cost, time and complexity between the items were done to evaluate which classification was more appropriate. The findings of the study can be summarized as follows: 1. The coefficient of determination of the regression of the RPS on-cost RVS was 0.58, on time RVS was 0.65, and on complexity RVS was 0.72. This means that the RPS of Insurance Fee Schedule is improper with respect to the cost, time, complexity separately. Thus this indicates that RPS must be re-shaped according to the standard element. In this study, the correlation coefficients of cost, time, complexity Relative Value System were very high, and this suggests that RPS could be reshaped I according to anyone standard element. Considering of measurement, time was thought to be the most I appropriate. 2. The classifications of specialist and of the Insurance Fee Schedule were compared with respect to cost, time, and complexity separately. For complexity, ANOVA was done and the others were compared to the different values of different classifications. The result was that the classification of specialist was more reasonable and that the classification of Insurance Fee Schedule grouped inappropriately several into one price unit.

  • PDF

복합화력발전기의 신뢰도 기반 유지보수를 위한 확률론적 FMECA 평가 (Stochastic FMECA Assessment for Combustion-Turbine Generating Unit in Order to RCM Schedule)

  • 주재명;이승혁;김진오
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.351-353
    • /
    • 2006
  • Preventive maintenance can avail the generating unit to reduce cost and gain more profit in a competitive supply-side power market. so, it is necessary to perform reliability analysis on the systems in which reliability is essential. In this paper, FMECA assessment adopted using real historical failure data in Korean power plants for apply RCM analytical method. The stochastic FMECA is an engineering analysis and a core activity performed by reliability engineers to review the effects of probable failure modes of generating unit and assemblies of the power system on system performance. Optimal RCM schedule which is considered the severity level of each generating unit and failure probability from failure prediction of generating unit can be planned using proposed FMECA with IOE index.

  • PDF

Methodology for Developing Standard Schedule Activities for Nuclear Power Plant Construction through Probabilistic Coherence Analysis

  • kim, Woojoong
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.8-13
    • /
    • 2017
  • Nuclear power plant (NPP) constructions are large scale projects that are executed for several years, and schedule control utilizing various schedules is a critically important factor. Recently Korea independently developed the Advanced Power Reactor (APR) 1400 and is building nuclear facilities applying this new reactor type. The construction of Shin-Kori NPP (SKN) Unit 3, which adopted the APR1400, was completed and commercial operation has begun, while, SKN 4, Shin-Hanul NPP (SHN) Units 1&2, and SKN 5&6 are currently under construction. Prior to the development of the APR1400, Korea built 24 reactors and accumulated the schedule data of various reactor types which provided the foundation for schedule reduction to be possible. However, as there is no schedule development and review system established based on the standard schedule data (standard activities, durations, etc.) by reactor type, the process for developing the schedule for new builds is low in efficiency consuming much time and manpower. Also all construction data has been accumulated based on schedule activities. But because the connectivity of activities between projects is low, it is difficult to utilize such accumulated data (causes for schedule delay, causes for design changes, etc.) in new build projects. Due to such reasons, issues continue to arise in the process of developing standard schedule activities and a standard schedule for nuclear power plant construction. In order to develop a standard schedule for NPP construction, i) the development of an NPP standard schedule activity list, ii) development of the connection logic of NPP standard schedule activities, iii) development of NPP standard schedule activity resources and duration, and iv) integration of schedule data need to be performed. In this paper, an analysis was made on the coherence of schedule activity descriptions of existing NPPs by applying the probabilistic methodology on activities with low connectivity due to the utilization of the numbering system of four APR1400 reactors (SHN 1&2 and SKN 3&4).This study also describes the method for developing a standard schedule activity list and connectivity measures by extracting same and/or similar schedule activities.

  • PDF

기존시가지의 공동구 건설을 위한 표준공기 산정에 대한 연구 (A study on the normal project duration development for the construction of multi-utility tunnel in the existing city)

  • 이성원;이필윤;변요셉;조중연;이민재
    • 한국산학기술학회논문지
    • /
    • 제19권12호
    • /
    • pp.677-685
    • /
    • 2018
  • 건설공사에서 공정관리는 기본적으로 가장 중요한 단계이며, 효율적인 공정관리를 위해서는 합리적 공정표 작성이 우선시 되어야 한다. 설계단계에서는 기상조건과 현장 특성을 고려한 다양한 조건과 공법의 비교 검토를 통해 최적의 공사 기간을 산정할 수 있으나, 기획단계에서 기본적인 자료(D/B) 분석만으로는 효율적 공법 선정과 적정한 공사 기간 산정이 어렵다. 따라서, 기획단계에서 기존시가지의 공동구 건설시 표준공기 분석을 위하여, 본 논문에서는 공동구 형식을 개착식 및 터널식으로 구분하고, 각 형식의 특성과 기존시가지의 조건을 고려한 공법을 선정 하도록 하였다. 합리적인 공기 계산을 위하여 외부 공사에 영향을 주는 기상조건을 고려하여 년 간 가동율을 산정 하였으며, 개착식은 RC 공법/터널식은 Shield TBM 공법에 대한 단위공정을 분석하였다. 각 단위공정을 종합하여 연장 1,200m, 환기구 200m 간격으로 가정한 공사의 표준공기를 산정한바, 개착식은 893일, 터널식은 616일이 소요되는 것으로 분석 되었다. 본 연구의 결과는 기획단계에서 보다 쉽게 공동구 형식 선정과 표준공기 산정에 도움이 될 것이며, 추후 설계단계에 연계하면 공정 및 공사비 산정이 용이할 것으로 판단된다.

일 대학병원 간호직원 근무 스케쥴링 전산화 개발 사례 (A Development of Decision Support System for Nurse Scheduling)

  • 최용선;이은숙;박정호
    • 대한간호학회지
    • /
    • 제25권1호
    • /
    • pp.80-87
    • /
    • 1995
  • The critical problem of nurse scheduling in the hospital is determining the day-to -day shift assignments for each nurse for the specified period in a way that satisfies the given requirements of the hospital. As nurse scheduling involves many factors and requirements, manual scheduling requires much time and effort to produce an adequate schedule. A PC - based decision support system, developed in Turbo - C/sup ++/, for nurse scheduling was introduced. The system is composed of 4 sub-systems : 1) Entering basic information for each nursing unit : 2) Generation of an appropriate initial schedule and revised schedule for a given period, maximally satisfying each nurse's duty requests : 3) Provision of variety of statistical information, and 4) Help messages for each modular function. Icons and a mouse are used for easier graphic user interface and reducing the need for typing efforts. This system can help nurses develop quick and easy schedule generation and allow more time for the patient care.

  • PDF

건설공사의 진도율 산정 방법에 관한 연구 (A study on progress measurement method of a construction project)

  • 박세정;김수용
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.450-453
    • /
    • 2003
  • 건선 사업에 일어서 초기 계획과 기성의 주기적이고 반복적인 비교 검토는 매우 중요하다. 이를 위해서는 정확한 현장 실적자료가 제공되어야하고, 작업량을 객관적으로 계량화하는 기준 및 진행상황을 정확히 반영한 진도율 산정이 필요하다. 이러한 진도율 산정을 위해서는 전체 사업이 명확한 작업범위를 갖는 단위작업으로 분할되어, 각 단위 작업에 필요한 정보가 할당되어야 한다. 국내 건설 사업에서와 같이 내역중심의 사업관리가 이루어지고 있는 상황하에서는 각 단위작업의 물량, 공사비 둥을 포함한 비용 정보 뿐만 아니라 일정 정보를 반영한 진도율 산정 방법이 필수적이며, 본 연구에서는 두 가지 정보에 의한 가중 진도율 산정방법을 제시하고자 한다.

  • PDF

확률론적 FMECA를 이용한 발전설비의 신뢰도 기반 유지보수계획 수립 (Reliability-Centered Maintenance of Generating Unit Using Stochastic FMECA)

  • 주재명;김동민;변용태;김형철;김진오
    • 조명전기설비학회논문지
    • /
    • 제22권1호
    • /
    • pp.58-65
    • /
    • 2008
  • 본 논문은 신뢰도 기반 유지보수(RCM : Reliability-Centered Maintenance) 계획에 의한 발전설비의 유지보수주기를 평가하고 있다. 유지보수주기는 발전설비의 안정성 및 비용을 결정하기 위한 기준으로 활용된다. 본 논문에서는 설비 수명평가를 통해 확률분포를 이용한 확률론적 FMECA(Failure Mode, Effects and Criticality Analysis)에 대해 논하고, 국내 발전 설비 중 비교적 평균수명이 짧은 복합화력 발전소를 선정하여 유지보수 주기를 평가하였다. 발전소 유지보수 평가는 향후 구조 개편된 전력시장에서 유지보수계획 수립 방법의 유용한 지표로 활용 가능할 것이다.