• 제목/요약/키워드: Underground Power Cable System

검색결과 158건 처리시간 0.029초

초고압 케이블의 송전 감시 시스템 소개 및 기술동향 (Application of Supervisory System in Extra High Voltage Cable)

  • 권병일;남정세;강덕환
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1997년도 하계학술대회 논문집 E
    • /
    • pp.1791-1793
    • /
    • 1997
  • Since Korea was initiated a industrialization, many transmission lines have been installed to meet the increasing demand for the electric power. In large city, underground transmission lines were widely installed because of the environmental issue. But there have been appeared many failures on the lines, such as the external scar of cable, a fire in the culvert, overheating of cable, and so on. There have been many studies to monitor them and improve the reliability of the power supply. As a method monitoring the lines, a DTS(Distributed Temperature Sensor) system is developed and applied. This system monitors the lines and predicts the failures, using a optical fiber sensor. This paper describes this DTS system and its application for the underground transmission lines.

  • PDF

지중송전계통에서 OF케이블의 교량 첨가시 모델 수립 및 해석 (Analysis and Model Establishment of OF Cable Underneath a Bridge on Underground Power Cable Systems)

  • 이현석;이종범
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 제39회 하계학술대회
    • /
    • pp.2245-2246
    • /
    • 2008
  • This paper analyses crossbonded cable system underneath a bridge. The simulation is performed under various system configuration such as cable length, iron frame size, lightning surge. The simulation models are established by EMTP/ATPDRraw. In this paper, the crossboneded cable system underneath a bridge is also analyzed for insulation coordination of iron frame and cables.

  • PDF

초전도케이블 시장진입 가격 산정 방법론 고찰 (Methodology for Estimating the HTS Cable Market Price)

  • 김종율;이승렬;윤재영
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제53권10호
    • /
    • pp.536-541
    • /
    • 2004
  • As power demand increases gradually, the call for underground transmission system increases. But it is very difficult and high in cost to construct new ducts and/or tunnels for power cables in metropolitan areas. HTS (High Temperature Superconducting) cable has the several useful characteristics such as increased power density, stronger magnetic fields and/or reduced losses. Therefore HTS cable can allow more power to be moved in existing ducts, which means very large economical and environmental benefits. In these days, companies world-wide have conducted researches on HTS cable. A development project for a 22.9kV class HTS cable is proceeding at a research center and university in Korea. In this paper, we investigate the expected price of HTS cable to have a merit in viewpoint of economic aspect. First, life-cycle cost of conventional cable is calculated and based on this, the expected price of HTS cable is evaluated, which HTS cable is competitive against conventional cable.

Life-cycle 비용 산정을 통한 초전도케이블 경제성 검토 (A Economic feasibility of HTS cable by estimating the Life-Cycle cost)

  • 김종율;이승렬;윤재영
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 하계학술대회 논문집 A
    • /
    • pp.424-426
    • /
    • 2004
  • As power demand increases gradually, the call for underground transmission system increases. But it is very difficult and high in cost to construct new ducts and/or tunnels for power cables in metropolitan areas. HTS (High Temperature Superconducting) cable has the several useful characteristics such as increased power density, stronger fields and/or reduced losses. Therefore HTS cable can allow more power to be moved in existing ducts, which means very large economical and environmental benefits. In these days, companies world-wide have conducted researches on HTS cable. A development project for a 22.9kV class HTS cable is proceeding at a research center and university in Korea. In this paper, we investigate the expected price of HTS cable to have a merit in viewpoint of economic aspect. First, life-cycle cost of conventional cable is calculated and based on this, the expected price of HTS cable is evaluated, which HTS cable is competitive against conventional cable.

  • PDF

지중송전계통에서 배전선 불평형전류 유입에 따른 영향 검토 (Analysis of induced voltage of CCPU with unbalanced current from Distribution Line on Underground Transmission Cable System)

  • 강지원;장태인;홍동석;정채균;윤동수;윤종건;김형호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.459-461
    • /
    • 2005
  • This paper analyses the induced voltage characteristic of CCPU with unbalanced current from distribution line on underground transmission power cable systems. In switching surge strokes, in order to obtain the data of induced voltage/current on CCPU, the actual proof test carried out. This paper is expected to contribute the establishment of proper protection methods of CCPU against the unbalanced current from distribution line on underground transmission power cable systems.

  • PDF

Insulation Design and Reliability Evaluation of ±80kV HVDC XLPE Cables

  • Jung, Chae-Kyun;Park, Hung-Sok;Kang, Ji-Won
    • Journal of Electrical Engineering and Technology
    • /
    • 제9권3호
    • /
    • pp.1002-1008
    • /
    • 2014
  • This paper describes insulation design and its reliability evaluation of ${\pm}80kV$ HVDC XLPE cable. Recently, the construction of HVDC transmission system, which is combined overhead line with underground cable, has been completed. This system is installed with existing 154 kV AC transmission line on the same tower. In this paper, the lightning transient analysis is firstly reviewed for selection of basic impulse insulation level and nominal insulation thickness. Then the electrical performance tests including load cycle test and superimposed impulse test based on CIGRE TB 496 are performed to evaluate the reliability of newly designed HVDC cable. There is no breakdown for ${\pm}80kV$ HVDC XLPE cable during electrical performance test. Finally, this system is installed in Jeju island based on successful electrical performance test (Type test). After installation tests are also successfully completed.

전력 케이블 실시간 허용전류산정 시스템에 관한 연구 (I) - 실시간 도체 온도 추정 시스템 (A Dynamic Rating System for Power Cables (I) - Real Time CTM(Conductor Temperature Monitoring))

  • 남석현;이수길;홍진영;김정년;정성환
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제52권7호
    • /
    • pp.414-420
    • /
    • 2003
  • The domestic needs for larger capability of power sources are increasing to cope with the expanding power load which results from the industrial developments & the progressed life style. In summer, the peak load is mainly due to the non-industrial reasons such as air-conditioners and other cooling equipments. To cover the concentrated peak load in stable, the power transmission lines should be more constructed and efficiently operated. The ampacity design of the underground cable system is generally following international standards such as IEC287, IEC60853 and JCS168 which regards the shape of 100% daily full power loads. It is not so efficient to neglect the real shapes of load curves generally below 60~70% of full load. The dynamic (real time) rating system tends to be used with the measured thermal parameters which make it possible to calculate the maximum ampacity within required periods. In this paper, the CTM(Conductor Temperature Monitoring) which is the base of dynamic rating systems for tunnel environment is proposed by a design of lumped thermal network ($\pi$-type thermal model) and distribution temperature sensor attached configuration, including the estimation results of its performances by load cycle test on 345kV single phase XLPE cable.

전력구내 지중케이블 강제냉각에서의 적정냉각구간에 관한 연구 (A Study on the Optimum Cooling Span of the Underground Power Transmission Cable Equipped by a Forced Cooling System)

  • 이재헌;정상호;김재근;박만홍
    • 설비공학논문집
    • /
    • 제2권1호
    • /
    • pp.49-62
    • /
    • 1990
  • The forced cooling system has been widely applied to passing more electric current in the underground power transmission cable technology. In this paper, the optimum cooling span of the in-trough-indirect water cooling method within an electric tunnel was investigated. A parametric study was performed for the cable currents, the coolant flow rates, and the coolant inlet temperatures. As a result, the temperature of the inlet air has been found as the most important parameter in determination of the optimum cooling span.

  • PDF

지중 배전용케이블 고장통계 분석 및 고장률 활용 진단대상 우선순위 선정방법 (MV Cable Failure Statistics Analysis and Failure Rate Utilization Method of Prioritization of Diagnosis Targets)

  • 조종은;이온유;김상봉;김강식
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제7권2호
    • /
    • pp.263-268
    • /
    • 2021
  • This paper statistically analyzes the time required for each failure cause and describes a diagnostic method for 159 reports of failure analysis of MV cables that occurred in the distribution system of KEPCO over the past 18 years. In addition, the manufacturer's failure rate compared to 100C-km was calculated using 381 cases of MV cable deterioration failure between 2008 and 2020. It is hoped that this paper will help those in charge of maintaining underground facilities at the business office to use the failure rate to prioritize facility diagnosis.

웨이블렛을 이용한 지중송전계통 고장검출 및 노이즈 제거 알고리즘 개발 (Development of Fault Detection and Noise Cancellation Algorithm Using Wavelet Transform on Underground Power Cable Systems)

  • 정채균;이종범
    • 전기학회논문지
    • /
    • 제56권7호
    • /
    • pp.1191-1198
    • /
    • 2007
  • In this paper, the fault detection and noise cancellation algorithm based on wavelet transform was developed to locate the fault more accurately. Specially, noise cancellation algorithm was based on the correlation of wavelet coefficients at multi-scales. Fault detection, classification and location algorithm were tested by EMTP simulation on real power cable system. From these results, the faults can be detected and located even in very difficult situations, such as at different inception angle and fault resistance.