• 제목/요약/키워드: Train Delay

검색결과 118건 처리시간 0.029초

고속철도 열차지연 유형의 구분지표 및 기준 (Types of Train Delay of High-Speed Rail : Indicators and Criteria for Classification)

  • 김한수;강중혁;배영규
    • 한국경영과학회지
    • /
    • 제38권3호
    • /
    • pp.37-50
    • /
    • 2013
  • The purpose of this study is to determine the indicators and the criteria to classify types of train delays of high-speed rail in South Korea. Types of train delays have divided into the chronic delays and the knock-on delays. The Indicators based on relevance, reliability, and comparability were selected with arrival delay rate of over five minutes, median of arrival delays of preceding train and following train, knock-on delay rate of over five minutes, correlation of delay between preceding train and following train on intermediate and last stations, average train headway, average number of passengers per train, and average seat usages. Types of train delays were separated using the Ward's hierarchical cluster analysis. The criteria for classification of train delay were presented by the Fisher's linear discriminant. The analysis on the situational characteristics of train delays is as follows. If the train headway in last station is short, the probability of chronic delay is high. If the planned running times of train is short, the seriousness of chronic delay is high. The important causes of train delays are short headway of train, shortly planned running times, delays of preceding train, and the excessive number of passengers per train.

수동운전방식에서의 PSD 출입문 신호반응 시간 개선 방안 연구 (PSD Door Response Time Improving Method in Train Manual Operation Mode)

  • 이무호;김찬겸;이석종;이수영
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.559-571
    • /
    • 2008
  • Platform Screen Door(PSD) has been installed and operated at seoul subway line $1\sim4$ in the manual train operation mode(ATS/ATC) by SeoulMetro since 2005. SeoulMetro uses the wireless (RF) communication system and the train door detection system for the link between the train and PSD doors opening/closing motion in the manual train operation mode. For the convenience and safety of passengers, the train doors and the PSD doors opening/closing shall be synchronized as much as possible. In ATO(Automatic Train Operation) mode which provides the interface between train control system and PSD system, ATO signaling system makes the train doors and PSD doors open/close command signals systematically, so PSD doors can be opened/closed almost simultaneously with the train doors. But, in the manual train control(ATS/ATC) mode, PSD system needs to detect the train doors open/close operation and make PSD open/close command signals to actuate PSD doors. These PSD open/close commanding process cause time delay of PSD doors opening/closing motion in response to the train doors opening/closing motion. Sometimes the response delay time can be over 1 second, which is not proper to operate PSD, and need to be reduced This paper presents the reduction method of the PSD response delay time to improve the convenience and safety of passengers.

  • PDF

Adaptive compensation method for real-time hybrid simulation of train-bridge coupling system

  • Zhou, Hui M.;Zhang, Bo;Shao, Xiao Y.;Tian, Ying P.;Guo, Wei;Gu, Quan;Wang, Tao
    • Structural Engineering and Mechanics
    • /
    • 제83권1호
    • /
    • pp.93-108
    • /
    • 2022
  • Real-time hybrid simulation (RTHS) was applied to investigate the train-bridge interaction of a high-speed railway system, where the railway bridge was selected as the numerical substructure, and the train was physically tested. The interaction between the two substructures was reproduced by a servo-hydraulic shaking table. To accurately reproduce the high-frequency interaction responses ranging from 10-25Hz using the hydraulic shaking table with an inherent delay of 6-50ms, an adaptive time series (ATS) compensation algorithm combined with the linear quadratic Gaussian (LQG) was proposed and implemented in the RTHS. Testing cases considering different train speeds, track irregularities, bridge girder cross-sections, and track settlements featuring a wide range of frequency contents were conducted. The performance of the proposed ATS+LQG delay compensation method was compared to the ATS method and RTHS without any compensation in terms of residual time delays and root mean square errors between commands and responses. The effectiveness of the ATS+LQG method to compensate time delay in RTHS with high-frequency responses was demonstrated and the proposed ATS+LQG method outperformed the ATS method in yielding more accurate responses with less residual time delays.

시공간 네트워크를 이용한 열차 경합해소모형 (The Train Conflict Resolution Model Using Time-space Network)

  • 김영훈;임석철
    • 한국철도학회논문집
    • /
    • 제18권6호
    • /
    • pp.619-629
    • /
    • 2015
  • 열차 경합해소 문제는 열차의 경합이 발생되거나 예측될 때 지연 확산을 최소화하기 위해 열차 운행스케줄을 조정하는 것이다. 기존연구에서는 폭발적으로 증가하는 변수로 인해 풀 수 있는 문제의 크기가 제한적이다. 본 논문에서는 열차 운영단계에서 열차 경합을 해소하기 위해 시공간 네트워크를 이용한 열차 경합해소모형을 제안한다. 제안한 모형은 시공간 네트워크에서 경합발생 이후 운행 열차들에 대해 정차 역에서의 정차 허용치만을 부여함으로써 문제의 크기를 조절하였다. 또한, 경로흐름변수를 사용해 대형문제도 풀 수 있도록 하였다. 제안한 모형을 이용하여 열차경합의 지연파급분석과 경합해소 실험결과를 제시하였다.

에너지 절약을 위한 선두열차군의 구원에 의한 지연회복 (A Study on the Recovery of Delay Time According to the Relief of Precedent Trains for Energy Savings)

  • Kim, Yang mo
    • 대한전자공학회논문지
    • /
    • 제25권6호
    • /
    • pp.629-636
    • /
    • 1988
  • The reduction of recovery time for delay, in the train movements, is generally realized through train operations in the shortest running time and it leads to maximum energy consumption. At the region of this shortest running time, the amount of energy consumption is sharply reduced according to the running time. So the effect for the energy savings can be largely obtained by furnishing a little spare time on train operations. In this paper, it has been modelized the delay and it's enlargement phenomena and formualted the relief patterns in order to restore the delay by restraint and relief of precedent traints. Also it has been proved the number of relief trains for minimum energy consumption exists and then represented one example of relief patterns.

  • PDF

시간 측정범위 향상을 위한 펄스 트레인 입력 방식의 field-programmable gate array 기반 시간-디지털 변환기 (Field-Programmable Gate Array-based Time-to-Digital Converter using Pulse-train Input Method for Large Dynamic Range)

  • 김도형;임한상
    • 전자공학회논문지
    • /
    • 제52권6호
    • /
    • pp.137-143
    • /
    • 2015
  • Field-programmable gate array (FPGA) 기반 시간-디지털 변환기 (time-to-digital converter: TDC)는 구조가 단순하고, 빠른 변환속도를 갖는 딜레이 라인 (delay-line) 방식을 주로 사용한다. 하지만 딜레이 라인 방식 TDC의 시간 측정범위를 늘리기 위해서는 딜레이 라인의 길이가 길어지므로 사용되는 소자가 많아지고, 비선형성으로 인한 오차가 증가하는 단점이 있다. 따라서 본 논문은 동일한 길이의 딜레이 라인에 펄스 트레인 (pulse-train)을 입력하여 시간 측정범위를 향상시키고, 리소스를 효율적으로 사용하는 방식을 제안한다. 펄스 트레인 입력 방식의 TDC는 긴 시간을 측정하기 위하여 시작신호의 입력과 동시에 4-천이 (transition) 펄스 트레인이 딜레이 라인에 입력된다. 그리고 동기회로 (synchronizer) 대신 천이 상태 검출부를 설계하여 중지신호 입력 시 사용된 천이를 판별하고, 준안정 상태 (meta-stable state)를 피하면서 딜레이 라인의 길이를 줄이는 구조를 갖는다. 제안한 TDC는 72개의 딜레이 셀 (delay cell)을 사용하였고, 파인부 (fine interpolator)의 성능 측정 결과, 시간 측정범위는 5070 ps, 평균 분해능은 20.53 ps, 최대 비선형성은 1.46 LSB였으며, 시간 측정범위는 계단 (step) 파형을 입력신호로 사용하는 기존 방식 대비 약 343 % 향상되었다.

시뮬레이션을 이용한 도시철도 운행 서비스품질 개선에 관한 연구 (Improvement of Service Quality for Urban Railway Operations Using Simulation)

  • 김동희;이홍섭
    • 한국철도학회논문집
    • /
    • 제20권1호
    • /
    • pp.156-163
    • /
    • 2017
  • 대도시 고밀도 도시철도에서는 상습 열차운행 지연과 혼잡으로 승객의 불편과 불만이 커지고 있다. 도시철도는 열차운행의 비정규성과 수요의 불확정성 등 지역간 철도와는 다른 특성을 가지고 있다. 도시철도 운영회사에서는 실적자료를 기반으로 열차운행품질과 혼잡도와 같은 서비스품질을 집계하여 관리하고 있다. 그러나 수요와 승객행태에 따라 열차운행이 동적으로 변하는 특성을 가지고 있어 실제 느끼는 서비스품질을 표현하기에는 한계가 있다. 본 논문에서는 승객 관점에서의 서비스품질을 계량화하고, 도시철도에서 수요에 따른 정차시분 및 열차운행상태의 동적변화를 예측할 수 있는 시뮬레이션 방법과 지연/혼잡 해소방안에 대한 실제 사례를 기반으로 운행서비스품질의 변화를 예측할 수 있는 방법론을 제시한다.

서울메트로 2호선에서 승객폭주 영향에 대한 연구 (A Study of Overcrowding Effects on Seoul Metro Line 2)

  • 곽윤봉;이종우;김두겸;고영환
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.1960-1965
    • /
    • 2011
  • Train operations run trains to well-scheduled time table and the ideal case would be to have the trains running exactly as scheduled. The train delay resulted from the overcrowding takes place frequently in Seoul metro line 2, and doesn't keep the predefined headway. It requires to analyze the train delay caused from the overcrowding. In this paper we modeled, simulated, and analyzed the delay to disclose the effects in the line 2 operation. The modeling consists of trains entering into the line, running on the line and exiting from the line. The simulation carries out with statistical perturbation and analyzes the disturbance.

  • PDF

지연시간이 고려된 CAN 기반 피드백 제어시스템의 한국형 고속전철 여압시스템 적용 (CAN-based Feedback Control System Applied to Korean high-speed Train Pressurization System considering Network Delay)

  • 곽권천;김홍렬;김주민;김대원
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 D
    • /
    • pp.2445-2447
    • /
    • 2002
  • In this paper, CAN-based feedback control system is proposed for the pressurization system of korean high-speed train. The control performance of the system is evaluated. According to the requirement of the pressurization system A process model considering network delay and an adaptive PID control method based on the process model are proposed here. And it is shown that the proposed adaptive PID control method considering the network delay has on adequate feature compared to some other existing methods consequently it can be considered to be applied the pressurization system of korean high-speed train.

  • PDF

도시철도 운행역에서의 정차시분 추정에 관한 실증연구 (Experimental Study on the Estimation of Station Dwell Time for Metro Railways)

  • 김동희;홍순흠
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.673-678
    • /
    • 2008
  • In crushed service areas of Metro railway lines, there are problems such as the buildup discontent, the irregular operation time and rotation of rolling stocks, caused by frequently occurred train delay. Train delay is affected by operation conditions or infrastructure capacities such as train schedule, line capacity, car rotation plan, shunting movements at origin and destination, and also by transport demand characteristics. Furthermore, a delay produce another delays and spread over the following trains. So it is not easy to build up a protection and recovery plan. In this research, we conduct experimental analysis study based on the real metro data, and as a result, present the relation between the traffic demand and the dwell time. And finally, propose future research themes for improving the operation efficiency of metro railways.

  • PDF