1 |
B.H. Park, S.H. Hong, C.S Kim (2012) An optimization model for railway slot allocation reflecting the operational policy, Journal of the Korean Society for Railway, 15(5), pp. 524-530.
DOI
|
2 |
B.H. Park, S.H. Hong (2013) A column-generation based approach to developing an optimized railway timetable using time-space network, Proceedings of the Korean Society for Railway, Daegu, the Korea, pp. 160-167.
|
3 |
Y.H. Kim, S.C. Rim (2014) Additional freight train schedule generation model, Journal of the Korea Academia-Industrial Cooperation Society, 15(6), pp. 3851-3857.
DOI
|
4 |
Y.H. Kim, S.C. Rim (2014) A study on the addtional train scheduling method, Journal of the Korean Society for Railway, 17(4), pp. 313- 319.
DOI
|
5 |
B.H. Park, K.M. Kim, S.H. Hong, Y.H. Kim (2007) An algorithm for detection and resolution of train conflicts occuring whitin station, Journal of the Korean Society for Railway, 10(2), pp. 179-185.
|
6 |
T.K. Ho, J.P. Norton, C. Goodman (1997) Optimal traffic control at railway junction, Proceeding of Inst. Electr. Eng., Kharagpur, the India, 144(2), pp. 140-148.
|
7 |
J. Pachl (2002) Railway operation and control, Mountlake terrace WA:VTD rail.
|
8 |
J. Jacobs (2004) Reducing delay by means of computer-aided 'on-the-spot'rescheduling in Computers in Railway IX WIT Press, Southampton, the United Kingdom, pp.605-612.
|
9 |
A. D'Ariano., D. Pacciarelli, M. Pranzo (2007) A branch and bound algorithm for scheduling trains in a railway network, European Journal of Operational Research, 183(2), pp.643-657.
DOI
|
10 |
R. Borndorfer, T. Schechte, S.Weider (2010) Railway track allocation by rapid branching, Proceedings of the 10th workshop on Algorithmic Approaches for Transportation Modelling, Optimization, and Systems, Dagstuhl, the Germany, 4, pp. 13-23.
|
11 |
J. Yuan, I.A. Hansen (2007) Optimizing capacity utilization of stations by estimating knock-on train delays, Transportation Research Part B, 41, pp. 202-217.
DOI
|
12 |
B. Szpigel (1973) Optimal train scheduling on a single track railway, Proceedings of IFORS Conference on Operations Research, Amsterdam, the Netherlands, pp. 344-351.
|
13 |
D. Jovasovic, P.T. Harker (1991) Tactical scheduling of rail operations : The SCAN I system, Transportation Science, 25(4664), pp. 46-64.
DOI
|
14 |
A. Higgins, E. Kozan, L. Ferreira (1997) Heuristic techniques for single line train scheduling, Journal of Heuristics, 3(1), pp. 43-62.
DOI
|
15 |
J.H. Kim, S.M. Oh, S.H. Hong (2005) An exploratory development of mathematical programming model for the railway conflict resolution problem on a single line track, Journal of the Korean Society for Railway, 8(4), pp. 314-320.
|
16 |
U. Brannlund, P.O. Lindberg, A. Nou, et al. (1998) Railway timetabling using Lagrangian Relaxation, Transportation Science, 32(4), pp. 358-369.
DOI
|
17 |
A. Caprara. M. Mischetti, P. Toth (2002) Modelling and solving the train timetabling problem, Operation Research, 50(5), pp. 851-861.
DOI
|
18 |
V. Cacchiani, A. Caprara, P. Toth (2010) Scheduling extra freight train on railway networks, Transportation Research Part B, 44(2), pp. 215-231.
DOI
|