• Title/Summary/Keyword: Traffic Stability

Search Result 317, Processing Time 0.027 seconds

Parameter Variation of Car-Following Models Due to Vehicle Tinting (차량선팅으로 인한 차량추종모델의 파라메터 변화분석)

  • Lee, Chung-Won;Kim, Hye-Won
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.8 no.5
    • /
    • pp.48-56
    • /
    • 2009
  • Regulation of Visible Light Transmission Percentage (VLT%) has been argued because it was known that the degree of darkness of tinted vehicle can affect to driving maneuver. Previously, it was proven that low level of VLT affects capacity reduction. But, due to lack of field data they could not analyze the effect of Car-Following model parameters. This study focuses on the effect of a tinted vehicle on following traffic flow. RTK GPS receiving data through field experiment analyzed based on headway distance, acceleration noise, sensitivity, and reaction time. As a result of analysis through GM 1st Model and 3rd Model, influence of following vehicle vary inversely with VLT and risk according as tinting of lead vehicle is third vehicle bigger than second vehicle. Also the results patterns of GM 3rd model include distance-headway are same with GM 1st Model. In the further need to research for influence analysis of traffic flow stability by the level of VLT.

  • PDF

Lateral Load Distribution Estimation of a PSC Girder Bridge from Dynamic Loading Test (동적재하시험을 통한 PSC 거더교의 횡분배 측정)

  • Kim, Sung-Wan;Cheung, Jin-Hwan;Kim, Seong-Do;Park, Jae-Bong;Lee, Myoung-Jin
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.3
    • /
    • pp.60-68
    • /
    • 2017
  • Since the bridge is the main facility of the road that is the core of the civil infrastructure, the bridge is constructed to ensure stability and serviceability during the traffic use. In order to secure the safety of bridges, evaluating the integrity of bridges at present is an important task in the maintenance work of bridges. In general, to evaluate the load carrying capacity of bridges, it is possible to confirm the superimposed behavior and symmetric behavior of bridges by estimating the lateral load distribution factor of the bridges through vehicle loading tests. However, in order to measure the lateral load distribution factor of a commonly used bridge, a static loading test is performed. There is a difficulty in traffic control. Therefore, in this study, the static displacement component of the bridge measured in the dynamic loading test and the ambient vibration test was extracted by using empirical mode decomposition technique. The lateral load distribution was estimated using the extracted static displacement component and compared with the lateral load distribution factor measured in the static loading test.

Performance Evaluation and Economic Analysis for the Road Visibility Measurement System using the CCTV Camera (CCTV 카메라를 이용한 도로시정측정시스템의 성능평가 및 경제성 분석)

  • Kim, Bong-Keun;Lee, Gwang
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.1
    • /
    • pp.385-392
    • /
    • 2013
  • A key element of the fog warning system to prevent large traffic accidents is a visibility measurement device. Recently, the need for it that is similar to the human visual sense and cheap and accurate than expensive fog sensors is increasing. In this paper, we present the performance evaluation and the economic analysis of the Road Visibility Measurement System (RVMS), which is developed for measuring the road visibility through a CCTV camera. For experiments, we have installed a CCTV camera, a fog sensor, and visibility signs at the Yeo-ju Test Road on the Central Inland Expressway. We evaluated the measurements from RVMS and the fog sensor based on observations. The result shows RVMS outperforms the fog sensor with respect to measurement stability and correctness. We also show RVMS has higher economic feasibility and various applications. RVMS can prevent the traffic accidents caused by severe fog and enhance the process of the wide-area visibility information system significantly.

Performance Analysis of Flow Control Method Using Virtual Switchs on ATM (ATM에서 가상 스위치를 이용한 흐름 제어 방식의 성능 분석)

  • 조미령;양성현;이상훈
    • Journal of the Korea Computer Industry Society
    • /
    • v.3 no.1
    • /
    • pp.85-94
    • /
    • 2002
  • EMRCA(Explicit Max_min Rate Control Algorithm) switch, which has been proposed in the ATM(Asychronous Transfer Mode) standard, controls the ABR(Available Bit Rate) service traffic in the ATM networks. The ABR service class of ATM networks uses a feedback control mechanism to adapt to varying link capacities. The VS/VD(Virtual Source/Virtual Destination) technique offers the possibility to segment the otherwise end-to-end ABR control loop into separate loops. The improved feedback delay and the control of ABR traffic inside closed segments provide a better performance and QoS(Quality of Service) for ABR connections with respect to throughput, delay, and jitter. This paper is study of an ABR VS/VD flow control method. Linear control theory offers the means to derive correct choices of parameters and to assess performance issues, like stability of the system, during the design phase. The performance goals are a high link utilization, fair bandwidth distribution and robust operation in various environments, which are verified by discrete event simulations. The major contribution of this work is the use of linear control theory to model and design an ABR flow control method tailored for the special layout of a VS/VD switch, the simulation shows that this techniques better than conventional method.

  • PDF

Gait Analysis and Functional Outcomes Following Pan Tarsal Arthrodesis of Tarsal Joint in a Toy Poodle

  • Song, Jaeyong;Kim, Jun-Hyung;Woo, Heung-Myoung;Kang, Byung-Jae
    • Journal of Veterinary Clinics
    • /
    • v.36 no.2
    • /
    • pp.123-125
    • /
    • 2019
  • A 12-year-old castrated Toy Poodle was referred with a continuous non-weight bearing lameness of right hind limb due to a traffic accident 9 years ago. Physical examination and radiographs revealed partial loss of right calcaneal bone, loss of Achilles tendon and disused muscular atrophy. Arthrodesis was performed to preserve the function of the right hind limb. Pan tarsal arthrodesis plate was applied medially with 2.7 mm cortical screws and 2.0 mm cortical screws. During fixation, cancellous bone chip was transplanted into the arthrodesis site. A bone union was confirmed 9 weeks after surgery. Furthermore, on the gait analysis, the weight-bearing of right hind limb was restored to 70% of the opposite hind limb. Arthrodesis can be used to treat more difficult and serious problems affecting the joints. In particular, arthrodesis is indicated in cases such as comminuted intraarticular fractures and irreparable injury of the calcaneal tendon apparatus in the hock joint. In this case, the pan tarsal arthrodesis provided stability to the hock joint and improved the gait by restoring severe chronic damage. In conclusion, we successfully treated a challenging disability of hock joint using pan tarsal arthrodesis to restore the legs that were non-weight bearing due to chronic injury by traffic accident and objectively ascertained the increased weight bearing by gait analysis.

Design on the large section of station tunnel under shallow overburden (저토피고 대단면 정거장터널의 설계)

  • Jeong, Yun-Young;Choi, Hae-Joon;Kim, Byung-Ju;Yu, Bong-Won;Kim, Yong-Il;Oh, Sung-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.9 no.2
    • /
    • pp.171-182
    • /
    • 2007
  • For minimizing the effect on the focus of civil traffic and environment conditions related to the excavation at the traffic jamming points, an underground station tunnel was planned with 35.5 m in length and bigger area than $200\;m^2$ in sedimentary rock mass. It faced the case that the overburden was just under 13 m. Not based on a pattern design but on the case histories of similar projects and arching effect, the design of large section tunnel under shallow overburden was investigated on three design subjects which are shape effect on the section area, application method of support pressure, and supporting and tunnel safety. According to the mechanical effect from section shape, a basic design and a preliminary design was obtained, and then supporting method of large section was planned by the supporting of NATM and a pipe roof method for subsidence prevention and mechanical stability. From the comparative study between both designs, it was found that the basic design was suitable and acceptable for the steel alignment of tunnel lining, safety and the design parameter restricted by the limit considered as partition of the excavation facilities. Through the analysis result of preliminary design showing the mechanical stability without stress concentration in tunnel arch level, it also was induced that shape effect of the large section area and yielding load obtained from deformation zone in the surrounding rock mass of tunnel have to be considered as major topics for the further development of design technique on the large section tunnel.

  • PDF

Effective Evaluation of Quality of Protection(QoP) in Wireless Network Environments (무선 네트워크 환경에서의 효과적인 Quality of Protection(QoP) 평가)

  • Kim, Hyeon-Seung;Lim, Sun-Hee;Yun, Seung-Hwan;Yi, Ok-Yeon;Lim, Jong-In
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.18 no.6A
    • /
    • pp.97-106
    • /
    • 2008
  • Quality of Protection(QoP) provides a standard that can evaluate networks offering protection. Also, QoP estimates stability of the system by quantifying intensity of the security. Security should be established based on the circumstance which applied to appropriate level, and this should chose a security policy which fit to propose of network because it is not always proportioned that between stability of security mechanism which is used at network and performance which has to be supported by system. With evolving wireless networks, a variety of security services are defined for providing secure wireless network services. In this paper, we propose a new QoP model which makes up for weak points of existing QoP model to choose an appropriate security policy for wireless network. Proposed new QoP model use objectively organized HVM by Flow-based Abnormal Traffic Detection Algorithm for constructing Utility function and relative weight for constructing Total reward function.

Effect of Separation Between Main and Divergent Tunnels in Divergence Section of Double-Deck Tunnel on the Stability (복층터널 분기구에서의 터널 이격에 따른 안정성 영향)

  • La, You-Sung;Kim, Bum-Joo
    • Journal of the Korean Geosynthetics Society
    • /
    • v.15 no.2
    • /
    • pp.45-54
    • /
    • 2016
  • Double deck tunnels are considered to have a large demand in a near future for solving traffic congestion problems and overcoming the limitations in constructing new tunnels. This study presents a numerical investigation using finite element (FE) analysis on the behaviors of the tunnels and the stability of pillars in a divergence section where single tunnel is diverged from a main line double deck tunnel. The effects of the separation distance between the diverged and the main tunnels and the ground condition were examined through the FE analysis by varying the separation distance from 0.1D to 2.0D (D: diameter of main tunnel) and the rock class from class I to V, respectively, and the analysis results were compared with those using empirical methods, strength-stress ratio, and the volume of interference. The FE analysis results indicated that the separation distance has a larger effect on tunnel behaviors, compared with the rock strength, and a single tunnel with a large cross section is more favorable than two separated tunnels for tunnel stability when the separation distance is below 0.7D.

Stability analysis of an existing tunnel due to the excavation of a divergence tunnel emerging from double-deck tunnel (복층터널의 분기터널 굴착에 따른 기존터널의 안정성 분석)

  • Kim, Han-eol;Kim, Jung-Joo;Lee, Jae-Kook;Yoo, Han-Kyu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.5
    • /
    • pp.779-797
    • /
    • 2017
  • Recently, underground road construction is attracting attention because the ground transportation facilities in the urban area have reached the saturation level and traffic volume has increased and the air pollution has risen. Construction of underground roads is not only reduce trafficjam in downtown but also design the city eco-friendly, so existing roads as well as new roads go underground. It is essential to construct divergence tunnels that serve as IC (interchage) and JC (Junction) when constructing underpasses. Therefore, the analysis of the effect of the existing tunnel by the divergence tunnel should be considered. In this study, numerical analysis is performed to analyze the effect of existing tunnel on the excavation of the divergence tunnel. The divergence tunnels were set in 5 cases at $45^{\circ}$ intervals in the clockwise direction starting from the lower part of the existing tunnel. In each case, numerical analyses were carried out by using the DCM (Displacement Controlled Model) for applying the volume loss of 0.5%, 1.0% and 1.5%. As a result, when the volume loss increased, the effect on displacement, fracture range, and effect on stability increased as well. In addition, it was confirmed that the divergence tunnel located directly underneath is the weakest for the stability, and the case where the divergence tunnel is located diagonally rather than the vertical and horizontal direction is found to be vulnerable to displacement and lining destruction.

Evaluation on Patching Materials for Asphalt Pavement (아스팔트 포장도로의 응급보수재료 평가에 관한 연구)

  • Shim, Jae-Pill;Jin, Jung-Hoon;Park, Tea-Soon;Lee, Jae-Sik
    • International Journal of Highway Engineering
    • /
    • v.14 no.3
    • /
    • pp.59-67
    • /
    • 2012
  • This study presents the evaluation of the patching materials that are used to repair the distress of asphalt pavement. Four kinds of patching materials currently used in practice were tested in both laboratory and field. The laboratory tests included the dry and soaked Marshall stability test, indirect tensile test, wheel tracking test and adhesive strength between the asphalt pavement and the repairing material was tested as a performance test. The field study was conducted using the slab samples placed on the location of vehicle tire passing and the performance of the repairing materials were investigated as passing the traffic load. The result of the laboratory tests were satisfied with the current design criteria and material standard except for water-immersion stability. Type C patching material showed the highest adhesive shear strength among the patching materials tested. However, the mature distress, such as rutting and stripping were monitored after construction in 10 days. It was found that performance of patching material is lack of quality behavior when they were applied in the field and required to develop and applu to prevent the mature distress of the current patching materials.