Estimation Method of the Competitive Bid-price in Bid-rigging of Public Construction (기댓값 분석에 따른 공공공사 입찰담합의 가상경쟁가격 산정방법)

  • Jeong, Kichang;Kim, Wooram;Kim, Namjoon;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.3
    • /
    • pp.52-60
    • /
    • 2018
  • Korea's public construction projects are under construction through bidding, however, due to the nature of the bidding, collusion between participants can occur. The collusion of bids accordingly damages the client. So, it is necessary to calculate the appropriate fictitious competition price to compensate for this. In this regard, econometrics methods are generally used, but there are limitations and issues arising from the nature of construction, especially design-build bid. Therefore, this study proposes a method to estimate reasonable competitive bid-price in design-build bid. It derives the lowest bid-price from the design submitted by the proponent and estimates the competitive bid-price by examining the factors according to the penetration rate according to the technical level of the tester, the skill level of the competitor, and the type of tester. Based on the method proposed in this study, a reasonable price can be derived that reflects the characteristics of the design and construction bidding bidder selection method and also it can be used as a reference material in the actual bidding process as well as calculating the damage due to the answer.

A Study on the Evaluation System for Bidders to According to the Best Value Bid System by Technology Proposal Method (기술제안방식의 최고가치낙찰제도 입찰자 평가체계에 관한 연구)

  • Yeo, Sang-Ku;Lee, Gun;Lee, Hyun-Chul;Go, Seong-Seok
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2009.04a
    • /
    • pp.211-216
    • /
    • 2009
  • Bidding systems in the domestic public construction work have been amended many times since the lowest-bidding system was implemented in 1951. However, this hasn't had much success. Competition in technical development among companies has declined as the contracts for buildings are given to company which submits the lowest price without considering traits of projects. In addition, as the construction market turns to the limitless competition system due to FTA(Free Trade Agreement), advanced techniques are needed to promote the national competitive power. Considering the needs of the times, Korean government announced that "Best Value Contract (Design-Bid-Build)" and "Bridging Contracts (Design-Build)" are included to 4 existing bidding systems in October 2007. Thus this study aims to suggest devised the evaluation criteria including major items for evaluating bidders, in order to establish and revitalize the best-value bid system successfully.

  • PDF

최저가 낙찰제의 확대시행이 건설산업과 공공부문에 미치는 영향성 분석 Causal Loop Diagram 이용

  • Park, Kwang-Kuk;Kim, Tae-Min;Kim, Chang-Duk;Yu, Jung-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.267-272
    • /
    • 2007
  • In the construction industry government is not only an owner but also a consumer. Accordingly it should develop the construction industry and this role is important. Among them, the law of the ordering method is standards of selecting a successful bidder and have powerful influence over the construction industry and owners. Therefore this study said how the lowest bid method, which has taken effect still more, has influence on the construction industry and the public sector with the Causal Loop Diagram. According to analyzing this construction law, we can grasp the point of the strength and weakness of this law also examine a trend of how the present law is changed. While we studied, we tried to adhere to neutrality and form a new opinion about it because the previous studies were opposed to each other. As a result, to improve the relation between the government and private company, which were opposed to each other about arguments for and against the lowest bid method, this study suggest the method of making better the relation. The final goal of it is researching the inefficient factors and improving the weakness of this law.

  • PDF

The Prediction of Bidding Price using Deep Learning in the Electronic Bidding (전자입찰에서 딥러닝을 이용한 입찰 가격예측)

  • Hwang, Dae-Hyeon;Bae, Young-Chul
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.15 no.1
    • /
    • pp.147-152
    • /
    • 2020
  • The bidding program uses statistical analysis method of the collected bidding information and the accumulated bidding results from the public/private sector; however, it is not easy to predict the accurate bidding price by winning the bid method through multiple lottery. Therefore, this paper analyzes the accuracy of the current state data of the electric construction bid from January 2015 to August 2019 acquired from the electric net, which is an electronic bidding site, We use MLP and RNN method, and proposes a technique to predict the bidding amount necessary for the winning bid by predicting the amount between the first and the lowest bidder.

Valuation of Use Value on Environmental Goods (환경자원의 이용가치 평가)

  • 박용치
    • Survey Research
    • /
    • v.2 no.2
    • /
    • pp.83-107
    • /
    • 2001
  • The contingent valuation method uses survey questions to elicit people's preferences for public goods by finding out what they would be willing to pay for specified improvement in them. The method is thus aimed at eliciting their willingness to pay in money amounts. It circumvents the absence of markets for public goods by presenting consumers with hypothetical markets in which they have the opportunities to buy the good In question. The hypothetical markets may be modeled after either a private goods market or a political market. Respondents are presented with material, often in the course of a personal interview conducted face to face. An on-site survey was conducted to 1107 randomly selected P-mountain users using a dichotomous choice questionnaire for the contingent valuation method. Seventeen different bid sets were chosen ranging from the lowest bid of 300won to the highest bid of 2, 100won to elicit a reasonable entrance fee in the hypothetical market. The probability of an individual user's willingness to pay for the suggested bid had been determined, and the expected value of willingness to pay was estimated using binary-1ogit model. The average public value of P-mountain per individual user was estimated to be 1,055.92won ~ 1,995.61won according to the binary-logit model. The economic value of this P-mountain which includes both use value and existence value can be determined by aggregating the average value giving total willingness to pay for the entire population, in this case 5.491 billion ~ 10.377 billion.

  • PDF

Valuation of Use Value on Environmental Goods (환경자원의 이용가치 평가)

  • 박용치
    • Proceedings of the Korean Association for Survey Research Conference
    • /
    • 2001.04a
    • /
    • pp.83-107
    • /
    • 2001
  • The contingent valuation method used survey questions to elicit people's preferences for public goods by finding out what they would be willing to pay for specified improvement in them. The method is thus aimed at eliciting their willingness to pay in money amounts. It circumvents the absence of markets for public goods by presenting consumers with hypothetical markets in which they have the opportunities to buy the good in question. The hypothetical markets may be modeled after either a private goods market or a political market. Respondents are presented with material, often in the course of a personal interview conducted face to face. An on-site survey was conducted to 1107 randomly selected P-mountain users using a dichotomous choice questionnaire for the contingent valuation method. Seventeen different bid sets were chosen ranging from the lowest bid of 300won to the highest bid of 2,100won to elicit a reasonable entrance fee in the suggested bid had been determined, and the expected value of willingness to pay was estimated using binary-logit model. The average public value of P-mountain per individual user was estimated to be 1,055.92won∼1,995.61won according to the binary-logit model. The economic value of this P-mountain which includes both use value and existence value can be determined by aggregating the average value giving total willingness to pay for the entire population, in this case 5.491 billion ∼ 10.377 billion.

The Problems and Improvement Methods of Apartment Management Company Selection System (공동주택 관리업체 선정방식의 문제점과 개선방안)

  • Chun, Hyeon-Sook
    • Journal of the Korean housing association
    • /
    • v.23 no.2
    • /
    • pp.89-98
    • /
    • 2012
  • As the construction of multi-family housings, especially apartments, has been increased since 1970s, the multi-family housing becomes one of the main housing types in Korea. With the increase of multi-family housings, managing them becomes an important issue. Since 2010, the government has made a lowest price award system by a competitive bid compulsory to promote the development of housing management systems. Although competitive bids were implemented, the maintenance company was finally selected by the price without any other consideration. Consequently, the quality of management service was not enhanced. The purpose of this study is to suggest the improvement scheme of multi-family housing management system. In this study, the bidding data of "K-apt", the bidding method and the successful tendered price are analyzed. The results of analyzing bidding materials, the proportion of applying a lowest price system was 67.7%. Also many diverse ways to select the best management company were used, but most of these ways were violate the law and guidelines of Ministry of Land, Transport and Maritime Affairs. It meant that the lowest price award system was not implemented by strict standards and didn't correspond with the needs of residents of apartment. This condition made the housing maintenance quality low and deteriorated the management industry development. To enhance this condition, a new standard to select the management company, which are included contents of quality of managing quality, management expenses and companies' soundness, is necessary.

Analysis of the ordering factors influencing the awarding price ratio of service contract in KONEPS

  • Jung-Sung Ha;Tae-Hong Choi;Wan-Sup Cho
    • Journal of the Korea Society of Computer and Information
    • /
    • v.28 no.12
    • /
    • pp.239-248
    • /
    • 2023
  • The purpose of this study is to analyze the factors for service contracts that affect the successful bid price rate, focusing on the case of the country market. In the study, ordering organizations and bidders differentiated themselves from existing studies by analyzing service contracts that affect the successful bid price rate in a wide range of country markets. Comparative analysis of the awarding price ratio for services, this work provides a comparable result to the existing results in the previous literature. The analytical model used five independent variables such as budget, contract method, the days of the public notice, the awarding method, and the lowest awarding ratio. In the survey and analysis, big data was collected using text mining for service bids for Nara Market over the past 18 years and data was analyzed in a multi-dimensional way. The results of the analysis are as follows, (1) if budget does not determine the awarding price ratio. This is not the case in small amounts. (2) The contract method affects the awarding price ratio. (3) The days of the public notice increase, the awarding price ratio decrease. (4) the awarding method affects the awarding price ratio. (5) The lowest awarding ratio determines the awarding price ratio. Based on the results of empirical analysis, policy implications were sought.

Development of Awarding System for Construction Contractors in Gaza Strip Using Artificial Neural Network (ANN)

  • El-Sawalhi, Nabil;Hajar, Yousef Abu
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.3
    • /
    • pp.1-7
    • /
    • 2016
  • The purpose of this paper is to develop a model for selecting the best contractor in the Gaza Strip using the Artificial Neural Network (ANN). The contractor's selection methods and criteria were identified using a field survey. Fifty four engineers were asked to fill a questionnaire that covers factors related to the selection criteria of contractors practiced in Gaza Strip. The results shows that the dominant part of respondents (91%) confirmed that the current awarding method "the lowest bid price" is considered one of the major problems of the construction sector, "award the bid to the highest weight after combination of the technical and financial scores" represented 50% of the respondents. The criteria weights were determined based on Relative Importance Index (RII. Ninety-one tenders(13 projects) were used to train and test the ANN model after re-evaluating the contractors depend on the weights of factors to select the best contractor who achieves the highest score. Neurosolution software was used to train the models. The results of the trained models indicated that neural network reasonably succeeded in selection the best contractor with 95.96% accuracy. The performed sensitivity analysis showed that the profitability and capital of company are the most influential parameters in selection contractors. This model gives chance to the owner to be more accurate in selecting the most appropriate contractor.

Orders Status Analysis on the Successful Bidder Decision Method of Civil Turnkey.Alternative Tendering Construction (개선된 낙찰자 결정방식에 의한 토목 턴키.대안입찰공사 수주현황 분석)

  • Park, Hong Taea;Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.2
    • /
    • pp.164-177
    • /
    • 2013
  • From 2010 years to 2013, the selection method of successful bidder has been changed design suitable lowest method, comprehensive evaluation method(bid price adjustment, design score adjustments, weight standards), fixed amount best design method. Therefore this study was presented by analyzing the impact on the domestic construction industry according the way to determine the successful bidder, the evaluation order method and the operational issues through the analysis of order status, order number, results of acceptance an order, success rate range, results of acceptance an order according to weight success rate, results of acceptance an order by work type and order institution of a turnkey alternative tendering construction performed in domestic civil part.