• Title/Summary/Keyword: The benefit estimation

Search Result 232, Processing Time 0.021 seconds

A Parallel Implementation of Multiple Non-overlapping Cameras for Robot Pose Estimation

  • Ragab, Mohammad Ehab;Elkabbany, Ghada Farouk
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.8 no.11
    • /
    • pp.4103-4117
    • /
    • 2014
  • Image processing and computer vision algorithms are gaining larger concern in a variety of application areas such as robotics and man-machine interaction. Vision allows the development of flexible, intelligent, and less intrusive approaches than most of the other sensor systems. In this work, we determine the location and orientation of a mobile robot which is crucial for performing its tasks. In order to be able to operate in real time there is a need to speed up different vision routines. Therefore, we present and evaluate a method for introducing parallelism into the multiple non-overlapping camera pose estimation algorithm proposed in [1]. In this algorithm the problem has been solved in real time using multiple non-overlapping cameras and the Extended Kalman Filter (EKF). Four cameras arranged in two back-to-back pairs are put on the platform of a moving robot. An important benefit of using multiple cameras for robot pose estimation is the capability of resolving vision uncertainties such as the bas-relief ambiguity. The proposed method is based on algorithmic skeletons for low, medium and high levels of parallelization. The analysis shows that the use of a multiprocessor system enhances the system performance by about 87%. In addition, the proposed design is scalable, which is necaccery in this application where the number of features changes repeatedly.

Estimation of the Benefit from the Campaign to Prevent Drowsy Driving Crashes Using a Contingent Valuation Method (조건부 가치측정법을 이용한 고속도로 졸음운전 교통사고 예방 캠페인 편익 추정)

  • Park, Sangmin;Kim, Kyunghyun;Ko, Hangeom;Jung, Young Sick;Ryu, Jong Deug;Yun, Ilsoo
    • International Journal of Highway Engineering
    • /
    • v.18 no.5
    • /
    • pp.75-82
    • /
    • 2016
  • PURPOSES : This study was initiated to estimate the benefits from the campaign to prevent drowsy driving crashes on expressways. The study was conducted by the Korea Expressway Corporation using a contingent valuation method. METHODS : First, a questionnaire was designed for a preliminary survey. From the survey's results, the initial willingness to pay for the campaign was determined by averaging different amounts of payments chosen under virtual scenarios in the survey. The willingness to pay data was used to find a first bid price for the open-ended method used for the second survey. After that, a primary questionnaire was designed and conducted using a single dichotomous choice question (SDBCQ). Drivers at expressway resting areas were asked their willingness to pay for the campaign. Based on statistical analysis using data collected from the second survey, the mean willingness to pay was estimated using a probability utility function. Finally, the benefit from the campaign was calculated using the estimated willingness to pay and accident data on expressways. CONCLUSIONS : Based on the result from the contingent valuation method, the benefit from the campaign to prevent drowsy driving crashes was estimated to be 170.6 won per expressway trip. The benefit is to be paid as an additional toll. In addition, the traffic crash cost estimate is about 2,209,680,000 won less than the cost during the same period in 2014.

An Empirical Study on Relationship between Environmental Management and Sustainable Development (기업의 환경경영이 지속가능한 발전에 미치는 실증분석)

  • Jang, Kee-Yoon
    • Journal of Environmental Policy
    • /
    • v.8 no.3
    • /
    • pp.81-113
    • /
    • 2009
  • This study conducted a regulatory impact analysis regarding the introduction of the Korean version of REACH(Registration, Evaluation and Authorization of Chemicals). The direct cost of the Korean REACH is estimated at a total of 101 billion Korean won over the 11 year period. The cost includes pre-registration, testing, registration, Chemical Safety Assessment(CSA) and Chemical Safety Report(CSR), evaluation, and the authorization costs of 15,223 chemical substances produced and imported more than 1 ton per year in Korea in 2006. With regard to the benefit, the only public health benefit is included in the estimation. Based on the available foreign and domestic data, this study estimated that the economic values of public health benefits are in the range of 33.2~138.6 billion Korean won if only the savings of the National Health Expenditures are considered and it reaches 203.9~1,640.3 billion Korean won if the willingness to pay(WTP) for disease prevention is included. This study proved that the Korean REACH passed the cost/benefit criteria. The benefit-cost ratio of the Korean REACH, however, is estimated to be lower than its EU counterpart. Thus it is suggested that a rigorous study to reduce the costs to industry be required before the Korean government introduces the Korean REACH.

  • PDF

A Cost-Benefit Analysis on the Introduction of EU REACH to Korea (EU 신화학물질정책(REACH) 도입에 대한 비용편익 분석)

  • Cheong, Hoe-Seog
    • Journal of Environmental Policy
    • /
    • v.8 no.3
    • /
    • pp.53-79
    • /
    • 2009
  • This study conducted a regulatory impact analysis regarding the introduction of the Korean version of REACH(Registration, Evaluation and Authorization of Chemicals). The direct cost of the Korean REACH is estimated at a total of 101 billion Korean won over the 11 year period. The cost includes pre-registration, testing, registration, Chemical Safety Assessment(CSA) and Chemical Safety Report(CSR), evaluation, and the authorization costs of 15,223 chemical substances produced and imported more than 1 ton per year in Korea in 2006. With regard to the benefit, the only public health benefit is included in the estimation. Based on the available foreign and domestic data, this study estimated that the economic values of public health benefits are in the range of 33.2~138.6 billion Korean won if only the savings of the National Health Expenditures are considered and it reaches 203.9~1,640.3 billion Korean won if the willingness to pay(WTP) for disease prevention is included. This study proved that the Korean REACH passed the cost/benefit criteria. The benefit-cost ratio of the Korean REACH, however, is estimated to be lower than its EU counterpart. Thus it is suggested that a rigorous study to reduce the costs to industry be required before the Korean government introduces the Korean REACH.

  • PDF

The Forecast on the Benefit of Traffic Safety Facility for the Inland Waterway in Cambodia -Focusing on the section between Phnom Penh and Chong Kneas port- (캄보디아 내륙수로의 교통안전시설에 대한 편익추정 -프롬펜과 총크니아스항 구간을 대상으로-)

  • Kim, Jung-Hoon
    • Journal of Korea Port Economic Association
    • /
    • v.25 no.2
    • /
    • pp.73-94
    • /
    • 2009
  • In this paper the benefit was forecasted for traffic safety facilities to be constructed along the inland waterway between Phnom Penh and Chong Kneas(Siem Reap) port in Cambodia. First of all, the number of cruise ships passengers and cargo volumes were predicted. Second, the traffic volume of the cruise ships and cargo ships were calculated according to the prediction. Last, the safety benefit of traffic safety facilities was forecasted with the traffic after surveying the waterway accidents. The other benefit was also presented by converting the effect of relieving the emotional burden of navigators into currency value. Accordingly the entire benefit was estimated to be $14,990, $20,950 and $28,540 for pessimistic, moderate and optimistic prospects, in 2011. And then the entire benefits are calculated as $28,320, $63,060 and $95,230 for each prospect in the final estimation year 2020.

  • PDF

A Study on Differences of Economic Benefits by Volume Calibration in Road Construction Projects (도로시설 규모산정에 있어서 교통량 정산과정에 따른 경제적 편익 차이에 관한 연구)

  • Kim, Sang-Gu;Kim, Geun-Deok
    • Journal of Korean Society of Transportation
    • /
    • v.27 no.5
    • /
    • pp.7-16
    • /
    • 2009
  • This paper proposes a plan which can raise the accuracy of economic benefit estimation in road construction projects. The point of existing economic appraisals may be that the speeds forecasted by models are different from the field speeds because only volumes are calibrated in the road network. The result of such a calibration has an influence on estimating wrong economic benefits in terms of vehicle operating cost savings, travel time savings, and air pollution savings. Then this study performs a calibration when volumes are at the same amount but the calibration between the field speeds and model speeds is different from each other with two different volume-delay functions; the differences of benefits are confirmed according to two different speed calibrations. Three improvement schemes, including the development of a new volume-delay function, are proposed in this study in order to solve the problem of current benefit calculations. The outcome of this study will help practitioners perform more accurate benefit calculations and reasonable economic appraisals.

Quantitative Methodology for Analyzing Propriety of Complement and Salary on Military Organization - Concentrating on Army Doctrine Research Institution - (군(軍) 내 민간인력 적정 규모 및 임금 분석을 위한 정량적 방법론 - 육군 교리업무조직을 중심으로 -)

  • Beak, Byungho;Kim, Yeekhyun;Lee, Yong-Bok;Min, Seunghee;Jee, Yonghoon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.43 no.1
    • /
    • pp.34-41
    • /
    • 2020
  • There has not been any scientific analysis on appropriate size of workforce and salary for civilian workers in military so far. Thus, this paper conducted analysis on propriety in employment size of military doctrine researchers using system dynamic methodology based on annual military doctrine workload. Vensim software was mainly used to measure complement of the research group based on data from job analysis. Secondly, a multiple regression analysis was performed to study an appropriate wage for researchers based on their expertise and working condition. The data from twenty public research institutions and twenty eight job positions that are performing similar duty with military doctrine researchers was obtained and utilized to create a salary-estimation regression equation in the analysis. Finally, with cost-benefit analysis method this paper studied financial effectiveness of hiring military doctrine researchers. Contingent valuation method, which has been recognized as one of the most effective methodologies in cost-benefit analysis on intangible value, was utilized to measure benefit of hiring the researchers. The methodology presented in this paper can be applied to measure and improve the efficiency of military organization not only in military doctrine research area but also in several military functional area (military training, logistics, administration, combat development, and combat support).

An Economic Estimation of Tourism Effects by Travel Cost Method -Application for Daeho Rural Tourism & Leisure Complex- (여행비용접근법(TCM)에 의한 관광효과 추정 - 대호농어촌관광휴양단지를 중심으로 -)

  • Ryoo, Young-Hee;Lim, Jae-Hwan;Koo, Seung-Mo
    • Korean Journal of Agricultural Science
    • /
    • v.31 no.2
    • /
    • pp.123-134
    • /
    • 2004
  • Since 1989, 9 major complex have been invested with government funds, for the purpose of developing agricultural tourism to increase agricultural income and job opportunity, as well as providing urban population leisure opportunity. However, systematic and comprehensive approaches were rarely done in analyzing its economic impacts. This study, therefore, focuses on analyzing tourism effect and its economic value and implication for a representative rural tourism site,"Daeho rural tourism complex". To analyze travel pattern, expenditure pattern, and degree of satisfaction from travel to Daeho complex, Travel Cost Method(TCM) was employed based on survey method. Results from linear model with statistical significance implies that tourism benefit for each visitor is 28,373 won and total annual benefit for the Daeho site is 7 billion won. Considering annual benefit stream, the present value of total benefits are 132.9 billion won and 70 billion won at 5% and 10% of discounting rate, respectively. Using the values of benefit estimated from this study and investment cost, B/C ratio, IRR, and NPV were calculated to be 1.01, 1.67 billion won, and 5.19% at 5% of discounting rate. These results could be directly compared with the previous analyses.

  • PDF

Methodology for Benefit Evaluation according to Maintenance Method and Timing of National Highway Pavement Section (국도포장 유지보수 공법 및 시기에 따른 편익산정 방안)

  • Do, Myungsik;Kwon, Soo Ahn;Choi, Seunghyun
    • International Journal of Highway Engineering
    • /
    • v.15 no.5
    • /
    • pp.91-99
    • /
    • 2013
  • PURPOSES : This study aims at proposing the methodology for benefit evaluations in pavement maintenance methods and timings using KoPMS(Korean Pavement Management System) software which was developed for efficient pavement management. METHODS : This study classified pavement sections into 4 clusters considering AADT(Annual Average Daily Traffic) and ESAL(Equivalent Single-Axle Load) using cluster analysis and used the deterioration models in each cluster. Increased user costs due to pavement deterioration as time goes by and agent costs for maintenance were estimated. Based on deterioration model and KoPMS software, Methodology for benefit evaluation was proposed in pavement maintenance methods and with/without implementation using real pavement section data. RESULTS : This study verified that considering agent costs only would be constrained to decide pavement maintenance methods and timings, and ascertained that decision making with agent and user costs would be effective. In addition, this study revealed that pavement maintenance methods and timings can be affected by AADT and ESAL and frequent pavement maintenances can be more efficient for benefits in pavement sections with more AADT and ESAL. Also this study found that user costs would be more affected to decision making than agent costs. Moreover, Delay of conducting pavement maintenance caused increased vehicle operating costs and environmental costs because of poor conditions of pavements. CONCLUSIONS : This study proposed LCCA and benefit estimation methodology of pavement with considering agent and user costs. The results of this study can be used for baseline data of efficient pavement asset management.

A Model for Man-Machine System Evaluation (II) (인간 - 기계시스템의 평가모델 (II))

  • 이상도;하정진;정중희;이동춘
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.9 no.13
    • /
    • pp.17-22
    • /
    • 1986
  • Man-machine system is an integrated total system which is linked by functions of man and machine, and the value of the system is determined by its compatability. And it is able to evaluate the system value on the aspects of utility, availability, and cost benefit. The authors previously represented the methodology of system utility using transfer functions, and this paper successively discusses the reliability of man-machine system. The reliability estimation and evaluation methodologies are briefly mentioned, and some examples are shown in this paper.

  • PDF