• Title/Summary/Keyword: Temporary retaining structure

Search Result 33, Processing Time 0.027 seconds

APPLICATION OF USN TECHNOLOGY FOR MONITORING EARTH RETAINING WALL

  • Sungwoo Moon;Eungi Choi;Injoon Kang
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.517-520
    • /
    • 2013
  • In construction operation, the temporary structure is used to support designed facilities or to provide work spaces for construction activities. Since the structure is used only during the construction operation, the operation may be given insufficient attention. The contractor is likely to try to save cost on the material and labor cost. This contractor's behavior frequently leads to construction accidents. In order to prevent accidents from the failure, the operation should be carefully monitored for identifying the effect of dynamics in the surrounding site area. Otherwise, any unexpected adversary effect could result in a very costly construction failure. This study presents the feasibility of the ubiquitous sensor network (USN) technology in collecting construction data during the construction operation of earth retaining walls. The study is based on the result at the Construction System Integration Laboratory (CSIL) at the Pusan National University. A USN-based system has been developed for monitoring the behavior of the temporary structure of earth retaining walls. The data collected from the sensors were used to understand the behavior of the temporary structure. The result of this study will be used in increasing the safety during the construction operation of retaining walls.

  • PDF

A Study on the Self-contained Earth Retaining Wall Method Using Bracing (브레이싱을 이용한 자립식 흙막이 공법에 관한 연구)

  • Kim, Jong-Gil
    • Journal of Digital Convergence
    • /
    • v.17 no.3
    • /
    • pp.205-213
    • /
    • 2019
  • In a construction site, excavation work has a close relation with temporary earth retaining structure. In order to build the underground structure most effectively in a narrow space, prevent soil relaxation of the external behind ground in excavation work, and maintain a ground water level, it is required to install a temporary earth retaining structure that secures safety. To prevent soil washoff in underground excavation work, the conventional method of temporary earth retaining structure is to make a temporary wall and build the internal support with the use of earth anchor, raker, and struct for excavation work. RSB method that improves the problem of the conventional method is to remove the internal support, make use of two-row soldier piles and bracing, and thereby to resist earth pressure independently for underground excavation. This study revealed that through the field application cases of RSB method and the measurement result, the applicability of the method for installing a temporary earth retaining structure, the assessment result, and displacement all met allowable values of measurement, and that the RSB method, compared to the conventional method, improved constructability and economy.

Application of Wireless Measurement System for Safety Management of Temporary Substructures (가설공사 안전관리를 위한 무선계측 시스템 적용)

  • In, Chi-Hun;Rhim, Hong-Chul;Lee, Kun-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.21-24
    • /
    • 2009
  • This study deals with the application of USN wireless inclinometer sensor for earth retaining structure safety measurement, The application of wireless inclinometer sensor has great advantage about real-time monitoring of earth retaining structure, It allows a construction manager to monitor movement data from anywhere connected through internet during the process of excavation for substructures of buildings, To validate the applicability of the wireless inclinometer sensor. laboratory and field tests have been performed, The results have shown that the measured values of wireless inclinometer sensor represent the behavior of H-pile well, Both convenience of sensor installation and real-time monitoring of earth retaining structure are confirmed, The proposed wireless measurement system provides a good basis for exact measurement of temporary substructures, More measurements and application are expected for the other excavation sites with various conditions.

  • PDF

The Application of KOESWall System as a Temporary Structure (임시구조물로서 분리형 보강토 옹벽의 적용사레)

  • 김영윤
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.09a
    • /
    • pp.53-58
    • /
    • 2000
  • The KOESWall system that minimizes the horizontal deformation of reinforced wall effectively was developed bt E&S Eng. Co., Ltd. in 1999. Due to its systematical feature i.e. isolated construction method. KOESWall system is able to use as temporary structures more economically without the facing block. In this report, it is shown that the case history of KOESWall as a temporary soil retaining structure and the field measuremnets.

  • PDF

A study on the Remote Control System for Measuring Gradient of temporary earth retaining structure (흙막이 가시설 구조물의 무선원격계측관리시스템에 관한 연구)

  • Woo, Jong-Yeol;Hong, Seong-Wook;Kim, Sang-Won;Seo, Yong-Chil;Shin, Chan-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05b
    • /
    • pp.49-52
    • /
    • 2011
  • This study concerned with the retention structures or inverted temporary building for displacement measurement in the underground soil after drilling a vertical tilt sensor attached to the vertical distance required to maintain a real-time measurement and management in order to install the wireless measuring devices installed in the field through remote control and management program for the safety of retaining structures temporary building be found on the internet in real time temporary building the retention is to develop a safety management system. And based on this technology to monitor the future status of the various structures possible to add a variety of sensors and Life Cycle Prediction of the structure and needs to evolve into intelligent systems and wireless networks using wireless communications infrastructure systems based on expanding domestic market penetration by developing instrumentation pioneer in overseas markets as well as the activation can also be judged.

  • PDF

Design Optimization of Earth Retaining Walls Using the Taguchi Method (다구찌 기법을 활용한 흙막이 가설공법 최적설계 방안)

  • Moon, Sungwoo;Kim, Sungbu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.1
    • /
    • pp.83-89
    • /
    • 2017
  • Temporary structures provide the accessible working area when building a permanent building structure in the construction operation. Executed in a natural environment, the temporary structure is prone to the external influence factors of underground water, soil conditions, etc. These factors should be carefully considered in designing the temporary structure. The objective of this study is to apply the external influence factors in designing a more reliable earth retaining wall. The research methodology is based on the Taguchi method that has been studied to improve product quality in the industry. An orthogonal array was developed to analyze the interaction between the external influence factors and the internal influence factors. A sample case study demonstrated that the Taguchi method can be used in planning a more reliable temporary structure for earth retaining walls.

An Analysis of Flexural Performance of Concrete Filled Soldier Pile Applied to Temporary Retaining Wall (흙막이 벽체에 적용하는 콘크리트 충전형 엄지말뚝의 휨성능 분석)

  • Park, Yong-Hyeon;Kim, Do-Bumn;Ju, Young-Kyu;Yang, Il-Seung;Yom, Kyong-Soo
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.3
    • /
    • pp.19-25
    • /
    • 2019
  • The purpose of this study was to evaluate bending performance of concrete filled soldier pile for temporary retaining wall. Structural performance tests were conducted on total number of four specimens. Each specimen had a unique characteristics with combination of the following variables, existence of reinforcing bar and locations of reinforcing steel plates. The results of this study were as follows; concrete filled steel tubes with being reinforced bar and flange rather than non-bar showed better performance. Higher yield, tensile strength and sufficient plastic strain were archived and maximum moment observed in experiments exceeded theoretical maximum moment in both allowable stress design and limit state design at all specimens.

Stability Analysis of the Light Weight Earth-Retaining Structure in the Trench Excavation (트렌치 굴착에 있어서 경량 흙막이 구조체의 안정성 해석)

  • Seo , Sung-Tag;Heo , Chang-Han;Kim , Hee-Duck;Jee , Hong-Kee
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.46 no.2
    • /
    • pp.93-103
    • /
    • 2004
  • In trench excavation, essential factor of earth-retaining temporary work structure should be easy taking to pieces and movement, and dead weight must be less. This paper studies about the light weight material and application as earth-retaining structure to prevent the slope failure of sand soil ground caused by the variation of groundwater level in trench excavation. That is, light weight earth-retaining structural is proposed and a simulation with FEM on application of proposed structural in sandy soil is presented. The results are summarized as follows; (1) The study proposed FRP H-shaped pannel for the light weight member, and also presented estimation method about stability. (2) Mechanical property (bending moment, shear force, axial force, displacement) were changed according to groundwater level, but these values had been within enough safety rate and allowable stress. Therefore, proposed light weight pannel with FRP is available for bracing structure in trench excavation.

Parametric Study on Displacement of Earth Retaining Wall by the Bermed Excavation Using Back Analysis (역해석을 통한 소단굴착에 따른 흙막이 벽체변위의 매개변수 연구)

  • Lee, Myoung-Han;Kim, Tae-Hyung
    • Journal of the Korean Geosynthetics Society
    • /
    • v.14 no.4
    • /
    • pp.23-33
    • /
    • 2015
  • Together with the wall stiffness, a berm has the role of deciding the stability of a temporary retaining wall before structure installation after excavation. Especially in case of loose or soft soil excavated ground, the role of berm is very important. In this study, the measurement data obtained from the temporary retaining wall in the bermed excavation site in urban and numerical analysis are used to investigate the effects of berm's dimension (width and slope), excavation depth and ground property on the maximum horizontal displacement of the temporary retaining wall. The measurement data indicated that the wall displacement varied to the berm's width. That is, as the berm width decreased, the wall displacement increased. As a result of numerical analyses, the maximum wall displacement increased as slope increased and berm width decreased. This means that the berm is effectively restrained to the wall displacement. As excavation depth increased, the effect of berm's slope and width increased. In case of the same berm condition, the wall displacement restrained as ground property increased.

Strut as a Permanent System using Composite Beams (층고절감형 거더를 이용한 영구 스트러트 공법)

  • Hong, Won-Kee;Park, Seon-Chee;Kim, Jin-Min;Lee, Ho-Chan
    • KIEAE Journal
    • /
    • v.8 no.1
    • /
    • pp.87-92
    • /
    • 2008
  • Sheathing work used for excavation in a crowded downtown is generally a temporary strut method using H-piles and sheathing wall includes lagging, CIP, SCW or slurry wall. A temporary strut serving the support for sheathing wall acts to resist the earth pressure, but it shall be removed when installing the underground structure members. A traditional temporary strut might cause the stress imbalance of the sheathing wall when it is demolished, resulting in time extension and the risk of collapse. A traditional temporary strut method thus needs to be improved for schedule and cost reduction, risk mitigation and for preparation for potential civic complaint. A permanent strut method doesn't require installing and demolishing the temporary structure that will lead to reducing the time and cost and the structural risk during the demolition process. And given the girder, the part of the underground structure, serves the role of strut, it can secure the wider interval compared to the traditional method, which enables to secure the wider space for the convenience of excavation as well as enhance the constructability and efficient site management. The thesis was intended to study the composite girder designed to use the strut as permanent structure so as to reduce the excavation and floor height.