• Title/Summary/Keyword: Temporary Construction

Search Result 496, Processing Time 0.025 seconds

3-D Temporary Facility Visualization Using BIM(Building Information Modeling) Technology

  • Kim, Hyun-Joo;Ahn, Hong-Seob;Kim, Woo-Young
    • Journal of Construction Engineering and Project Management
    • /
    • v.1 no.2
    • /
    • pp.37-42
    • /
    • 2011
  • The key role in safety management is to identify any possible hazard before it occurs by identifying any possible risk factors which are critical to risk assessment. It is well known that falsework (temporary facilities) in construction projects is fundamentally important. This planning/assessment process is considered to be tedious and requires a lot of attention due to the following reasons: firstly, the installation and dismantling of those facilities are one of the high risk activities in the job sites. Secondly, temporary facilities are generally not clearly delineated on the building drawings. Therefore, it is our strong belief that safety tools have to be simple and convenient enough for the jobsite people to manage them easily and be flexible for any occasions to be occurred at various degrees. In order to develop a safety identification system of temporary facilities, this research utilizes the BIM technology in retrieving important information by importing data from BIM models and use it in the safety planning stage.

Integration of Temporary Fences for Demolition and Construction (해체${\cdot}$신축용 가설울타리의 통합방안)

  • Sin Dong-Sung;Jeon Jae-Man;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.258-261
    • /
    • 2003
  • Demolition is mort dangerous than construction and causes a lot of harmful environmental factors. But temporary fences used on demolition sites cannot play out their roles of blocking harmful environmental factors or securing stability and work space. They only block the view from the outside. This study begins with the possibility that the temporary fence can be installed prior to demolition. As a preceding step. we performed research on the actual conditions of using it. We then realized that it can be installed according to our research plan. First, we focused on actualizing the integration of temporary fences for demolition and construction. Here are the results of this study. First, we need to grasp the limiting factors of integration. Second, we ought to revise the Korean Architecture Standard Specification. Third, we should prepare against damage and transformation of fences. Finally, we can expect to reduce harmful environmental factors, cut down expenses, improve the working environment and raise the image of demolition by the integration of these fences.

  • PDF

Safety Management of the Retaining Wall Using USN Sonar Sensors (USN 초음파 센서를 활용한 흙막이 안전관리)

  • Moon, Sung-Woo;Choi, Eun-Gi;Hyun, Ji-Hun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.22-30
    • /
    • 2011
  • In the construction operation, foundation work should be done in advance for the building structure to be installed. This foundation work include a number of activities such as excavation, ground water prevention, piling, wale installation, etc. Caution should be taken in the operation because the dynamics of earth movement can cause a significant failure in the temporary structure. The temporary structure, therefore, should be constantly monitored to understand its behavior. This paper introduces the USN-based monitoring system to automatically identify the behavior of the temporary structure in addition to visual inspection. The autonomous capability of the monitoring system can increase the safety in the construction operation by providing the detailed structural changes of temporary structures.

Evaluation of Corrosion Thickness Loss of Temporary Steel Members Exposed to A Subway Construction Site (지하철 공사현장 환경하의 가시설 강재의 부식두께감소량 추정)

  • Kim, In Tae;Jeon, Sang Hyuck;Hur, Jung Ok;Cheung, Jin Hwan
    • Journal of Korean Society of Steel Construction
    • /
    • v.21 no.3
    • /
    • pp.301-310
    • /
    • 2009
  • Steel has been widely used as a material in temporary structures. Corrosion attack often reduces the long-term durability of temporary steel members that are not protected from corrosion. In designing temporary steel structures, it is difficult to evaluate their long-term durability, since the thickness loss of steel members is not clear. In this study, laboratory and field exposure corrosion tests were performed on structural steel plate specimens, and the loss of thickness of specimens that were exposed to a subway construction site for 11 months and of specimens that were exposed to environments with controlled humidity and calcium chloride for six months were measured. Finally, a thickness loss equation was formulated based on the environmental conditions and the testing periods.

A Study on the Risk Rate of Work Type According to the Fatal Accident Cases and the Work Strength in Construction Work (중대재해사례와 직업강도를 고려한 건축공사 위험성 평가)

  • Lee, Jong-Bin;Go, Seong-Seok;Jang, Seong-Rok
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.4 s.76
    • /
    • pp.102-107
    • /
    • 2006
  • Construction accidents have not decreased in spite of much effort such as new work methods, education and research related to safety works. Specially, many fatal accidents happened in construction works which involve the apartment, building, school, church, hotel, hospital, bank work and the other works. These accidents are mainly caused by unanticipated risk factors. From these reasons, this study researched fatal accidents which happened in construction works during last 13 years($1992{\sim}2004$) and analyzed the input workers and a work period of construction work. According to the input workers and a work period, the results are as following. During 13years($1992{\sim}2004$), the fatal accidents, related to the construction work, were happened to the 1,977 cases. These results were occupied the 21.32% of the total industry accidents. According to the result of the construction, the fatal accident rate of a concrete form work was the highest rate of 16.24% (321 cases) and a temporary work, a steel frame work was the each rate of 12.39%(245 cases), 10.07%(199 cases). Comparing to other work types, the fatal accident rate of those three work types(concrete form work, temporary work, steel work) was represented highly. We surveyed input workers and work period of construction work site. From the result of survey, input workers of a concrete form work were occupied with 13,720. The risk rate of the work type, which was considered input workers and work period, was represented 0.3622(a steel frame work), 0.1142(a temporary work), 0.0782(a tower crane) and 0.0772(a concrete work).

Case Study for Buckling Design of Temporary Bridges using System Buckling Analysis (시스템좌굴 해석법을 이용한 라멘형가교 주요부재의 좌굴설계에 관한 사례 연구)

  • Kyung, Yong Soo;So, Byoung Hoon;Bang, Jin Hwan;Kim, Moon Young
    • Journal of Korean Society of Steel Construction
    • /
    • v.19 no.1
    • /
    • pp.87-98
    • /
    • 2007
  • Generally, main girders and steel piers of temporary bridges form the steel rahmen structure. In this study, the rational stability design procedure for main members of temporary bridges was presented using a 3D system buckling analysis and second-order elastic analysis. Six types of temporary bridges, which can be designed and fabricated in reality, were chosen and the buckling design for them was performed in consideration ofload combinations of dead and live loads, thermal load, and wind load. Effective buckling length of steel piers, transition of 3D buckling modes, and effects of second-order analysis were investigated through a case study involving six temporary bridges.

Development of a Bracing System Preventing Falling Down of Movable Scaffoldings in Temporary works (가설공사의 이동식 비계 전도방지 버팀대 개발)

  • Jang, Myung-Houn
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.31-33
    • /
    • 2012
  • Movable scaffolding has been used to work in high places. The scaffolding is economical and convenient to move to other places, but it has the risk of falling down. This paper proposes a fixed bracing system to prevent the falling down of a movable scaffolding, and evaluates its usability by making a small-sized model. Further studies of structural stability, safety, and economical efficiency is necessary to use the system practically.

  • PDF

A Study on the Characteristics of Disaster Temporary Sheltering in Terms of Sustainable Design -Focused on the Case of the Wenchuan Earthquake in Sichuan Province- (지속가능성 측면에서 재난 임시대피소의 특성 연구 -쓰촨성(四川省) 원촨(汶川) 지진 사례를 중심으로-)

  • Tian, Hui;Yoon, Ji-Young;Wang, Dan
    • The Journal of the Korea Contents Association
    • /
    • v.21 no.5
    • /
    • pp.877-888
    • /
    • 2021
  • This study used three types of temporary shelters, tents, and prefabricated houses provided by the Chinese government for victims after the Wenchuan earthquake in 2008 as case study objects. Through literature review, 12 evaluation items were selected from the social, economic, and environmental elements of the sustainability of residential space design to analyze and evaluate three types of temporary shelters, and derive their respective characteristics and problems. The analysis results show that the temporary centralized settlements and tents had problems such as imperfect infrastructure, poor sanitation, narrow living space, no personal space, and inconvenience in life. Prefabricated houses had problems such as high construction costs, non-environmentally friendly building materials, occupation of arable land, low recycling rate of materials, and environmental pollution by waste. The common problem of the three types of shelters was that the government took the lead in the construction and distribution of shelters, and the disaster victims passively accept government support. Therefore, disaster victims were not actively involved in the construction and management of temporary communities. Secondly, the designs of all three types of temporary shelters did not fully consider the psychological needs of the victims, especially the need for safe and hygienic personal space. Finally, this research proposes improvement plans for the problems in the sustainable design of three temporary shelters and the construction and management of temporary communities.

Application of Ubiquitous Sensor Network at Construction Sites (건설 시공현장에서의 USN 활용)

  • Moon, Sung-Woo;Choi, Byoung-Young;Ji, Young-Eun;Seo, Ki-Jeong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.905-908
    • /
    • 2007
  • Concrete placement work is executed using temporary structures such as formwork, support, etc. The temporary structures could collapse when they are not properly supported, and need to be monitored for structural safety. This paper introduces a USN (Ubiquitous Sensor Network)-based monitoring system that are being tested at the Pusan National University for increasing structural safety. The system takes advantage of ubiquitous technologies together with a variety of sensors, which allows for wireless transmission of construction monitoring data. The temporary structures are constantly monitored to find out whether the structures are being supported in a stable condition. A field test is being conducted to acquire data, and use them for evaluating the safety condition of the construction operation.

  • PDF

The Application of KOESWall System as a Temporary Structure (임시구조물로서 분리형 보강토 옹벽의 적용사레)

  • 김영윤
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.09a
    • /
    • pp.53-58
    • /
    • 2000
  • The KOESWall system that minimizes the horizontal deformation of reinforced wall effectively was developed bt E&S Eng. Co., Ltd. in 1999. Due to its systematical feature i.e. isolated construction method. KOESWall system is able to use as temporary structures more economically without the facing block. In this report, it is shown that the case history of KOESWall as a temporary soil retaining structure and the field measuremnets.

  • PDF