• Title/Summary/Keyword: Temporary Building

Search Result 217, Processing Time 0.031 seconds

Comparison of Characteristics for Establishing Quality Standards of Modular Buildings for Temporary Classrooms (임시교실용 모듈러 건축물의 품질기준 마련을 위한 특성비교)

  • Lee, Jong Sung;Park, Jae-Woong;Lim, Gun-Su;Kim, Jong;Han, Min-Cheol;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.83-84
    • /
    • 2023
  • Wall structure smart modular is a building construction method where modules are manufactured in a factory and assembled on-site. This method is gaining popularity in the construction industry as it reduces construction time and mitigates risks such as material supply and labor costs. Wall structure smart modular is necessary as it provides comfortable temporary classroom space during renovation and remodeling of aging school buildings. The structure and characteristics of each type of temporary classroom modular were compared, and wall structure modular showed superior performance in terms of height and weight competitiveness compared to mixed structures. With these advantages, wall structure modular can ensure economic efficiency and recyclability as a temporary classroom. In the future, we aim to compare and analyze the standards such as inter-floor noise and heat transfer coefficient for wall structure and mixed structures.

  • PDF

3D BIM Modeling of Temporary Structure for Earthwork using Parametric Technique (파라메트릭 기술을 이용한 토공용 임시 구조물의 3D BIM 모델링)

  • Tanoli, Waqas Arshad;Raza, Hassnain;Lee, Seung-Soo;Park, Sang-Il;Seo, Jong-won
    • Journal of KIBIM
    • /
    • v.8 no.2
    • /
    • pp.1-9
    • /
    • 2018
  • Nowadays Building Information Modeling (BIM) is a significant source of sharing project information in the construction industry. This method of sharing the information enhances the project understanding among stakeholders. Modeling of information using BIM is becoming an essential part of many construction projects around the globe. Despite rapid adoption of BIM in construction industry still, some sectors of the industry like earthwork have not yet reaped its full benefits. BIM has brought a paradigm shift through identification and integration of the roles and responsibilities of project participants on a single platform. BIM is a 3D model-based process which provides the insight into the efficient project planning and design. The 3D modeling can also be used significantly for the design of temporary structures in an earthwork project. This paper presents the quantity take-off methodology and parametric modeling technique for creating the temporary structures using 3D BIM process. A case study is conducted to implement the proposed temporary structure family design on a real site project. The study presented is beneficial for the earthwork project stakeholders to extract the relevant information using 3D BIM models in a project. It provides an opportunity to calculate the quantity of material required for a project accurately.

Knowledge Reorganization Method of Temporary Facility Planning for High-rise Building Constructions (고층건축공사를 위한 가설계획 지식의 체계화 방법)

  • Kim Wan-Soo;Choi Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.411-414
    • /
    • 2002
  • As high density of cities, construction project is getting to be high rise, large sized and multi purposed, whereas it has some difficulties due to disordering of classification and undeveloped management systems. In this study, it would be suggested that classification method for knowledge and constraint of temporary facility in order to efficient decision making of temporary facility planning with knowledge reorganization and establishment process.

  • PDF

Preliminary study for Vertical Dynamic Site Layout Planning of High-Rise Building Construction (고층공사 가설시설물의 동적수직배치 최적화를 위한 기초연구)

  • Pyo, Kiyoun;Lee, Dongmin;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.39-40
    • /
    • 2018
  • The goal of site layout planning(SLP) is to maximize the productivity and efficiency of the construction by reducing travel distance and material handling cost and manpower. However, SLPs are static layout schemes, which cannot be reorganized during the construction process to correspond with errors, phase transition, changing working environments on the site. To solve this problem, researches on dynamic site layout planning(DSLP) are emerging. This preliminary study clarifies characteristics of temporary facility's variables to develop the vertical DSLP algorithm of high-rise building construction.

  • PDF

Citic Tower Construction Key Technology

  • Xu, Lishan
    • International Journal of High-Rise Buildings
    • /
    • v.8 no.3
    • /
    • pp.185-192
    • /
    • 2019
  • Citic Tower is the first over-500 m-tall super highrise building in the world, located in the high seismic intensity area with paek ground acceleration over 0.2g in 475 years. This project is unique in its complexity, large volume, and challenging site conditions (zero site for construction). The traditional techniques can hardly meet safty, quality and schedule requirements of the construction. This article introduces the key construction technologies that are innovatively developed and applied in Citic Tower project construction, including intelligent super-high-rise building integrated construction platform system, independently developed by the CCTEB; Jump-Lift Elevator, which is the first of the kind with service height over 500 meters; combined temporary-and-permanent fire protection systems. The BIM technology is also applied in this project. Through technical innovation, and utilization of technologies, construction speed and safety had been greatly improved.

Development of a Bracing System Preventing Falling Down of Movable Scaffoldings in Temporary works (가설공사의 이동식 비계 전도방지 버팀대 개발)

  • Jang, Myung-Houn
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.31-33
    • /
    • 2012
  • Movable scaffolding has been used to work in high places. The scaffolding is economical and convenient to move to other places, but it has the risk of falling down. This paper proposes a fixed bracing system to prevent the falling down of a movable scaffolding, and evaluates its usability by making a small-sized model. Further studies of structural stability, safety, and economical efficiency is necessary to use the system practically.

  • PDF

Identifying Construction Engineering Tasks at the Design Phase for Enhancing Constructability in High-rise Building Construction - Focused on Temporary Work - (고층 건축공사의 시공성 향상을 위한 설계단계의 시공엔지니어링 업무 도출 - 가설공사를 중심으로 -)

  • Lee, Jin-Woong;Cho, Kyu-Man;Kim, Tae-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.5
    • /
    • pp.453-463
    • /
    • 2017
  • Due to the increase in the size of buildings and scale, the importance of construction engineering that reflects the constructability from the design stage of the project is increasing. Especially, engineering efforts related to facilities, equipment and construction methods for temporary work at the design stage can significantly contribute to improvement of constructability and project performance. The purpose of this study is to derive construction engineering tasks on temporary work at the design phase of the high-rise building projects. 27 preliminary tasks were firstly investigated through literature review and experts' group interview, and the necessity and importance analysis of each tasks were then performed based on questionnaire survey. Most of the tasks related to plans on structural framework and lifting equipment were analyzed as relatively more important ones. Lastly, 21 engineering tasks, which are classified into 5 factors, were proposed through factor analysis. The factors were determined as 1) structural framework, measurement and circulation, 2) lifting equipment and pumping, 3) space zoning, 4) water supply, 5) temporary facility, electric power supply and lighting. The results of this study can be used as basic data for establishing efficient work process of construction engineering on temporary work at the design phase.

The Planning of Temporary Housing for Post Application of Mega Sports Facilities - Focused on the 2018 Winter Olympics - (메가스포츠시설의 사후 활용을 위한 임시주거 계획 - 2018평창동계올림픽을 중심으로 -)

  • Lee, Jong-Chan;Kang, Youn-Do;Kim, Byung-Sean
    • KIEAE Journal
    • /
    • v.16 no.4
    • /
    • pp.41-46
    • /
    • 2016
  • Purpose: This is a study on the planning of temporary housing for post application of Mega Sports facilities. The subject of the study is 2018 Pyeongchang Winter Olympics, which is to suggest building an alternative temporary housing using shipping containers(high cube), which solve the lack of accommodations and recycle temporary housing after Olympics, save money and be eco-friendly in Olympics. Method: This study includes this ; research on the a fact-finding survey about Mega sports facilities post application and demand survey on 2018 Pyeongchang Winter Olympics accomodations and an analysis about temporary housing plan. Furthermore we decided temporary housing building plan by analyzing residents' needs and traits of the housing etc. Through this, we made a schematic design for household units. Result: As a result, this study is a plan of making space, forms, and structure. The planned size is $38.4m^2$(L:12m, W:3.2m) except balcony, and indoor height is 2.5m. The space consists of entrance, bathroom, bedroom and living room with folding furniture system. Also there's a detailed floor plan of the ceiling, wall, and floor we drew up. The ceiling and wall consist of dampproof film, noncombustible board, fire proof urethane form, and color-designed sheet. The floor is composed of floor tile, cement mortar, light concrete(with heat coil), insulation, and dampproof film. Additionally, this study is a plan of interior dry wall with detail using modular construction method for work efficiency and quality improvement.

A Study on the Plan for the Recycled Use of Temporary Housing applied 3R Concept (3R 개념을 적용한 임시주거의 재사용 활용방안에 관한 연구)

  • Kim, Eun-Young;Wang, Woo-Chul;Lim, Seok-Ho;Hwang, Eun-Kyoung
    • Journal of the Korean housing association
    • /
    • v.26 no.5
    • /
    • pp.1-8
    • /
    • 2015
  • In South Korea, a certain number of temporary housings are pre-produced and stored in a warehouse, which are later relocated and installed in the areas damaged by disasters. Through the supply of temporary housings upon the occurrence of a disaster, disaster victims are able to rapidly go back to their everyday lives, and the social confusion formed after the occurrence of a disaster is reduced. Although temporary housings can be used for various purposes, they are currently being used only for helping disaster victims and are thus facing the difficulty of continuing technology development due to their low marketability. To increase the use of temporary housings, this study was conducted to formulate a plan for the recycled use of temporary housings in non-disaster situations. This study intended to open wide the possibility of operating temporary housings regardless of the type, period, and scale of the disaster, and to propose a plan for the reuse of temporary housings in non-disaster situations.

A Study on Analysis of Causes for Fatal Accidents (사망재해의 원인분석에 관한 연구)

  • 백종배;민경일;이영섭
    • Journal of the Korean Society of Safety
    • /
    • v.5 no.3
    • /
    • pp.56-62
    • /
    • 1990
  • This study is conducted to analyze exact causes of occupational fatalities and results are as follows : 1) The number of fatalities in establislment which employed less than 50 workers is 605(40.1% ). Age of sixties and seventies is occupied by 10 percent with there being old-aged trend. Fatal workers who were employed less than 3 months are 39.5 percent and fatal workers who were employed more than 10 years are 11.9 percent. Safety training is necessary for newly recruited and long employed workers. 2) Accident type is, in sequence, fall from elevation, traffic accident, disease, contact with electric current, and hazardous condition is, in order, inadequate guard, hazardous method or procedure, public hazard, and agency of accident is, in sequence, temporary structure/building/structure, powered transport vehicle, passenger vehicle, hoisting or lifting apparatus, and unsafe act is, in order, driving error, failure to secure or warn. 3) The results of cross-tabulation for hazardous condition and accident type is, in sequence, traffic accident by public hazard, fall from elevation by hazardous method or procedure, fall from elevation as well as contact with elctric current by inadequate guard. The result of cross-tabulation for agency of accident and accident type is, in order, fall from elevation by temporary structure/building/structure, traffic accident of passenger vehicle and powered transport vehicle, contact with electric apparatus. The result of cross-tabulation for agency of accident and hazardous condition is, in sequence, public hazard of passenger vehicle, hazardous method or procedure of temporary structure/building/structure, publit hazard of powered transport vehicle, inadequate guard of temporary structure/building/structure. The result of cross-tabulation for unsafe act and accident type is, in sequence, traffic accident by driving error, fall from elevation by inattention to footing or surrounding, contact with electric current by secure or warn.

  • PDF