Browse > Article
http://dx.doi.org/10.5345/JKIBC.2017.17.5.453

Identifying Construction Engineering Tasks at the Design Phase for Enhancing Constructability in High-rise Building Construction - Focused on Temporary Work -  

Lee, Jin-Woong (Graduate School, Chosun University)
Cho, Kyu-Man (School of Architecture, Chosun University)
Kim, Tae-Hoon (School of Architecture, Chosun University)
Publication Information
Journal of the Korea Institute of Building Construction / v.17, no.5, 2017 , pp. 453-463 More about this Journal
Abstract
Due to the increase in the size of buildings and scale, the importance of construction engineering that reflects the constructability from the design stage of the project is increasing. Especially, engineering efforts related to facilities, equipment and construction methods for temporary work at the design stage can significantly contribute to improvement of constructability and project performance. The purpose of this study is to derive construction engineering tasks on temporary work at the design phase of the high-rise building projects. 27 preliminary tasks were firstly investigated through literature review and experts' group interview, and the necessity and importance analysis of each tasks were then performed based on questionnaire survey. Most of the tasks related to plans on structural framework and lifting equipment were analyzed as relatively more important ones. Lastly, 21 engineering tasks, which are classified into 5 factors, were proposed through factor analysis. The factors were determined as 1) structural framework, measurement and circulation, 2) lifting equipment and pumping, 3) space zoning, 4) water supply, 5) temporary facility, electric power supply and lighting. The results of this study can be used as basic data for establishing efficient work process of construction engineering on temporary work at the design phase.
Keywords
construction engineering; temporary work; high-rise building construction; constructability; design phase;
Citations & Related Records
Times Cited By KSCI : 10  (Citation Analysis)
연도 인용수 순위
1 Kim MH. Management and organization of the building construction. Seoul(Korea): Kimoondang; 2006. 425 p. Korean.
2 Pulaski MH, Horman MJ. Organizing constructability knowledge for design. Journal of Construction Engineering and Management. 2005 Aug;131(8):911-9.   DOI
3 Arditi D, Elhassan A, Toklu YC. Constructability analysis in the design firm. Journal of Construction Engineering and Management. 2002 Apr;128(2):117-26.   DOI
4 Peurifoy RL, Oberlender GD. Formwork for Concrete Structures. 4th ed. United Stated of America: McGraw-Hill; 2011. p. 35-132.
5 Fischer M, Tatum CB. Characteristic of design-relevant constructability knowledge. Journal of Construction Engineering and Management. 1997 Sep;123(3):253-60.   DOI
6 Othman AAE. Improving building performance through Integrating constructability in the design process. Organization, Technology and Management in Construction. 2011 Feb;3(2):333-47.
7 Lam PTI, Wong FWH, Chan APC. Contributions of designers to improving buildability and constructability. Design Studies. 2006 Jul;27(4):457-79.   DOI
8 Fisher DJ, Anderson SD, Rahman SP. Integration constructability tools into constructability review process. Journal of Construction Engineering and Management. 2000 Mar/Apr;126(2):89-96.   DOI
9 Oh JW, Song KR, Ahn YS. A study on the application of constructability in construction project process. Journal of The Architectural Institute of Korea Structure & Construction. 2002 Dec;18(12):157-64.
10 Park M, Ham Y, Lee HS, Kim WY. Development of design process management model using dependency structure matrix for constructability. Korean Journal of Construction Engineering and Management. 2010 Sep;11(5):65-74.   DOI
11 Yoon H, Kim YS. Analysis of constructability factors affecting on the productivity of tall building construction : with focus on the area of steel work. Korean Journal of Construction Engineering and management. 2014 Jul;15(4):30-8.   DOI
12 Kim DS, Choi HM, Kim JH. A proposal BIM work process to support construct-ability analysis from practitioners viewpoint. Journal of The Korea Institute of Building Construction. 2014 Oct;14(6):561-9.   DOI
13 Park JS, Hyun CT, Hong TH, Park SH, Moon HS. Development of checklist for improving constructability in steel structure construction. Journal of The Architectural Institute of Korea Structure & Construction. 2009 Dec;25(12):197-206.
14 Jang JS, Park SH, Lee DH, Song SH, Choi MS, Lee JK. Method of construction stability for the curved concrete pylon of cable stayed bridge by the construction engineering. Proceeding of the Korea Concrete Institute Conference; 2016 May 11; Yeosu, Korea. Seoul (Korea): Korea Concrete Institute; 2016. p. 691-2.
15 Son Y, Hong HS, Paik H, Cho N. Construction engineering of the 3rd bosphorus bridge. Journal of The Korean Society of Civil Engineering. 2016 Oct;64(10):74-8.
16 Kim SI, Lee GJ, Yang GJ, Kim KS. Review on the behavior and construction method changing of steel composite stayed-cable bridge by the construction engineering. Korea Society of Steel Construction article. 2009 Sep;21(5):35-43.
17 Shon YJ, Jang KS. Understanding temporary work engineering. The Korean Structure Engineers Association. 2008 Sep;15(3):80-5.
18 Ahn BJ, Kim JJ, Kim K, Kim SG. A study on the optimization of site layout in the high-rise building construction. Journal of The Architectural Institute of Korea Structure & Construction. 1999 Dec; 15(12):107-18.
19 Lee JW, Cho K, Kim T. Basic research on applying temporary work engineering at the design phase. International Journal of Civil, Environmental, Structural, Construction and Architectural Engineering. 2017 Feb;11(2):214-7.
20 Lee JS, Kwon W, Chun JY. Web-based knowledge database of temporary facility site-layout planning for high-rise buildings. Proceeding of the Architectural Institute of Korea Conference; 2003 Apr 12; Samcheok, Korea. Seoul (Korea): Architectural Institute of Korea; 2003. p. 427-30.
21 Kim T. Advanced system formwork and construction planning model for tall building construction [dissertation]. [Seoul (Korea)]: Korea University; 2013. 1-3 p.
22 Jung YC. Lee BY, Kim GH. Application possibility of folding pre-fabricated rebar cage in domestic construction fields. Journal of the Korea Institute of Building Construction. 2010 Apr;10(2):125-32.   DOI
23 Kim MS. A study on the planning for construction of high-rise building project [dissertation]. [Busan (Korea)]: Pukyong National University; 2010. 70 p.
24 Ahn BJ. A decision-making model of integrated vertical and horizontal move plan for finishing material in tall building construction [dissertation]. [Seoul (Korea)]: Hanyang University; 2004. 190 p.
25 Park MS, Ha SB, Lee HS, Kim SY. An optimization model of temporary lift’s vertical zoning for worker lifting operation in the high-rise building construction. Journal of The Architectural Institute of Korea Structure & Construction. 2011 Nov;27(11):193-202.
26 Sho KH, Jung DW, Yang KY. A study on the survey method for compensation of column shortening in high-rise building construction. Journal of The Architectural Institute of Korea (Structure & Construction section). 2003 May;19(5):169-76.
27 Ahn BJ, Kim JJ, Jee N. Planning an optimized horizontal move for finishing material in high-rise building construction. Journal of The Architectural Institute of Korea Structure & Construction. 2001 Aug;17(8):119-30.
28 Lim YJ, Yun JI, Joung EI, Lee SJ. A study on the emergency exitways in super high-rise buildings. Proceeding of the Architectural Institute of Korea Conference; 2007 Oct 26; Chungju, Korea. Seoul (Korea): Architectural Institute of Korea; 2007. p. 355-8.
29 Choi GL, Kang SJ. Disaster prevention plan during the construction of super high-rise buildings. Journal of the Korea Institute of Building Construction. 2003 Jun;3(2):50-5.   DOI
30 Lee JH. A study on the design of heating and cooling system in super high-rise building [dissertation]. [Seoul (Korea)]: Chung-Ang University; 2013. 69 p.
31 Cho JK, Jeong CS, Kim BS. The energy conservational HVAC system design approaches of the large-scale buildings. Journal of The Architectural Institute of Korea (Planning & Design section). 2008 Jun;24(6):347-54.
32 Cho CS. Water supply system planning of high-rise building. Korean Association of Air Conditioning Refrigerating and Sanitary Engineers. 2005 Jan; 22(1):36-41.
33 Chun BJ. A study on development of fire protection system in super high rise building [dissertation]. [Suwon (Korea)]: Kyonggi University; 2009. 58 p.
34 Kim WP. Basic Statical Analysis. Seoul(Korea): WiseIN Company; 2017. 328-74 p.
35 Jung CY, Kim JJ, Jung YG. Recycling factor analysis on wood wastes in the construction site by classification origination reason. Korean Journal of Construction Engineering and management. 2007 Feb;8(1):107-15.
36 Chen Y, Okudan GE, Riley DR. Sustainable performance criteria for construction method selection in soncrete buildings. Automation in Construction. 2010 Mar;19(2):235-44.   DOI
37 Lee HS, Lim JH. Statistical package for the social sciences SPSS 12.0 manual. Paju(Korea): Bobmunsa; 2005. Chapter 14, Factor analysis; p.338-64
38 Song JH. SPSS/AMOS Statistic analysis method. 2nd ed. Paju(Korea): 21CBOOK; c2013. Chapter 7, Factor analysis; p.61-114.