• 제목/요약/키워드: Technique of design and construction

Search Result 700, Processing Time 0.029 seconds

Test Construction of the Paved Track at Subway Main Line (도시철도 본선 토공구간에서의 포장궤도 시험부설)

  • Lee, Il-Wha;Kang, Yun-Suk;Kong, Sun-Yong;Kim, Sang-Jin;Lee, Shun-Gu;Jung, Yun-Sik
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1689-1694
    • /
    • 2008
  • Recently, the development of the paved track is required as a low-maintenance of conventional line. The main reason is that the line capacity and bearing of track are increased progressively. The important factors of paved track are stability and applicability. To be based on this subject, cement mortar pouring type paved track is developed. The paved track is a kind of concrete track using the prepacked concrete technique. The most important thing to design the paved track is to optimize the track structure and materials considering various conditions. Until now, the paved track is verified a various material and structure test. In this paper, it is introduce to the test construction at the urban subway main line. The test construction is completed at Dec. 2007. A major object and substance is a guarantee of construction progress on main line, track performance, construction technique for curved section, transition zone and winter season, recycling the used ballast and application of specific sleeper for sharp curved section.

  • PDF

The contribution of column optimization on the embodied energy performance of concrete framed buildings

  • Miller, Dane;Doh, Jeung-Hwan;Ho, Nhat Minh;Peters, Tim
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.564-567
    • /
    • 2015
  • The incorporation of sustainability principles into the structural engineering design of buildings is increasingly important. Historically the focus of improvements to the environmental performance of structures has been operational energy considerations. Current research has highlighted the requirement for changing the approach by increasing the consideration of embodied energy in structures. This research was conducted to build on previous research by the authors in quantifying the contribution of column optimization to the embodied energy performance of concrete framed buildings. Ultimately, the authors intend to develop mechanisms through which sustainable design can be quantified, enabling alleviation prior to construction. Columns are a key structural element to consider as part of this development process. The outcomes of this assessment reinforced previous findings, observing that reduced structural weight as a result of other sustainable design measures carries manifold benefits include column design savings. Through the quantification of the embodied energy outcomes during this research phase, the columns were shown to contribute up to 19.71% of the total embodied energy of the structural system dependent upon construction technique used.

  • PDF

Developing intranet hypermedia system using scenario-based object- oriented technique (시나리오 기반 객체 지향 기법을 이용한 인트라넷 하이퍼미디어 시스템 개발)

  • 이희석;유천수;이충석;김영환;김종호;조선형
    • Korean Management Science Review
    • /
    • v.14 no.2
    • /
    • pp.113-137
    • /
    • 1997
  • Intranet emerges as a key technology for building enterprise information system. This paper proposes a scenario-based object- oriented technique for designing intranet hypermedia information systems. The method consists of six phases such as domain analysis, object modeling, view design, navigational design, implementation design and construction. Users requirements are analyzed in the form of scenarios by the use fo a responsibility-driven object technology. Object-oriented views are generated from the resulting object model and then used for the subsequent navigational and implementation design. Implementation design phase deals integrating enterprise databases with distributed hypermedia systems by employing Java language. To demonstrate its usefulness, a real-life bank case is illustrated.

  • PDF

INTEGRATION OF SSM AND IDEF TECHNIQUES FOR ANALYZING DOCUMENT MANAGEMENT PROCESSES

  • Vachara Peansupap;Udtaporn Theingkuen
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.725-731
    • /
    • 2009
  • Construction documents are recognized as an essential component for making a decision and supporting on construction processes. In construction, the management of project document is a complex process due to different factors such as document types, stakeholder involvement, document flow, and document flow processes. Therefore, inappropriate management of project documents can cause several impacts on construction work processes such as delay or poor quality of work. Several information and communication technologies (ICT) were proposed to overcome problems concerning document management practice in construction projects. However, the adoption of ICT may have some limitation on the compatibility of specific document workflow. Lack of understanding on designing document system may cause many problems during the use and implementation phase. Thus, this paper proposes the framework that integrates Soft System Methodology (SSM) concept and Integrated Definition Modeling Technique (IDEF) for analyzing document management system in construction project. Research methodology is classified as the case study. Five main construction building projects are selected as case studies. The qualitative data related to problems and processes are collected by interviewing construction project participants such as main contractors, owners, consultants, and designers. The findings from case study show the benefits of using SSM and IDEF. The use of SSM can help identify the problems in managing construction document in rich picture view whereas IDEF can illustrate the document flow in construction project in details. In addition, the idea of integrating these two concepts can be used to identify the root causes of process problems at the information level. As the results, this idea can be applied to analyze and design web-based document management system in the future.

  • PDF

A Study on Improvement of Nuclear Power Plant Construction System According to Data-centric Design Technique Introduction in Korea (데이터 기반 설계기법 도입에 따른 원전 건설관리체계 개선방향 고찰)

  • Lim, ByungKi;Byon, Sujin
    • Journal of Energy Engineering
    • /
    • v.25 no.1
    • /
    • pp.108-112
    • /
    • 2016
  • This study is established the data-centric design concept, which is the latest design technique, by analyzing existing study literature for its application on the nuclear power plant industry in Korea. This study investigated the data-centric design cases in the advanced companies and suggests a data-centric design integrated system framework by analyzing the major functions of the commercial 3D CAD system, which is globally used in the plant architect engineering. In order to apply the data-centric design integrated system framework to the nuclear power plant industry in Korea, the main functions of a nuclear power plant design information integrated system framework, which can manage the design products of each EPC step and the related information in integrated way, is suggested by analyzing the supplier design, field design process and field design drawings, which have close relation with the plant Architect Engineering (A/E). It is expected that the result of this study would contribute in the dramatic enhancement in the job efficiency of nuclear power plant design process in Korea.

A Study on the architectural Idea of 'the natural Construction' of Frei Otto (프라이 오토의 '자연적 구조'의 건축적 이념에 관한 연구)

  • Lee, Ran-Pyo
    • Korean Institute of Interior Design Journal
    • /
    • v.15 no.5 s.58
    • /
    • pp.68-76
    • /
    • 2006
  • Frei Otto, who is called to be the father of the ecological architecture, has shaped a peculiar architectural form style. In distance from the formalistic persistence to the modernist form canon and the postmodern tendencies to the self-representation of architects, Frei Otto has taken a more fundamentalistic position. Through the interdisciplinary researches on the self-organizing processes in the nature and the technical world Frei Otto could reason with architects, engineers, biologists, historians and philosophers the principle and structure of the natural construction that is applicable to the morphological research and the architectural construction research. In the middle of his architectural and scientific works is the idea of 'the natural construction' situated, and the basic principle and instrument of this 'Die Prinzip der Selbstbildung, The Principle of Self-making'. Founding himself on this principle, Frei Otto seeks after the new architectural form that is light, natural, flexible and variable by reasoning the typical formation process which refers to the common denominator of the self-making processes in the nature, the technique and the architecture. Despite his architecture is to be called to the anonymous, his architectural vision is headed toward the rationalistic form in accord with the natural laws. This study is purposed to elucidate the constellation to which his scientific attempts belong and the theoretical and methodological foundations of his architecture of 'the natural construction'.

Development of HVAC System to Lower the Conveyance Energy and Building Height

  • Kim, Jung-Yup;Shin, Hyun-Joon
    • International Journal of Air-Conditioning and Refrigeration
    • /
    • v.13 no.1
    • /
    • pp.31-43
    • /
    • 2005
  • The new HVAC system is developed to lower the conveyance energy and building height using IAV(Increasing Air Volume) technique. IAV units which are equipped in each zone carry out air-conditioning and supply fresh air by induction of outdoor air in main duct. The design program which decides size of OAHU and IAV unit according to air conditioning load and fresh air demand of each zone is presented. The control system is developed to operate efficiently HVAC system and IAV unit, so that individual zone operation and well-deal with partial load and IAQ problem are possible. The new system is investigated in model building and makes more profit in conveyance energy. size of air conditioning facilities room and building height than VAV system. But in construction cost it is worse by about 15 percentage.

Estimation of Deepwater Design Wave Height on Southern Coast of Korean Peninsula by Empirical Simulation Technique (경험모의기법에 의한 남해안의 심해 설계파고 산정)

  • Suh, Kyung-Duck;Kim, Mun-Ki;Chun, Je-Ho
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.23 no.4
    • /
    • pp.265-275
    • /
    • 2011
  • Estimation of wave height is the most important factor in the design of coastal structures such as breakwaters. In the present study, typhoon wind distribution was constructed by applying the parametric model of Holland (1980), and numerical simulations on the typhoon-generated waves were carried out using the WAM. The typhoons which affected the southern coast of the Korean Peninsula and several hypothetical typhoons were selected to construct the training sets. Design wave heights were estimated using the empirical simulation technique for various return periods and wave directions. The estimated design wave heights were compared with those by the peaks-over-threshold method and the results of KORDI(2005).

A study on controller design based on safe Petri Net for discrite system control (비연속시스템제어를 위한 Safe Petri Net에 기초로한 제어기의 구성에 관한 연구)

  • 황창선;이재민
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1990.10a
    • /
    • pp.400-405
    • /
    • 1990
  • This paper deals with the design technique of the controller for the discrete system control using Extended Safe Petri Net which is deduced from Petri Net as its subclass with a specific constraint and which is introduced to develop the design and analysis for the discrete systems. First, we propose a construction matrix suitable for the discrete systems that represent the marking flows which are the dynamic behavior of the discrete systems. Next, we develop a method that can design the controller for the discrete system control by analyzing the proposed construction matrix into the incidence matrix of Extended Safe Petri Net. Finally, the validity of the proposed method is shown by using the incidence matrix and matrix equation of Extended Safe Petri Net model.

  • PDF

Development of Component Design Process for Automated Construction System (시공 자동화 시스템에 적합한 부재 디자인 프로세스 개발)

  • Jin, Il-Guan;Shin, Yoon-Seok;Cho, Hun-Hee;Kang, Kyung-In
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.76-86
    • /
    • 2009
  • Recently automated construction system is attended in construction domains because of the increase of aged workers and the shortage of the experienced. So, the proportion of automated construction in Korea is expected to be getting higher from partially automated robots to full automation systems. However, it is difficult for the automated system to operate flexibly like the human based on various work condition. In the result, the higher the level of automation in the system is, the less efficient the automated system work in the site. So, it's necessary the development component design to compensate for the flexibility shortage of the system. Therefore, this study proposes the development process to component design suitable for automated construction system using QFD technique.