Browse > Article

Development of Component Design Process for Automated Construction System  

Jin, Il-Guan (고려대학교 대학원 건축사회환경공학과)
Shin, Yoon-Seok (고려대학교 대학원 건축공학과)
Cho, Hun-Hee (고려대학교 건축사회환경공학과)
Kang, Kyung-In (고려대학교 건축사회환경공학과)
Publication Information
Korean Journal of Construction Engineering and Management / v.10, no.4, 2009 , pp. 76-86 More about this Journal
Abstract
Recently automated construction system is attended in construction domains because of the increase of aged workers and the shortage of the experienced. So, the proportion of automated construction in Korea is expected to be getting higher from partially automated robots to full automation systems. However, it is difficult for the automated system to operate flexibly like the human based on various work condition. In the result, the higher the level of automation in the system is, the less efficient the automated system work in the site. So, it's necessary the development component design to compensate for the flexibility shortage of the system. Therefore, this study proposes the development process to component design suitable for automated construction system using QFD technique.
Keywords
automatied construction system; component design for automation; Quality Function Deployment(QFD);
Citations & Related Records
Times Cited By KSCI : 7  (Citation Analysis)
연도 인용수 순위
1 한국생산기술연구원, 고기능 콘크리트 바닥 미장로봇의 개발(최종) 연구보고서, 건설교통부, 1998
2 김영석, 이정호, '공동주택 외벽 도장 자동화 로봇의 최적 개념 모델 제시 및 기술적.경제적 타당성 분석', 대한건축학회 논문집 22권 9호, 2006, pp. 139-150   ScienceOn
3 목학수, 하재우, 차동균, '조립자동화를 위한 제품설계 기술개발' 한국정밀공학회지 11권 1호, 1994, pp. 184-191   과학기술학회마을
4 유연택, 박상준, 이정호, 정명훈, 김영석, '흄관매설 자동화 장비의 성능분석을 위한 평가모델의 개발', 한국건설관리학회 논문집 5권 1호, 2004, pp. 157-167   과학기술학회마을   ScienceOn
5 이태식, 장경수, 구자경, 박경순, '터널 청소장비의 고찰 및 개선된 모델에 관한 연구', 한국건설관리학회 학술발표대회 논문집, 2006, pp. 669-673
6 장현승, 우성권, '건설공사의 자동화.기계화의 효과 및 확대 방안', 건설산업동향, 한국건설산업연구원, 2003
7 한재구, 김균태, 권순욱, '워터젯을 이용한 노면표시 제거장비의 성능평가에 관한 연구', 한국건설관리학회 논문집 제7권 6호, 2006, pp.79~89   과학기술학회마을   ScienceOn
8 Maeda, J., 'Development and application of the automated building construction system in Shimizu,' u-IT based construction automation, Korea University, 2006, pp.280-286
9 Scott Howe, A., 'Designing for automated construction', Automation in Construction Vol. 9, 2000, pp. 259-276   DOI   ScienceOn
10 Kurita, H., Tezuka, T., Takada, H., 'Robot Oriented Modular Construction System - Part II: Design and Logistics', Automation and Robotics in Construction, 1993, pp. 309-316
11 Shimizu, 'Shimizu Manufacturing system by Advanced Robotics Technology (SMART), in R&D product pamplet, Shimizu Tokyo, 1993
12 이정호, 김영석, 이준복, 정명훈, '크랙실링 자동화 장비의 개발 및 경제적 타당성 분석', 한국건설관리학회 논문집 7권 6호, 2006, pp 151-164   과학기술학회마을   ScienceOn
13 임현호, '안전성 및 생산성을 고려한 자동화 요구도 지수의 개발', 고려대학교 석사학위논문, 2008
14 Wakisaka, T., Furuya, N., Inoue, Y., Shiokawa, T., 'Automated construction system for high-rise reinforced concrete buildings', Automation in Construction Vol. 9, 2000, pp. 229-250   DOI   ScienceOn
15 이승열, 한창수, 이계영, 이상헌, '국내 건설 내/외장재 설치 로봇', 대한건축학회 논문집 23권 8호, 2007, pp. 201-212   ScienceOn
16 인재순, '휴대폰 배터리 개발을 위한 QFD 활용 연구', 한국산업경영시스템학회지 28권 3호, 2005, pp. 18-25   과학기술학회마을
17 심규범, '건설기능인력의 수급실태 및 대응방안', 건설산업동향, 한국건설산업연구원, 2002
18 신윤석, 진일권, 안성훈, 조훈희, 강경인, '양중작업 자동화를 위한 부재진동에 따른 타워크레인의 작업기능 기준 연구', 한국건설관리학회논문집 11권 2호, 2008, pp. 108-116   과학기술학회마을
19 Sacks, R., Warszawski, A., 'A project model for an automated building system : design and planning phases', Automation in Construction Vol. 7, 1997, pp.21-34   DOI   ScienceOn
20 Tanijiri, H., Ishiguro B., Arai, T., Yoshitake, R., Kato, M., Morishima, Y., Takasaki, N., 'Development of automated weather-unaffected building construction system', Automation in Construction Vol. 6, 1997, pp. 215-227   DOI   ScienceOn
21 김광재, 'QFD를 통한 설계단계에서의 품질향상', 대한산업공학회 IE매거진 2권 1호, 1995, pp. 16-21
22 서종원, 박창우, 장달실, '지능형 굴삭시스템 개발', 한국건설관리학회 학술발표대회 논문집, 2007, pp. 197-204
23 김영석, 김현철, 서정희, 오세욱, '국내 건설 산업의 건설 자동화 및 로보틱스 도입 방안에 관한 연구', 대한건축학회 논문집 17권2호, 2001, pp.111-120
24 Sulivan, L.P., 'Quality Function Development', Quality Progress, Vol. 19, No. 6, 1986, pp. 59-86