• Title/Summary/Keyword: TASK project

Search Result 482, Processing Time 0.028 seconds

A Study on the Design-Phase Checklist for Office Project Management (업무공간 프로젝트 매니지먼트의 디자인 단계 체크리스트 개발에 관한 연구)

  • Hwang, Hye-Jeong;Lyu, Ho-Chang
    • Korean Institute of Interior Design Journal
    • /
    • v.21 no.5
    • /
    • pp.208-216
    • /
    • 2012
  • The importance of applying project management in interior design has been increased due to recent changes in construction business environment along with market opening which demands more systematized and organized project management system. Yet, project management has not been utilized for interior design industry in Korea. This study intends to define the concept of project management in interior design, categorize tasks of each phase in office design project, and establish a table of elements which should be considered in each task. The table can be utilized as a checklist at the designing site. An in-depth analysis was conducted on the tasks in the Designing phase. In short, this study demonstrates five management phases and nine tasks. The differentiated checklist for office design is discussed in the project management of the Design phase. The checklist established in this study can be used as a practical guideline not only for the clients who are not familiar with management of design project, but also for existing project managers and interior designers. Further studies on management of design projects and development of checklist other than office design is needed.

  • PDF

A Structure Analysis on Relationship Between Small Group Characteristic Factors and Perceived Performance - In Case of the Village Development Committee in Saemaul Movement, Laos - (소집단의 특성요인과 성과인식에 관한 구조관계 분석 - 라오스 새마을운동에서의 마을개발위원회 사례 -)

  • Ko, Soonchul
    • Journal of Agricultural Extension & Community Development
    • /
    • v.26 no.2
    • /
    • pp.57-68
    • /
    • 2019
  • This paper was done as an exploratory study aiming to identify the relationship between small group characteristic factors and perceived performance in the Village Development Committee (VDC) in Saemaul Undong project in Laos. The data were gathered from 166 members in 17 VDCs in Vientian province, however 135 questionnaires were used in analysis. Structure Equation Model was applied in the analysis with Amos 21. The major finding of this study were as follows; firstly decision making was more influenced by task cohesion than social cohesion, secondly organizational citizen behavior was influenced by both task cohesion and social cohesion. However, social cohesion had more influence than task cohesion, thirdly the VDC members learned their technical knowledge from decision-making process, and influenced to their perceived performance level and to VDC sustainablity, and fourthly in overall, committee members implemented their jobs based on task-oriented.

Discriminant Analysis for the Prediction of Unlawful Company in Defense Procurement (국방조달에서 부정당업자 판별분석 모형 개발)

  • Han, Hong-Kyu;Choi, Seok-Cheol
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.14 no.3
    • /
    • pp.467-473
    • /
    • 2011
  • The contractor management for the effective defense project is essential factor in the modern defense acquisition task. The occurrence of unlawful company causes hastiness for project manager and setback to the deployment of defense weapon system. In this paper, we develop a prediction model for the effective defense project by using the discriminant analysis and analyse the variables that discriminate the unlawful company in many variables. It is expected that our model can be used to improve the project management capability of defense acquisition and contribute to the establishment of efficient procurement procedure through entry of the reliable defense manufacturer.

Relationship between the Development Levels of Learning Organization and Organization Effectiveness in Hospital (의료조직에서 학습조직 구축수준 평가 및 조직유효성과의 관계분석)

  • Lee, Sun Hee;Cho, Woo Hyun;Nam, Jong Hae
    • Health Policy and Management
    • /
    • v.15 no.3
    • /
    • pp.1-16
    • /
    • 2005
  • This study was planned to investigate the relationship between development levels of learning organization and organization effectiveness in Hospital. Data were collected from 285 respondents who have participated in 'Learning Organization Project'(response rate =$50.5\%$). Structured questionnaire were applied by self administrated survey for two weeks since 2003 May. Main results were as follows; In the result of factor analysis, four factor were created and almost questionnaire items were classified into as same categories as theoretical concepts. Cronbach's a coefficient also showed over 0.7 in all categories. This result means that measurement tool to evaluate the development level of learning organization is valid and reliable. In the comparison of the development level of learning organization by participants' specialties, managerial workers perceived the lowest construction level, while medical technicians evaluated it as the highest level. In regression analysis, the perception levels of work environment, task and human aspect showed positive relationship with job competency significantly. For job satisfaction, levels of task and human aspects had positive relationship significantly. In addition, for organizational commitement, levels of organization and human aspect were positive predictors. Finally, for the satisfaction about experience of learning organization project, levels of environment, task and hmm aspects were related positively. We concluded from these result that the positive relationship between construction levels of learning organization and organization effectiveness was extended to hospital, besides industrial fields. We recommend the introduction and facilitation of learning organization project in various settings to improve the competency of knowledge management in individual and organizational levels.

A Development of Task Generator through an Analysis of Task Location Information Structure (작업위치 정보체계 분석을 통한 작업정보 생성기 개발)

  • Chin Sangyoon;Kang Woo-Young;Kim Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.64-71
    • /
    • 2004
  • A daily report is one of the critical documents in construction projects, since it helps them keep track of various as-built information. Despite the important role in progress management, the daily reporting process is time-consuming, and the representation of task information on daily reports are not effective enough to accumulate daily as-built information for further use in project management. Task information is composed of a specific work type and a location where the task is performed, which means that the same type of work is repeated over the locations. However, in many cases the task locations are described differently depending on a reporter's preference or experience. Without representing task location information effectively, it is difficult to accumulate and to reuse as-built information. The objective of this research is to build a framework for generating task information which can be efficiently accumulated and reused for progress management. To do so, this research built a task information model with focusing on the representation of task location associated with a work type, and developed an information system that supports automated and interactive generation of task information.

Development of Collaboration and Communication Platform based on Contents for an Efficient Task Management in Construction Project (건설 프로젝트 업무관리 효율화를 위한 콘텐츠기반 협업 플랫폼 개발)

  • Kim, Seong-Ah;Jung, Choong-Won;Kim, Nam-Ho;Choi, Cheol-Ho;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.98-107
    • /
    • 2016
  • An information system in a construction project has been typically used for drawing, document management, and administration process. And it has limitations to support real-time communication and collaboration among project stakeholders. The objective of this research is to improve communication, information share, and task management by developing a collaboration platform among project stakeholders supporting various communication methods and contents. The platform developed in this research, named as CCP, aims to support communication and collaboration related activities beyond the scope of legacy systems at construction sites. CCP was validated through pilot test and user survey, and it was found to be very helpful for sharing and distributing information, tracking and recording, and improving a user's work capability.

An Evaluation Model for the Expected Value of the Construction Project Management Information System (건설관리 업무의 정보시스템화 기대가치 평가 모델)

  • Hwang In-Ae;Yoo Jung-Ho;Song Sang-Hoon;Yoo Won-Hee;Park Jong-Won;Kim Woo-Young;Lee Hyun-Soo;Choi Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.541-544
    • /
    • 2003
  • The Information System(IS) planning for construction project management must be performed through decomposing the construction management business process upon considering the information technology in a construction company. Following this background, this paper proposes a model for evaluating the expected value of IS planning for construction project management. The model is made to analyze the effectiveness and to evaluate the opportunity of IS planning for task and information, then finally to quantify the value. Lastly, this model can be used to plan IS for construction project management.

  • PDF

Ontology-based Safety Risk Interactions Analysis for Supporting Pre-task Planning

  • Tran, Si Van-Tien;Lee, Doyeop;Pham, Trang Kieu;Khan, Numan;Park, Chansik
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.96-102
    • /
    • 2020
  • The construction industry remains serious accidents, injuries, and fatalities due to it's unique, dynamic, and temporary nature. On workplace sites, Safety pre-task planning is one of the efforts to minimize injuries and help construction personnel to identify potential hazards. However, the working conditions are complicated. Many activities, including tasks or job steps, are executing at the same time and place. It may lead to an increase in the risks from simultaneous tasks. This paper contributes to addressing this issue by introducing a safety risk interaction analyzing framework. To accomplish this objective, accident reports of the Occupational Safety and Health Administration (OSHA) are investigated. The pairs of task incompatibility, which have time-space conflicts and lead to incidents, are found. Ontology technology is applied to build the risk database, in which the information is acquired, structuralized. The proposed system is expected to improve pre-task planning efficiency and relieve the burdens encountered by safety managers. A user scenario is also discussed to demonstrate how the ontology supports pre-task planning in practice.

  • PDF

A Study on the Project Based Learning cognitive in the Technical high school (전문계 고등학교에서의 프로젝트 학습 인식에 관한 연구)

  • Nam, Jeong-Kwun;Cho, Hyung-Jung
    • 대한공업교육학회지
    • /
    • v.36 no.2
    • /
    • pp.273-292
    • /
    • 2011
  • The Purpose of this research is to investigate how Project Based Learning(PBL) cognitive department and among the learner and instructor in the industrial highschool. Theoretical framework for the study is based on PBL, collaborative learning and module learning. The importance of the PBL has been continuously reviewed by many educational researchers. In addition, it was supported by previous research results. Based on theoretical frameworks and previous researches on the PBL provided design principles and method for learning in the industrial highschool. As a result of this study, we have developed and applied to investigate (1) differences between the types of departments(agriculture, industry, commerce) of cognition on learner's and instructor's task solving process, (2) correlation between the type of groups(learner, instructor) and type of departments(agriculture, industry, commerce) cognition on task solving process. The total of 100 learners and 50 instructors from industrial highschool in the study for the period of sixteen weeks. Based on the type of groups and departments, participants were divided into six groups such as learner and instructor of agriculture, industry, commerce department. The result of the study can be summarized as follows: First, in the study, between the types of departments(agriculture, industry, commerce) of cognition on learner's and instructor's task solving process are differences. Second, correlation between the type of groups(learner, instructor) and type of departments(agriculture, industry, commerce) of cognition on task solving process are differences. Although the differences were insignificant for cognition of PBL's help, however, four items(accomplishment, application subject, hereafter application) showed significant differences in performances. The implication of the result indicated the cognition of PBL in the industrial highschool seem significant for departments and subjects characteristic of learning. In future research it is recommended that PBL model designs should consider components of group and department types.

A Study on Factors Related to the Conflict in IT Project Teams

  • Cho, Nam-Jae;Park, Sang-Hee;Kim, Nan-Hwa;Keum, Jung-Won
    • Journal of Digital Convergence
    • /
    • v.7 no.1
    • /
    • pp.111-123
    • /
    • 2009
  • IT projects need engineers with various backgrounds to cooperate to build an IT system that satisfy the requirements of users given a limited expense and time. Such diversity of team members and the complexity of task naturally involve considerable amount of conflict among team members. High level of conflict among team members is known to be detrimental to the performance of the team. The purpose of this study is to examine the reasons for conflicts among team members in IT projects and to check how the level of conflict affects the performance of a project and the satisfaction of the members of the project team. To test the relationship, a survey on 166 participants in IT projects was conducted. The reasons for conflicts in IT projects were categorized into five types. The level of ambiguity was found to have a significant correlation with the level of conflict. And the level of conflict, in turn, is found to have a significant effect on the degree of satisfaction among team members and the project results. Based on the research results, it is suggested that a clear definition of tasks and their boundaries is required to reduce ambiguity and thus, the level of conflict and improve the level of satisfaction of IT project team members.

  • PDF