• Title/Summary/Keyword: TASK project

Search Result 482, Processing Time 0.028 seconds

PROJECT MANAGEMENT FOR ENERGY MANAGEMENT SYSTEMS (에너지 관리(管理)시스템의 사업관리(事業管理))

  • Lee, Kyu-Sun;Yoon, Kap-Koo
    • Proceedings of the KIEE Conference
    • /
    • 1983.07a
    • /
    • pp.174-176
    • /
    • 1983
  • This paper explains about general considerations and project management for a modern electric utility EMS/SCADA system. This paper also attempts to help engineers in the following situation: They are given the task of specifying, buying and installing a EMS/SCADA system. When do they start? What tools/texts/guidelines are available to help them out? If it is a large system, methodical project management is necessary. What are the critical tasks to be undertaken? When should they been done and how does their timing impact the whole project.

  • PDF

건설 프로젝트 공정표 생성을 위한 사례기반 전문가시스템의 설계

  • 김현우;이경전;이재규
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.709-712
    • /
    • 1996
  • Generating a project network of a specific construction project is very time consuming and difficult task in the field. To effectiviely automate and support the planning process, we design a case-based project planning expert system inspired by the fact a human expert project planner uses previous cases for planning a new project. A construction project case consist of its specific characteristics and the corresponding project network (i.e. project plan). Using frame based representation. we represent the project features affecting the progress network and the entities composing the project plan such as the buildings, construction methods, WBS (work breakdown structure), activities, and resources. The project planning process runs through most similar case retrieval, case adaptation, and user requirement satisfaction. We represent the construction domain knowledge for each procedure using constraints and rules. We develop the methodology for constraint-based case adaption. Case adaptation process mainly consist of activity generation/deletion and predecence constraint satisfaction, for which we develop the dynamic constraint generation method and connect user-level requirement representation the system-level network modification knowledge. The methodology is being applied to the prototype for apartment construction project planning.

  • PDF

Evaluation System for Defense IT Project in Korea: Post-Implementation Stage

  • Lee, Sangho;Song, Chong-Hyun
    • Journal of Multimedia Information System
    • /
    • v.5 no.4
    • /
    • pp.291-297
    • /
    • 2018
  • Performance measurement is not an easy task. However, it is necessary to measure the expected value of the informatization project to be invested, to help the successful progress of the informatization project, and to confirm the result of the informatization project. This study describes the evaluation systems of the defense informatization project in Korea used after the end of the informatization project (post-implementation evaluation stage). In the post-implementation evaluation stage of proposed system, the informatization project is evaluated in terms of performance achievement, project plan compliance, project management, and economic validity. For each element, this study suggests metrics and practical measurement method. With metrics and their method, it can be evaluated which project is better than others. Moreover, the lessons learned can be developed. Under scarce budget condition, defense organizations can make better performance from IT project with the evaluation system suggested in this study.

Study on the Improvement of Proposal Works for PPP Project: Focused on Operation and Maintenance Cost (민간투자사업의 제안서 작성 업무 개선에 관한 연구 - 운영관리비 산정 업무를 중심으로 -)

  • Koo, Ja Kyung;Lee, Dong Wook;Shim, Myung Seob;Lee, Tai Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.6D
    • /
    • pp.655-662
    • /
    • 2010
  • As the national competitive power indicator, the infrastructures have been constructed with government's SOC budgets. However, even SOC budget is decreased, Public-Private Partnership Project (PPP project) has been introduced to solve demands on extending infrastructures, and among PPP projects, road projects take high portions. This study analyzes the operation & management item of financial model which is connected to the O&M cost and project proposal of previously proposed road project and analyzes the Korea Expressway Co.,'s project cost items and O&M tasks to reflect the characteristics of road projects. Based on results, this study suggests necessity of the O&M cost breakdown structure and the cost calculation standard on each cost item. Also, for the existing task execution tools, O&M cost calculation tool and finance analysis task tool will be integrated, and the system is suggested web-based system. Thus, it is expected that it contributes to the securing overall business values on PPP project and expending profit-base infrastructures.

Design and Implementation of a Project Work Unit-based Scheduling Application (프로젝트 작업 단위 기반 일정 관리 애플리케이션의 설계 및 구현)

  • Bomin Kim;Minyoung Kim
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.6
    • /
    • pp.1173-1178
    • /
    • 2023
  • In modern society, there is a tendency to emphasize efficiency and lead to detailed planning of team projects and individual tasks within organizations. In a 24-hour routine, the ability to use time effectively is considered an indicator of conscientiousness, and people try to imitate planned and organized people and utilize various systems to manage their daily lives. The reason why you want to perform a given task efficiently is because it affects the success or failure of the project by completing the task within a set period of time. Neglecting the project schedule is considered a major risk that threatens a successful outcome. This applies not only to large-scale organizational projects but also to individual life, and utilizes a variety of schedule management tools that emphasize time-based efficient management. In project management, it is necessary to carefully understand the detailed work progress rather than simply based on Today. In this paper, we propose an Android application that can manage schedules by accessing the user's project in units of tasks rather than dates, and introduce its implementation. The application we implemented in this paper can manage the project's goals and schedule by registering the project to which the user belongs. In addition, it provides the ability to approach work efficiently by visualizing the progress of the entire project or individual goals. As a result, users can use the application we propose in this paper to focus on their projects and manage schedules by task, thereby improving the overall efficiency of the project.

Productivity Analysis of Spray Task in an International Airport

  • Kisi, Krishna P.;Kayastha, Rujan
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.632-639
    • /
    • 2022
  • The objective of this study is to analyze the productivity, efficiency, and factors affecting the productivity of a spray task from an international airport project. The study is focused on the productivity analysis of the Subcontractor whose job was to supply and apply sprayed-applied fire-resistive material (SFRM) on steel members to achieve the necessary fire ratings on the building structures of the Hamad International Airport, Qatar. The study analyzed the productivity of the four sprayer teams who completed the task at three locations and three areas of the airport. The study found that the productivity of the individual team observed during the SFRM spray task was not only different but was also observed different when they worked at varying floor heights where different factors affecting productivity were predominant. The study found that the efficiency was lowest (47.32%) when the spray team had to work at second-floor heights and factors affecting productivity such as limited accessibility for material movement and lifting, site congestion, lack of continuity of operation due to priority areas and frequent re-handling of machines and tools were present. Besides, the factors such as adverse weather conditions and sub-trades interference affected productivity at all locations. The findings show that productivity depends on multiple factors and those factors need to be identified and addressed to improve productivity. The findings also show that the estimated efficiency was hard to achieve but possible since Team 4 had 97% efficiency on the first floor of the airport.

  • PDF

Social Interdependence and Knowledge Sharing: The Case of IT Projects (사회적 상호의존성과 지식공유: IT프로젝트의 사례)

  • Park, Jun-Gi;Lee, Seyoon;Lee, Jungwoo
    • Information Systems Review
    • /
    • v.16 no.3
    • /
    • pp.25-47
    • /
    • 2014
  • IT project is a knowledge-based project with high uncertainty in role assignment and task allocationamong team members. This study empirically investigate steam members' interactive behavior in IT projects based on the framework of social interdependence theory. The goal and task interdependencebetween team members were posited as antecedents of project performance with communication effectiveness and knowledge sharing as mediating variables. To test the research model, a dataset was collected form IT and business professional pairs of 123 IT project teams. The results indicated that the theory of social interdependence is applicable to explaining the promotive interaction in IT project teams. In detail, task interdependence appears to have influence on both promotive interactions (communication effectiveness and knowledge sharing), and goal interdependence influences only on communication effectiveness. Knowledge sharing is found to be a significant mediator between social interdependence and project performance. However, communication effectiveness only indirectly influences project performance via knowledge sharing. Academic and practical implications are discussed.

Project Management : Simplifying or Exacerbating (프로젝트를 위한 프로젝트 관리의 역할)

  • Qureshi, Sheheryar Mohsin;Kang, Chang Wook
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.37 no.2
    • /
    • pp.9-18
    • /
    • 2014
  • The purpose of this research is to initiate discussion to simplify existing tools and methods for managing projects which make project management a harder job to perform and a tougher task to handle. Additionally, summarizing the definitions of "project" that have been found from reviewing the relevant literature, it deliberates on revising the duties and responsibilities of project manager and proposes performance expectancy triangle explaining a relationship among accountability, responsibility and authority - the Tri-butes. It sheds light on several factors critical to the success of projects. Finally, we propose a function indicating that customer demands or desires greatly affect project complexity.

Minimizing Project Quality Costs by Activity-Based Prevention (활동기준예방에 의한 프로젝트 품질코스트 최소화)

  • Kim, Jong-Yul;Kang, Chang-Wook;Hwang, In-Keuk
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.4
    • /
    • pp.89-97
    • /
    • 2011
  • Traditional quality control for manufacturing or service sector is not suitable for the quality control of a project as the project is one-time task constrained by time, cost, and quality. To meet the internal and external customers' requirements, quality costs approach to the project will be effective. Hence, we propose PONC (price of nonconformance) estimation procedure and a mathematical model, which are focused on activity-based prevention in the execution step and warranty step of EPLC (extended project life cycle). This procedure and model will help project manager develop preventive action plan for project quality costs minimization from nonconformance risk activities and PONC estimates information.