Minimizing Project Quality Costs by Activity-Based Prevention  

Kim, Jong-Yul (Dept. of Industrial Engineering, Hanyang University)
Kang, Chang-Wook (Dept. of Industrial and Management Engineering, ERICA Campus, Hanyang University)
Hwang, In-Keuk (Dept. of Industrial and Systems Engineering, Kongju National University)
Publication Information
Journal of Korean Society of Industrial and Systems Engineering / v.34, no.4, 2011 , pp. 89-97 More about this Journal
Abstract
Traditional quality control for manufacturing or service sector is not suitable for the quality control of a project as the project is one-time task constrained by time, cost, and quality. To meet the internal and external customers' requirements, quality costs approach to the project will be effective. Hence, we propose PONC (price of nonconformance) estimation procedure and a mathematical model, which are focused on activity-based prevention in the execution step and warranty step of EPLC (extended project life cycle). This procedure and model will help project manager develop preventive action plan for project quality costs minimization from nonconformance risk activities and PONC estimates information.
Keywords
Project Quality Costs; Activity-Based Prevention; Price of Nonconformance;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 Lamberson, L. R. and Hocking, R. R.; "Optimum time compression in project scheduling," Management Science, 16(10) : B597-B606, 1970.
2 Project Management Institute; "A Guide to the Project Management Body of Knowledge," 4th ed., PMI Publications, Pennsylvania, 2008.
3 Shenhar, A. J., Levy, O., and Dvir, D.; "Mapping the dimensions of project success," Project Management Journal, 28(2) : 5-13, 1997.
4 Siemens, N.; "A simple CPM time-cost tradeoff algorithm," Management Science, 17(6) : B354-B363, 1971.
5 Siemens, N. and Gooding, C.; "Reducing project duration at minimum cost : a time/cost trade-off algorithm," OMEGA, 3 : 569-581, 1975.
6 Wit, A. D.; "Measurement of project success," Project Management, 6(3) : 164-170, 1988.   DOI   ScienceOn
7 Kapur, K. C.; "An algorithm for the project cost/duration analysis problem with quadratic and convex cost functions," IIE Transactions, 5 : 314-322, 1973.
8 Kelley, J. E. and Walker, M. R.; "Critical Path Planning and Scheduling : An Introduction," Mauchly Associate, Ambler, PA, 1959.
9 Kelley, J. E.; "Critical-path planning and scheduling : mathematical basis," Operations Research, 9(3) : 296-320, 1961.   DOI   ScienceOn
10 Kendrick, T.; "Identifying and Managing Project Risk," AMACOM, New York, 2003.
11 Khang, D. and Myint, Y.; "Time, cost and quality tradeoff in project management: a case study," International Journal of Project Management, 17(4) : 249-256, 1999.   DOI   ScienceOn
12 Kim, J. Y., Kang, C. W., and Hwang, I. K.; "A Practical Approach to Project Scheduling : Considering the Potential Quality Loss Cost in the Time-Cost Tradeoff Problem," Published online of : International Journal of Project Management, 2011.
13 Elmaghraby, S. E. and Salem, A.; "Optimal linear approximation in project compression," IIE Transactions, 16(4) : 339-347, 1984.   DOI   ScienceOn
14 Koushki, P. A., Al-Rashid, K., and Kartam, N.; "Delays and cost increases in the construction of private residential projects in Kuwait," Construction Management and Economics, 23 : 285-294, 2005.   DOI   ScienceOn
15 Crosby, P. B.; "Quality Without Tears," Penguin Books, Ontario, 1984.
16 Dale, B. G. and Plunkett, J. J.; "Quality Costing," Chapman and Hill, London, 1995.
17 Feigenbaum, A. V.; "Total quality control," Harvard Business Review, 34(6) : 93-101, 1956.
18 Ford, L. R. and Fulkerson, D. R.; "Flows in net works," Princeton University Press, New Jersey, 1962.
19 Hall, M. and Tomkins, C.; "A Cost of Quality Analysis of a Building Project: towards a Complete Methodology for Design and Build," Construction Management and Economics, 19 : 727-740, 2001.   DOI   ScienceOn
20 Goyal, S. K.; "A note on simple CPM time-cost tradeoff algorithm," Management Science, 21(6) : 718-722, 1975.   DOI   ScienceOn
21 Juran, J. M. and Gryna, F. M.; "Quality Planningand Analysis," McGraw-Hill, 2nd ed., 1980.
22 김종열, 강창욱, 황인극; "클레임코스트를 고려한 프로젝트의 시간-비용 혼합정수계획모형", 한국산업경영시스템학회지, 34(3) : 77-85, 2011.
23 Abdelsalam, H. M. E. and Gad, M. M.; "Cost of quality in Dubai : An analytical case study of residential construction projects," International Journal of Project Management, 27 : 501-511, 2009.   DOI   ScienceOn
24 Avots, I.; "Information systems for matrix organisations in Cleveland David," 1st ed., Matrix management systems handbook Van Nostrand Reinhold, New York, 1984.
25 Babu, A. J. G. and Suresh, N.; "Project Management with Time, Cost, and Quality Considerations," European Journal of Operational Research, 88 : 320-327, 1996.   DOI   ScienceOn
26 Barnes, N. M. L. and Wearne, S. H.; "The future for major project management," International Journal of Project Management, 11(3) : 135-142, 1993.   DOI   ScienceOn
27 Crosby, P. B.; "Quality Is Free," McGraw-Hill, New York, 1979.
28 Burke, R.; "Project Management Planning and Control, Stratford Upon Avon," Management Press, 1995.
29 Cervone, H. F.; "Project risk management," OCLC Systems and Services : International Digital Library Perspectives, 22(4) : 256-262, 2006.   DOI   ScienceOn
30 Cnuddle, M.; "Lack of quality in construction economic losses," in Proceddings of 1991 European Symposium on Management, Quality and Economics in Housing and other Building Sectors, 508-515, 1991.