• Title/Summary/Keyword: System Capacity

Search Result 8,716, Processing Time 0.039 seconds

Development of Adjustment Factors under Day and Night Conditions for Freeway Capacity to Improve Traffic Safety (교통안전 향상을 위한 주야 변화에 따른 고속도로 용량 보정계수 개발에 관한 연구)

  • Kim, Young Sun;Lee, Sang Soo
    • International Journal of Highway Engineering
    • /
    • v.17 no.4
    • /
    • pp.107-115
    • /
    • 2015
  • PURPOSES: This study analyzes the characteristics of traffic flow on freeway sections under daytime and nighttime conditions to improve traffic safety, and suggests a method to estimate an accurate freeway capacity value that reflects these characteristics. METHODS : The trends and differences in capacity were investigated using comprehensive field data collected under both daytime and nighttime conditions on freeway sections with designated speeds of 80, 100, and 120 kph. RESULTS : The capacity values under nighttime driving conditions were reduced by 3.3%, 6.9%, and 8.8% at 80, 100, and 120 kph, respectively. Several nighttime adjustment factors were deduced for each designated speed category from the analysis results. CONCLUSIONS : It is expected that more accurate capacity values can be estimated for freeway sections under nighttime conditions by applying the resulting adjustment factors. In addition, traffic safety will be improved through the increased efficiency of traffic management on these freeway sections.

Capacity-Filtering Algorithm based Release Planning Method for TFT-LCD Fab (생산능력 필터링 알고리즘 기반의 TFT-LCD Fab 투입계획 생성 방법론)

  • Son, Hak-Soo;Lee, Ho-Yeoul;Choi, Byoung-Kyu
    • IE interfaces
    • /
    • v.22 no.1
    • /
    • pp.1-9
    • /
    • 2009
  • As the LCD fabrication factories (Fab) are highly capital-intensive and the markets are very competitive, it is an essential requirement of operational management to achieve full-capacity production while meeting customer demands on time. In a typical LCD Fab, medium-term schedules such as release plans and production plans are critical to achieve the goal of full-capacity production and on-time delivery. Presented in this paper is a framework for weekly planning system generating medium-term schedules using a finite-capacity planning method. Also this paper presents a release planning method applying capacityfiltering algorithm, especially backward capacity-filtering procedure, which is one of the finite-capacity planning methods. In addition, performance analyses using actual data of a TFT-LCD Fab show that the proposed method is superior to existing methods or commercial S/W products generating release plans.

A Network Capacity Model for Multimodal Freight Transportation Systems

  • Park, Min-Young;Kim, Yong-Jin
    • Journal of Korea Port Economic Association
    • /
    • v.22 no.1
    • /
    • pp.175-198
    • /
    • 2006
  • This paper presents a network capacity model that can be used as an analytical tool for strategic planning and resource allocation for multimodal transportation systems. In the context of freight transportation, the multimodal network capacity problem (MNCP) is formulated as a mathematical model of nonlinear bi-level optimization problem. Given network configuration and freight demand for multiple origin-destination pairs, the MNCP model is designed to determine the maximum flow that the network can accommodate. To solve the MNCP, a heuristic solution algorithm is developed on the basis of a linear approximation method. A hypothetical exercise shows that the MNCP model and solution algorithm can be successfully implemented and applied to not only estimate the capacity of multimodal network, but also to identify the capacity gaps over all individual facilities in the network, including intermodal facilities. Transportation agencies and planners would benefit from the MNCP model in identifying investment priorities and thus developing sustainable transportation systems in a manner that considers all feasible modes as well as low-cost capacity improvements.

  • PDF

Optimal Production Capacity and Outsourcing Production Planning for Production Facility Producing Multi-Products (다제품을 생산하는 생산설비에 대해 최적 생산용량과 외주생산계획)

  • Chang, Suk-Hwa
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.35 no.4
    • /
    • pp.110-117
    • /
    • 2012
  • The demand for facility used in producing multi-products is changed dynamically for discrete and finite time periods. The excess or the shortage for facility is occurred according to difference of the facility capacity size and demand for facility through given time periods. The shortage facility is met through the outsourcing production. The excess facility cost is considered for the periods that the facility capacity is greater than the demand for the facility, and the outsourcing production cost is considered for the periods that the demand for facility is greater than the facility capacity. This paper addresses to determine the facility capacity size, outsourcing production products and amount that minimizes the sum of the facility capacity cost, the excess facility cost and the outsourcing production cost. The characteristics of the optimal solution are analyzed, and an algorithm applying them is developed. A numerical example is shown to explain the problem.

Capacity Spectrum Method for Seismic Performance Evaluation of Multi-Story Building Based on the Story Drift (층간변위를 기반으로 한 다층구조물의 내전성능 평가를 위한 역량스펙트럼법의 개발)

  • Kim, Sun-Pil;Kim, Doo-Kie;Kwak, Hyo-Gyoung;Ko, Sung-Huck;Seo, Hyeong-Yeol
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.205-210
    • /
    • 2007
  • The existing capacity spectrum method (CSM) is based on the displacement based approach for seismic performance and evaluation. Currently, in the domestic and overseas standard concerning seismic design, the CSM to obtain capacity spectrum from capacity curve and demand spectrum from elastic response spectrum is presented. In the multistory building, collapse is affected more by drift than by displacement, but the existing CSM does not work for story drift. Therefore, this paper proposes an improved CSM to estimate story drift of structures through seismic performance and evaluation. It uses the ductility factor in the A-T domain to obtain constant-ductility response spectrum from earthquake response of inelastic system using the drift and capacity curve from capacity analysis of structure.

  • PDF

Analysis of Capacity Factors and Capacity Credits for Wind Turbines Installed in Korea (국내 풍력발전 설비의 이용률과 용량크레딧 분석)

  • Paik, Chunhyun
    • Journal of the Korean Solar Energy Society
    • /
    • v.39 no.4
    • /
    • pp.79-91
    • /
    • 2019
  • The capacity credit (CC) is a key metric for mid- to long-term power system capacity planning. The purpose of this study is to estimate the CCs of domestic wind turbines. Based on hourly capacity factor (CF) data during the seven years from 2011 to 2017, the new so-called probabilistic CF scheme is introduced to effectively reflect the variability of CFs on CC estimation. The CCs are then estimated through the CF-based method and the ELCC (Effective Load Carrying Capability) method reflecting the probabilistic CF scheme, and the results are compared. The results show that the CC value 0.019 for domestic wind turbines proposed in the $8^{th}$ Basic Plan for Electricity Supply and Demand corresponds to the CC with a confidence level slightly lower than 95%.

Optimal Buffer Allocation in Multi-Product Repairable Production Lines Based on Multi-State Reliability and Structural Complexity

  • Duan, Jianguo;Xie, Nan;Li, Lianhui
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.14 no.4
    • /
    • pp.1579-1602
    • /
    • 2020
  • In the design of production system, buffer capacity allocation is a major step. Through polymorphism analysis of production capacity and production capability, this paper investigates a buffer allocation optimization problem aiming at the multi-stage production line including unreliable machines, which is concerned with maximizing the system theoretical production rate and minimizing the system state entropy for a certain amount of buffers simultaneously. Stochastic process analysis is employed to establish Markov models for repairable modular machines. Considering the complex structure, an improved vector UGF (Universal Generating Function) technique and composition operators are introduced to construct the system model. Then the measures to assess the system's multi-state reliability and structural complexity are given. Based on system theoretical production rate and system state entropy, mathematical model for buffer capacity optimization is built and optimized by a specific genetic algorithm. The feasibility and effectiveness of the proposed method is verified by an application of an engine head production line.

An approximation of the M/G/1 system with finite workload capacity (대기 부하량에 제한이 있는 M/G/1 시스템의 근사법)

  • Lee Hyeong Jung;Kim Jeong Gi;Heo Seon
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2003.05a
    • /
    • pp.247-251
    • /
    • 2003
  • In this paper, we propose an approximation of the M/G/1 system with finite workload capacity, where customers whose admission to the system would increase the workload beyond a prespecified finite capacity limit are not accepted. Our approximation method is based on the idea that the service time of a customer in the M/G/1 system can be approximated as the sum of service times of a batch of customers in the $M^{X}/d/1$ system where the service time is deterministic and very small. That is, the original service time is discretized and approximated by the batch size. We exemplified our method by obtaining the average workload of the M/M/1 system by means of the $M^{X}/d/1$ system, where the batch size is geometric. In addition, the approximate blocking probabilities of the M/M/1 and $M/E_{k}/1$ system with finite workload capacities are sought. The proposed method turns out to give a good approximation, which is compared with a simulation.

  • PDF

Effects of Performance Analysis of a Desiccant Cooling System with a Direct Evaporative Cooler in the Inlet of Regeneration Process (재생입구 직접증발냉각기 적용이 제습냉방시스템 성능에 미치는 영향)

  • Dash, Ulziiutas;Sung, Sang-Chul;Oh, Myung-Do;Lee, Dae-Young
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.22 no.5
    • /
    • pp.328-335
    • /
    • 2010
  • The purpose of this study is to make an analysis of influence on the cooling capacity and COP of a desiccant cooling system with a regenerative evaporative cooler when a direct evaporative cooler was applied to the inlet of regeneration process of this system. We used cycle simulation in order to analyze the performance of this system. From the cycle simulation, we knew that the optimal rotation time of desiccant rotor was between 160s and 220s and hardly ever affected cooling capacity of desiccant cooling system when this system was operated at the outdoor air condition of $35^{\circ}$ and 40% RH and low regeneration temperature of $60^{\circ}$. Also there was optimal area ratio of regeneration to dehumidification between 0.7 and 1.0. Our results showed that it had a small effect on the system’s cooling capacity to install direct evaporative cooler at the inlet of regeneration process.

Performance analysis of dual source heat pump system with single unit dual source evaporator (SUDS증발기를 사용한 2중열원 열펌프의 성능해석)

  • 우정선;이세균;이재효;박효순
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.11 no.3
    • /
    • pp.391-400
    • /
    • 1999
  • The efficiency and capacity of an air source heat pump system decrease as the ambient temperature drops. One strategy of avoiding the decrease of the efficiency and capacity in air source heat pump system is to switch to another thermal energy source. Water can be a good candidate for the heat source. This paper presents the results of the performance analysis of heat pump system with a single unit dual source(SUDS) evaporator The heat exchanger combines two separated evaporators into a single evaporator and the object of the SUDS evaporator is to recover energy from dual heat sources, i.e. air and water. Simulation program is developed for the dual source heat pump system with a SUDS evaporator and experimental data are obtained and compared with the simulation results. Differences in heating capacity and COP are 7% and 8% respectively. Simulation results are in good agreement with the test results. Therefore, the developed program is effectively used for the design and performance prediction of the dual source heat pump system with a SUDS evaporator.

  • PDF