생산능력 필터링 알고리즘 기반의 TFT-LCD Fab 투입계획 생성 방법론

Capacity-Filtering Algorithm based Release Planning Method for TFT-LCD Fab

  • 손학수 (한국국방연구원 국방운영연구 센터) ;
  • 이호열 (KAIST 산업 및 시스템 공학과) ;
  • 최병규 (KAIST 산업 및 시스템 공학과)
  • Son, Hak-Soo (Center for Resource and Manpower Management, KIDA) ;
  • Lee, Ho-Yeoul (Department of Industrial and Systems Engineering, KAIST) ;
  • Choi, Byoung-Kyu (Department of Industrial and Systems Engineering, KAIST)
  • 투고 : 2009.01.13
  • 심사 : 2009.01.21
  • 발행 : 2009.03.01

초록

As the LCD fabrication factories (Fab) are highly capital-intensive and the markets are very competitive, it is an essential requirement of operational management to achieve full-capacity production while meeting customer demands on time. In a typical LCD Fab, medium-term schedules such as release plans and production plans are critical to achieve the goal of full-capacity production and on-time delivery. Presented in this paper is a framework for weekly planning system generating medium-term schedules using a finite-capacity planning method. Also this paper presents a release planning method applying capacityfiltering algorithm, especially backward capacity-filtering procedure, which is one of the finite-capacity planning methods. In addition, performance analyses using actual data of a TFT-LCD Fab show that the proposed method is superior to existing methods or commercial S/W products generating release plans.

키워드

참고문헌

  1. Choi, B.K. and Seo, J. C. (2008), Capacity-FilteringAlgorithmfor Finite Capacity Planning of a Flexible FlowLine, International Journal of ProductionResearch, 18 February 2008,DOI : 10.1080/00207540701644201(Published onOnline)
  2. Chung-HsingYeh(2000), Acustomer-focused planning approach tomake-to-order production, Industrial Management andData Systems, 100(4), 180-187 https://doi.org/10.1108/02635570010328693
  3. DavidHsieh (2007), TFT LCDMarketUpdate forKGI Securities,DisplaySearch, Available via http://www.displaysearch.com/cps/rde/xbcr/displaysearch/ 20071025_David_Hsieh_DisplaySearch_TFT_LCD_Update_For_KGI.pdf (accessed October 10, 2008).
  4. i2 Technologies (2006), Factory Planner Guide, Available via http://www.i2.com/assets/pdf/pds_factory_planner_pds7305.pdf(accessedOctober 10, 2008)
  5. James T. Lin, Tzu-Li Chen, and Yen-Ting Lin (2006), A Hierarchical Planning and Scheduling Framework for TFT-LCDProduction Chain, IEEE International Conferenceon ServiceOperations and Logistics and Informatics, 711-716
  6. Jeong, B.,Kim, S. and Lee, Y. (2001), An assemb-ly scheduler for TFTLCDmanufacturing, Computers and Industrial Engineering, 41, 37-58. https://doi.org/10.1016/S0360-8352(01)00041-9
  7. Na,H. J., Baek, J.K.,Kwon, I.H.,Kang, Y.H., andKim, S. S. (2001), The study of production scheduling scheme in TFT- LCDfactory,Proceedings of the2001 KIIE SpringConference, 958-961
  8. Park, B. C, Park, E. S, Kim, B.H., Choi, B.K., and Lee, J.H. (2008), Simulation based Planning and Scheduling System for TFT-LCD Fab, Proceedings of the 2008Winter Simulation Conference, accepted for publication
  9. Song,W., Seo,D.W, Shin,H. J., Baek, J. K., andKim, S. S. (2000), Astudy on integrated production planning and coordination for TFT-LCD factory, Proceedings of the2000 KORMS SpringConference, 566-568.
  10. VMS-Solutions(2006), SeePlan LSE${\circledR}$ Brochure, Available via http://www.vmssolutions.com/(accessed September 20, 2006)