• Title/Summary/Keyword: System Asset

Search Result 580, Processing Time 0.026 seconds

A Study on the Design and Implementation of System for Predicting Attack Target Based on Attack Graph (공격 그래프 기반의 공격 대상 예측 시스템 설계 및 구현에 대한 연구)

  • Kauh, Janghyuk;Lee, Dongho
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.16 no.1
    • /
    • pp.79-92
    • /
    • 2020
  • As the number of systems increases and the network size increases, automated attack prediction systems are urgently needed to respond to cyber attacks. In this study, we developed four types of information gathering sensors for collecting asset and vulnerability information, and developed technology to automatically generate attack graphs and predict attack targets. To improve performance, the attack graph generation method is divided into the reachability calculation process and the vulnerability assignment process. It always keeps up to date by starting calculations whenever asset and vulnerability information changes. In order to improve the accuracy of the attack target prediction, the degree of asset risk and the degree of asset reference are reflected. We refer to CVSS(Common Vulnerability Scoring System) for asset risk, and Google's PageRank algorithm for asset reference. The results of attack target prediction is displayed on the web screen and CyCOP(Cyber Common Operation Picture) to help both analysts and decision makers.

A Study on the Introduction of the Work Breakdown Structure for Infrastructure Asset Management

  • Jeong, Seongyun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.691-692
    • /
    • 2015
  • Several scholars in South Korea have predicted that maintenance costs of social infrastructure will sharply increase from the mid-2020s, and cause budgetary deficits among facilities management agencies. Interest in infrastructure asset management (IAM) is rising as a solution to such problem. In this study, an information system for asset valuation that reflects the salvage value and deferred cost of social infrastructure based on WBS (work breakdown structure) was developed in consideration of IAM. To reuse the construction cost information such as the acquisition cost, the interconnection between CBS (cost breakdown structure) and WBS was considered. Furthermore, asset valuation information was developed with XML schema to facilitate the exchange and reuse of the information among project participants.

  • PDF

A study on Risk-based Bridge Performance Evaluation Method for Asset Management (위험도 개념을 적용한 교량 자산관리의 성능평가방법 연구)

  • Choi, Hyun-Ho;Sun, Jong-Wan;Park, Kyung-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.22-32
    • /
    • 2013
  • Generally, asset management procedure consists of exact information collection, decision of service level, analysis of aspiration level, analysis of financial condition and available budget, preparation of asset management plan, and value of modified asset. In this study, for the risk-based asset management, condition assessment and performance measuring, assessment of failure modes and risks, evaluation/selection of treatment options, and implementation of optimum solution are additionally included. For this, bridge inventory and performance measure considering risks are classified and method of quantitative/qualitative performance measure is suggested. Also, evaluation method of risk analysis for bridge asset management is suggested and basic research is carried out for applicable method of risk-based asset management. Using suggested risk procedure and method of risk-based bridge service level evaluation, it is possible to perform resonable asset management. Moreover, it is concluded that the proposed applicable method of risk-based asset management will provide a solution to contribute the development of systematical asset management for optimal decision making and prototype asset management system.

Intellectual Asset Measurement of Construction Corporation's Knowledge Management (건설기업 지식경영의 지적자산 측정)

  • Son Young-Chan;Baik Jong-Keon;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.3 s.11
    • /
    • pp.94-102
    • /
    • 2002
  • It expresses well result measurement system's the importance that 'It can not manage that can not measure.' In this way, there is no expressivity that express difficulty. While Corporation's tangible asset is possible measuring by specific amount of money of financial statement or loss and gain statement etc, Method of corporation's intangible asset measurement is much had been introduced, but some one is not presenting objective frame. This research did size of construction corporation's intangible Asset(Intellectual Asset) through knowledge asset storing accumulation model(XYZ model) that present in LG economy research institute so that do quantification objectively. Through this, can presume construction corporation's intrinsic value level.

Evaluation Method of Architecture Asset (아키텍처 자산의 평가 방법)

  • Choi, Han-yong
    • Journal of Convergence for Information Technology
    • /
    • v.8 no.5
    • /
    • pp.101-106
    • /
    • 2018
  • Software are being studied to register and manage assets. And Methods for evaluating software systems have been based on subjective evaluation criteria. We propose an evaluation model for evaluating complex assets obtained from the complexity measurement of the preceding asset management system. We used scales to measure and provide logical complexity to measure the complexity of our architectural assets. And we used a method to evaluate whether it expresses attribute value of architecture asset. We have also built an evaluation model criterion for evaluating the usability of the asset data based on the ISO/IEC 25010 quality model characteristics of the SQuaRE Series. When the designers design the asset as a composite asset, the optional evaluation of the negative property that weights are assigned according to the characteristics of each asset is applied to secure the flexibility of the evaluation model.

A Study on the Fire Fighting General Index for Fire Fighting of Crowded Wooden Building Cultural Asset (군집 목조 건축문화재의 화재대응을 위한 소방방재 종합지수 연구)

  • Kwon, Heung-Soon;Lee, Jeong-Soo
    • Journal of architectural history
    • /
    • v.21 no.2
    • /
    • pp.37-52
    • /
    • 2012
  • This research has set up the fire fighting general index for Fire fighting of Crowded Wooden Building Cultural Asset which is composed of traditional wooden building instinct or complex. The results of this study are as follows. First, Fire fighting general index for crowded wooden building cultural asset, it is necessary to set fire fighting priority by considering fire risk and cultural asset characteristic and establish the system to cope with fire disaster in the most effective way by arranging facilities with restricted resource. Second, Fire risk is the index to draw fire and spread risk of cultural asset by applying index calculation processes such as fire load, burning velocity and ignition material spread characteristic to various aspects such as individual building and complex and combining their results. Cultural asset importance index consists of individual building evaluation, publicity security degree, area importance evaluation and historical landscape degree evaluation. Third, for each index combination process, weight of each index is drawn on the basis of AHP analysis result that is performed to the specialists of related fields. The formula to apply and combine it is prepared to apply the model to include meaning of each index and comparative importance degree.

The Effects of Permanent Income and Non-Human Capital Asset on the Housing Tenureship (항상소득과 비인적자산이 주택점유에 미치는 영향)

  • Lee, Chae-Sung
    • Journal of the Korean housing association
    • /
    • v.20 no.4
    • /
    • pp.69-78
    • /
    • 2009
  • The purpose of this study is to identify which is the better indicator to forcast housing tenureship between permanent income and current income, and study the effects of non-human capital asset on housing tenureship. To forcast permanent income, a statistic regression equation is used with current income as the dependent variable. Multi-nomial logistic model is used to forcast the housing tenureship Using current income as the dependent variable delivered a more accurate result than using permanent income. Current income is used as a dependent variable and sex, age, education and occupation are used as independent variables to forcast permanent income. Non-human capital asset is also used as an independent variable. Also, excluding non-human capital asset variable when forcasting bothe permanent income and housing tenureship proved to be more accurate. Because permanent income, the sum of future income and current asset, is a good indicator of current consumption including housing, the result with permanent income should be more accurate than the forcast using current income. This implies an underdevelopment of a housing mortgage system that enables people to consume now on the basis of their future income. The Korea's unique Chonsei housing rental system has also made it difficult to forcast housing tenureship based on people's permanent income and asset. While, the Key-money of Chonsei housing and the housing asset of homeowners with debt are very similar in their amount, the result is completely different. One is a renter and the other is a homeowner.

Design of Architecture for Collaborative Project Management System based on Business Process (프로세스 기반의 협업 프로젝트 관리 시스템 구조 설계)

  • Baek, Jae-Yong;Jung, So-Young;Kim, Bo-Hyun;Yoo, Seock-Kyu;Lee, Seok-Woo;Choi, Hon-Zong
    • Korean Journal of Computational Design and Engineering
    • /
    • v.14 no.5
    • /
    • pp.338-345
    • /
    • 2009
  • c-PMS(collaborative project management system) is a business process(BP) based tool to manage collaborative projects which accomplish common business objectives determined by mutual agreement of companies using limited resources and time. This study analyzes collaborative BP, collaborative projects, and their relation, and proposes the architecture and operation scenario of c-PMS consisted of business process asset management(BPAM) sub-system and project manage(PM) sub-system. BPAM sub-system models private and public BP using a client/server based modeler, defines collaborative BPs process from public BPs, and manages them as companies' asset on a web portal. PM sub-system globally manages collaborative project using planning, execution, monitoring, and analyzing functions.

A study of determination probability function to the hidden inheritance in SR DEVS (SR DEVS에서 숨겨진 상속에 대한 결정확률 함수의 연구)

  • Park, Sang-Joon;Lee, Jong-Chan
    • Journal of the Korea Society of Computer and Information
    • /
    • v.20 no.1
    • /
    • pp.137-142
    • /
    • 2015
  • In the object inheritance of SR DEVS, partial or overall asset inheritance can be possible. To a asset inherited from parent object, by respective dedicated function a child object can implement partial or whole asset, or not. Even though a child has a inherited asset, if the asset is the hidden property its implementation will not be provided. A inherited asset cannot be showed in whole asset implementation, or it can be implemented by special system state. Here, the whole asset implementation means may include time parameter. In this paper, we describe a determination probability scheme for partial or whole asset inherited from the parent object to determine the hidden inheritance. By the determination probability function it is decided that the inherited asset will be hidden or normal asset.

Development of Network Level Management System of Road Facilities Based on the Asset Management Concept (자산관리개념을 접목한 네트워크 방식의 도로시설물 유지관리시스템 개발)

  • Ji, Seung Gu;Seo, Jong Won
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.4
    • /
    • pp.146-154
    • /
    • 2011
  • Recently, the paradigm of social infrastructure investment has been changed from new construction to maintenance and management. As a consequence, the management and maintenance system of existing highway facilities needed an innovation involving the concept of asset management. This paper discusses the new facility management system suitable to local highway agencies. The new system incorporates asset management concept so that it can analyze the network level facility management solution and it can also improve the budget efficiency for local government. This paper also presents systematic method to integrate various facilities for management system.