Abstract
Generally, asset management procedure consists of exact information collection, decision of service level, analysis of aspiration level, analysis of financial condition and available budget, preparation of asset management plan, and value of modified asset. In this study, for the risk-based asset management, condition assessment and performance measuring, assessment of failure modes and risks, evaluation/selection of treatment options, and implementation of optimum solution are additionally included. For this, bridge inventory and performance measure considering risks are classified and method of quantitative/qualitative performance measure is suggested. Also, evaluation method of risk analysis for bridge asset management is suggested and basic research is carried out for applicable method of risk-based asset management. Using suggested risk procedure and method of risk-based bridge service level evaluation, it is possible to perform resonable asset management. Moreover, it is concluded that the proposed applicable method of risk-based asset management will provide a solution to contribute the development of systematical asset management for optimal decision making and prototype asset management system.
일반적인 사회기반시설물 자산관리 절차는 기존 자산의 명확한 정보획득, 서비스수준의 설정, 요구수준의 분석, 재정상태와 가용예산의 분석, 자산관리 계획의 준비, 수정된 자산의 정보 획득 순으로 구성될 수 있다. 본 연구에서는 실제적인 위험도분석 기반의 개선된 교량 자산관리를 위하여 필요한 상태평가 및 성능측정, 성능척도의 설정, 파손형태 및 위험도 분석 등에 대한 방법론을 제시하였다. 보다 효율적인 교량 관리를 위하여 위험도 고려가 필요한 교량 기본현황정보 및 성능척도 항목을 설정하였고, 정량적 정성적 위험도를 고려한 성능평가방법을 제안하였다. 위험정도와 발생가능성을 고려한 위험도 매트릭스를 이용한 성능평가방법은 교량의 서비스수준을 보다 합리적으로 추정할 수 있다. 제안된 위험도분석 절차와 방법이 접목된 교량 서비스수준 평가방법을 이용하면 보다 합리적인 자산관리 의사결정이 가능하며, 향후 최적의 유지관리 의사결정을 위한 자산관리 체계구축 및 시스템 개발에 기여할 수 있을 것으로 판단된다.