• Title/Summary/Keyword: Support Projects

Search Result 1,235, Processing Time 0.025 seconds

A Case Study of Housing Regeneration Projects in Yonnam-dong and Buk Gajwa-dong, Seoul: The Determinants of Satisfaction of Elderly Residents (정비예정구역 해제지역 재생사업의 정비요소와 고령거주자의 사업 만족도 간의 영향관계 사례연구 - 서울시 연남동, 북가좌동 시범사업지를 중심으로 -)

  • Kim, Ah-Leum;Koo, Ja-Hoon
    • Journal of the Korean housing association
    • /
    • v.27 no.5
    • /
    • pp.11-23
    • /
    • 2016
  • The purpose of this study is to establish the determinants of satisfaction with the results of housing regeneration projects among their elderly residents, and to suggest the political implications. The survey included questionnaires about satisfaction levels with the projects' physical and non-physical maintenance factors. The results were statistically analyzed by correlation analysis and PLS regression analysis. As a result of the study, firstly, the physical factors rather than non-physical factors (such as home improvement and management support, community support, the economic foundations and professional support) were found to have a large effect on elderly residents' satisfaction. Secondly, the non-physical factors, such as economic factors were analyzed among senior job offers that are both highly influential in the two regions Yonnam-dong and Bukgajwa-dong. Finally, electrical maintenance work, tree planting, a "Green" parking plan, or refuse the effect of visually larger landscape improvement, such as bins installed, maintenance of local factors that contribute to the greenery of the area were judged to be important.

AR-based 3D Digital Map Visualization Support Technology for Field Application of Smart Construction Technology

  • Song, Jinwoo;Hong, Jungtaek;Kwon, Soonwook
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1255-1255
    • /
    • 2022
  • Recently, research on digital twins to generate digital information and manage construction in real-time using advanced technology is being conducted actively. However, in the construction industry, it is difficult to optimize and apply digital technology in real-time due to the nature of the construction industry in which information is constantly fluctuating. In addition, inaccurate information on the topography of construction projects is a major challenge for earthmoving processes. In order to ultimately improve the cost-effectiveness of construction projects, both construction quality and productivity should be addressed through efficient construction information management in large-scale earthworks projects. Therefore, in this study, a 3D digital map-based AR site management work support system for higher efficiency and accuracy of site management was proposed by using unmanned aerial vehicles (UAV) in wide earthworks construction sites to generate point cloud data, building a 3D digital map through acquisition and analysis of on-site sensor-based information, and performing the visualization with AR at the site By utilizing the 3D digital map-based AR site management work support system proposed in this study, information is able to be provided quickly to field managers to enable an intuitive understanding of field conditions and immediate work processing, thereby reducing field management sluggishness and limitations of traditional information exchange systems. It is expected to contribute to the improvement of productivity by overcoming factors that decrease productivity in the construction industry and the improvement of work efficiency at construction sites.

  • PDF

Controversial Issues and Policy Alternatives in Promotion of Arts and Culture Grant Program: Focusing on Space and Exhibition Support Project of Visual Arts (문화예술지원사업 추진상의 쟁점과 정책방향 - 시각예술창작산실 공간·전시 지원사업을 중심으로 -)

  • Ko, Jeong-Min;Jang, Shinjeung;Chang, Yoonjeong
    • Korean Association of Arts Management
    • /
    • no.52
    • /
    • pp.39-73
    • /
    • 2019
  • The purpose of this study is to explore the issues and alternatives in the promotion of space and exhibition support projects in visual arts, and to suggest an applicable direction of the government grant program. For this study, FGI and in-depth interviews were conducted in the direct beneficiaries of the grant program, the staff of the grant program, and the group of visual arts expert. As a result, the deliberation and selection of the support project should be carried out with sufficient time in consideration of the specificity of the support project. And the project requires to divide into two kinds of the projects based on the understanding of the social role and differentiation of non-profit exhibition spaces and private art museums. For the grant application and assessments, a long-term support is necessary to bring the capability and issues in efficient allocation of the budget, flexibility of budget item, and the budget shortfalls. Furthermore, the reliability between the grant program and beneficiaries needs to form a healthy partnership, and the evaluation criteria and eNARADOEUM system should be more practical and rationally established. Through this analysis, the implications of understanding the specificity of visual arts support projects, establishment of sustainable visual arts creation policies, and budget utilization were derived. Consequently, cultural and artistic support projects were directed to place more emphasis on efficiency than control, direction considering the position of consumers than suppliers, and long-term business planning rather than short-term perspective.

A Study for Improving Overseas Forestation System to Cope with the UN Framework Convention on Climate Change (기후변화협약에 대응한 해외조림사업 추진체계 개선방안)

  • Moon, Hee-Cheol;Lim, Young-Se
    • International Commerce and Information Review
    • /
    • v.9 no.1
    • /
    • pp.355-379
    • /
    • 2007
  • With the effectuation of United Nations Framework Convention on Climate Change(UNFCCC) and Kyoto Protocol in 2005, ever growing concern on the importance of overseas forestation is diffusing worldwide. However, fierce international competition to secure overseas forestation sites, inherent uncertainty in UNFCCC or overseas forestation projects, and imbalances among policies on overseas natural resources development make it difficult to realize Korean long-term overseas forestation objective to secure 1 million ha by 2050. In view of necessity of overseas forestation projects for sustainable forest management and securing sinks of carbon to mitigate climate change, various efforts to reform current Korean overseas forestation systems are required. This study suggests several alternatives to improve current Korean overseas forestation systems including expanding financial support for overseas forestation projects, cultivating overseas forestation experts, establishing official organization for overseas forestation, constructing effective support system for overseas forestation projects, fostering international cooperation in the field of forest resources, and so on. Many theoretical, empirical or policy-oriented studies on the influences of UNFCCC and countermeasures on it in various Korean industries should follow this study.

  • PDF

Effects of Government Business Support Projects on Corporate Growth : Focusing on the moderating effect of growth stage and use of government support (정부 기업지원 사업이 기업성장에 미치는 영향 : 성장단계 및 정부지원 활용의 조절효과를 중심으로)

  • Kim, Su gil;Hyun, Byung-Hwan
    • Journal of Technology Innovation
    • /
    • v.31 no.2
    • /
    • pp.333-369
    • /
    • 2023
  • In this paper, the effect of government corporate support projects on corporate growth was analyzed, and the effect on corporate financial performance or non-financial performance was empirically analyzed by using the growth stage as a modulating variable in government support activities. As a result, it was analyzed that government corporate support had a significant effect on financial performance, non-financial performance, and use of government support, and that the moderating effect of the growth stage had a positive (+) effect on both financial and non-financial performance. Taken together, the research results showed that government corporate support had a positive effect on corporate performance, the growth stage had a positive (+) effect on both financial and non-financial performance, and the impact on financial performance was even greater. Accordingly, government support projects must be supported according to each company's growth stage, and during the decline, companies need to provide customized support according to the state of the company through industry and corporate analysis, and it is expected to be meaningful to improve the efficiency of the government's business support project.

The Effect of Government Star-up Support Project on Business Performance: Focused on the Mediating Effects Start-up Satisfaction (정부의 창업지원사업이 경영성과에 미치는 영향: 창업만족의 매개효과를 중심으로)

  • Hwang, Gyun Jeong;Qing, Cheng-lin
    • Journal of Digital Convergence
    • /
    • v.19 no.6
    • /
    • pp.85-90
    • /
    • 2021
  • This research focused on four areas of government-sponsored start-up support projects: facility support, funding, education support, and mentoring support, and examined the effects of business performance and the mediating effects of business start-up satisfaction. As a result of the analysis, it was verified that the facilities, education, funds and mentoring support of the start-up support project had a positive effect on the business performance of the founders, and the partial mediating role of the start-up satisfaction was also verified in the relationship between the start-up support project and the business performance. Based on these results, it was confirmed that support programs such as facilities, education, funds, and mentoring in government-sponsored start-up support projects are suitable factors to improve the business performance of founders. Finally, the implications of this study were presented and the limitations of the study and future research directions were discussed.

Suggestions on the Estuarine Research Projects for Integrated Estuarine Management in Korea (통합적 하구관리 지원을 위한 우리나라 하구역 연구사업 현황과 정책방향 제언)

  • Cho, Hyun-Jeong;Ryu, Jong-Seong;Lee, Kang-Hyun;Lee, Bum-Yeon;Kang, Dae-Seok;Khim, Jong-Seong;Nam, Jung-Ho;Lee, Chang-Hee
    • The Sea:JOURNAL OF THE KOREAN SOCIETY OF OCEANOGRAPHY
    • /
    • v.16 no.4
    • /
    • pp.212-222
    • /
    • 2011
  • Estuaries have been used competitively and exploited for the past decades in Korea. To preserve the environment of the estuaries from the integrated perspective, new policies have started to change such exploitative development in 2000s. Due to the poor knowledge-base, however, there has been a lack of support system which enables to execute such policies effectively. The present study was conducted to figure out the limits of the estuarine management research projects in Korea, which is being performed to overcome these limitations. It was studied through Gap Analysis between domestic and foreign advanced practices as well as Analytical Hierarchy Process on expert survey in terms of the three aspects: how well the estuarine management research projects in Korea meets the demands of policy making and administration; raises the awareness of citizens about the merit of environmental preservation; and establishes knowledge-based support system. This project turned out to reflect adequately the development of programs for building estuarine management systems. But consideration of other ministries was relatively scarce. But the contents which directly support community-based activities and educational programs to improve citizens' awareness were judged to be insufficient. According to the results of Gap Analysis, research about the structure and function of estuarine ecosystems, which can support to develop policy alternatives in detail, was relatively more necessary. Therefore, to support estuarine policy management effectively, the development of a realistic plan, which can overcome fundamental issues inherent in the Korean environmental management system and the limitation of the estuarine management research projects in Korea itself, is needed.

The Study on the Satisfaction Factors of the Support Projects for the Adjacent Residents to Multipurpose Dams (다목적 댐주변지역지원사업 고객만족에 미치는 영향 요인 연구)

  • Kim, Shang Moon;Lee, Byungchul
    • Journal of Korea Water Resources Association
    • /
    • v.46 no.4
    • /
    • pp.335-343
    • /
    • 2013
  • Multi-purpose dams are regarded to contribute to the Korean society not only positive affects but also negative ones. Especially, negative considerations are usually prevailed around multi-purpose dam sites and their vicinities even though the Government adopted "act on dam construction and assistance, etc. to neighborhood area" in 1989 and has supported many various projects since 1990. Nevertheless, many arguments and controversies about effects of multi-purpose dams and support projects to vicinities" have happened so frequently and sometimes brought a suit against government. These situations imply that support projects are not so sufficient to fulfil peoples' expectations. Therefore, this research figured out the key factors that affected residents' satisfaction about multi-purpose dams and support projects. The results of the research are as follows: 1) 'social necessity of dams', 'rationality of the process in supporting project' and 'appropriateness of supporting project', were statistically significant to 'customer satisfaction'; 2) among these factors, 'rationality of the process in supporting project' was the most related to 'customer satisfaction': 3) 'appropriateness of supporting project', 'social necessity of dams' were also revealed as second third factors that relate to the satisfaction.

Analyzing The Types of Policy Support Used by Venture-Backed Startups (벤처투자를 유치한 창업 기업의 정책지원 이용 유형 분석)

  • Jaesung James Park
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.18 no.4
    • /
    • pp.177-191
    • /
    • 2023
  • This study analyzes the types of linkages between major projects used by firms that attracted venture capital among firms that received government support in the field of SME startups. It identifies the types of linkages between support programs related to attracting venture investment and verifies the usefulness of integrated and cooperative support. The main findings of this study are as follows. First, Startup Success Packages, Startup Foundation Funds*, Youth Entrepreneurship Centers, and Training are the main programs used by startups and venture firms, and support-implementing agencies use these programs to provide support for each stage of growth. Second, the majority of startups and venture firms receiving policy support for job creation and manpower enhancement projects. Third, export-type growth companies receive continuous support from MSS, MOTIE, MSIT, and KIPO. Fourth, job creation programs drive the employment performance and creation of companies. Fifth, local government support projects tend to rely heavily on central government support programs. Sixth, growth companies in the startup and venture sector have a clear link to credit guarantee scheme by KIBO. These findings provide empirical evidence on the necessity and feasibility of integrated and collaborative support, and are expected to contribute to the direction of better support policies.

  • PDF

A Study on Predicting Construction Cost of School Building Projects Based on Support Vector Machine Technique at the Early Project Stage (Support Vector Machine을 이용한 교육시설 초기 공사비 예측에 관한 연구)

  • Shin, Jae-Min;Park, Hyun-Young;Shin, Yoon-Seok;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.153-154
    • /
    • 2012
  • The accuracy of cost estimation at an early stage in school building project is one of the critical factors for successful completion. So many method and techniques have developed that can estimate construction cost using limited information available in the early stage. Among the techniques, Support Vector Machine(SVM) has received attention in various field due to its excellent capacity for self-learning and generalization performance. Therefore, the purpose of this study is to verify the applicability of cost prediction model based on SVM in school building project at the early stage. Data used in this study are 139 school building cost constructed from 2004 to 2007 in Gyeonggi-Do. And prediction error rate of 7.48% in support vector machine is obtained. So the results showed applicability of using SVM model for predicting construction cost of school building projects.

  • PDF