• Title/Summary/Keyword: Successful Project

Search Result 899, Processing Time 0.031 seconds

A Study on Agricultural Extension of Doi Chaang Coffee Complex in Thailand (태국 도이창 커피단지의 농촌지도에 관한 조사연구)

  • Choe, Pyeong-Ik;Kim, Myung-Hee
    • Journal of Agricultural Extension & Community Development
    • /
    • v.16 no.1
    • /
    • pp.51-67
    • /
    • 2009
  • This study was carried out to investigate the major factors of the successful development of Doi Chaang Coffee Complex, Chiang Rai of Thailand. Data were gathered through field survey, library research and internet so on. Interviews were conducted with specialist, community leaders, board member of Doi Chaang Coffee Company from 14 to 19, January 2007. The major factors for the successful development observed were as follows: 1) Successful selection of crops and farming system(SALT) with regards of slopes and meteorological condition; 2) Leadership of the King of Thailand and the chief of Akha in terms of attitudinal change of hill-tribes in agriculture extension; 3) supporting by Royal Project Foundation; 4) Quality control through post harvest management by cooperative system; 5) Cooperation between the Coffee Producers' Cooperatives of Thailand and for the international Doi Chaang Coffee Corporation of Canada in terms of fair trade and so on.

  • PDF

On the Development of Reference Guidelines for Self-evaluation of Organization's Systems Engineering and Project Management Capability (조직의 SEPMC 자체 평가에 유용한 참조기준 개발)

  • Choi, Young Gil;Lee, Jae Chon
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.8 no.2
    • /
    • pp.27-36
    • /
    • 2012
  • In modern systems, the operational capability of the system to the user needs is expanding rapidly to accommodate the size of the system, functionality, and interfaces are becoming increasingly complex. Accordingly, the systematic practice of project management and systems engineering in the system development process, as an important element in successful systems development is recognized. EIA/ANSI 632, ISO/IEC15288, the leading international standard for systems engineering and is the leading international standard on project management PMBOK. CMMI is also contains information about the activities of project management and systems engineering and worldwide basis to assess the maturity of an organization's ability to develop system being used. But CMMI model is too complex of structure and there are many overlap parts of contents. So there are many problems for members of organization understanding all of CMMI model, applying organization and, achieving improvement activity. In this study, through the analysis and integration between the model and the related standard coverage activities essential for successful systems development in organizations that require systems engineering and project management capabilities(SEPMC) for self-assessment and continuous improvement activities to provide useful reference guideline.

An Information System Implementation Case Research on Korea Train eXpress (고속철도에 있어서의 정보시스템 구현 사례에 대한 연구)

  • Lee, Sung-Ho;Ahn, Joong-Ho
    • Information Systems Review
    • /
    • v.7 no.2
    • /
    • pp.1-21
    • /
    • 2005
  • Integrated Railroad Information System(IRIS) Construction Project is one of the super projects in Korea required to invest over 100 billion won and 10,000 engaged manpower until Dec 30, 2004. Composition of this paper is as follows; firstly, examined individual contents and aspects of IRIS, and studied formality and contents that have been based to project methodology for successful propulsion of project in overall situation of SI project progress until present. Secondly, presented for construction background of IRIS as well as Project Management and Project Development Methodologies. Thirdly, described each characteristic and development substance for individual systems after present whole contents and system image of the system. Finally, presented successful propulsion result of this project and development directions. We presented development example laying stress on IRIS's Project contents and propulsion circumstances. Evaluation about operation results should be analyzed and studied in detail operating system from now on.

A Study on the Current Status and Improvement of BIM in the Government Owner Perspective - Focus on the KEPCO Na-Ju Head Office Project - (공공시설 발주자 관점에서의 BIM 적용 현황 및 개선방안 연구 - 한국전력공사 나주 신사옥 건립공사 사례를 중심으로 -)

  • Sim, Gu-Sik;Kim, Sung-Man;Ahn, Jae-Hong
    • Journal of KIBIM
    • /
    • v.3 no.2
    • /
    • pp.19-27
    • /
    • 2013
  • The application of the BIM for the KEPCO' new headquarters in Naju involved alternative approaches and accompanied many trials-and-errors as the project adopted new targets and purposes that were not used in Korea before. In particular, for a large BIM-based project, clearly defining the BIM-including the objective, scope and the outcome-is critical for a project owner. For a successful implementation, project owners should improve the utilization of the BIM. Against this background, this research examines the case of the BIM application for the KEPCO' new headquarters in Naju, identifies its effects and problems, and proposes how to improve application of the BIM for public projects. The improvement in the BIM application can be divided into several stages: project order, design development, construction, and post-construction maintenance. In the initial stage, it is important to fully discuss the project planning among participants, and clarify the goal, scope, expected outcomes and role of the BIM. In the design stage, the level of detail (LOD) for the 3D model should be defined in consideration of information use in the stages of estimation and construction. In the construction stage, the scope of project that is managed based on the processing and use of the BIM data should be clearly given and understood. After construction is complete, measures should be sought to use the BIM for maintenance, and corresponding requirements and outcomes should be provided. The analysis is expected to provide basic data for successful implementation of BIM-based public projects, by assisting project owners and involved parties in enhancing work in different stages of a project.

Reaching Beyond the Science Education Guidelines: Project-Centered Approaches

  • Son, Yeon-A;Shin, Young-Joon;Lee, Yang-Rak;Choi, Don-Hyung
    • Journal of The Korean Association For Science Education
    • /
    • v.24 no.1
    • /
    • pp.29-47
    • /
    • 2004
  • Two project-centered secondary school programs were studied as part of an effort to elucidate successful components for science reform-based curriculum development. The Teachers for Exciting Science (TES), and Foundational Approaches in Science Teaching (FAST) programs in Korea and U.S., respectively, are project-centered programs because their curricula are centered on the activities initiated and engaged in by the students. Students serve as principal investigators in their projects, and teachers serve as guides. Both programs were analyzed based on criteria such as curriculum design, teaching, lives of students, lives of teachers, evaluation of program, from the Third International Mathematics and Science Study (TIMSS). In the programs, teachers and students directed the development of curricula and their implementation. Students assumed teacher roles as mentors of other students. And emphasis was on development of communication skills through student-delivered talks and written papers, and professional development of teachers as educators and scientists. Participation in TES stimulated secondary school student interest in science, encouraged inquiry thinking, increased achievement in learning science, and promoted better awareness of science related to real life. FAST students practice laboratory and field techniques, experimental design, hypothesis formation, generalization, and practical implications of research as academic and applied disciplinarians. These project-centered programs have been successfully implemented in field, lab, and classroom curricula for secondary science education. Comparison of these programs will provide an opportunity for identifying key elements instrumental in successful implementation of guidelines for science education, as measured through successful outcomes.

Assessing the Impacts of Project Interfaces in Construction Works in Nigeria

  • Okebugwu, Onyinyechi Francesca;Omajeh, Enoch Oghene-Mairo
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.1
    • /
    • pp.20-25
    • /
    • 2015
  • Interface management problems inherent in construction projects hamper their successful delivery. Therefore, this study aimed at determining the most important project interfaces in construction works in Nigeria in terms of most significant potential impacts, so that management attention are objectively focused on potential highest impacting project interfaces. From a review of literature, 28 project interfaces management issues were identified and categorized. Structured questionnaires were used to collect data concerning the impact (estimated losses to the project in terms of cost) and probability of occurrence of the identified interfaces. The interfaces were ranked using their computed Matrix Scores (MS). The results reveal that "project-workers interfaces problem manifested in use of inappropriate mixes" is the highest impacting. A ranking of the interface categories also reveal that the interfaces at the execution phase of a project (MS = 1226.79) are those that could result in the highest losses to the project.

Considering Claim Costs in Project Time-Cost Mixed Integer Programming Model (클레임코스트를 고려한 프로젝트의 시간-비용 혼합정수계획모형)

  • Kim, Jong-Yul;Kang, Chang-Wook;Hwang, In-Keuk
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.3
    • /
    • pp.97-105
    • /
    • 2011
  • Previous researches have focused on the efficiency of project execution and the satisfaction of internal customers In view of the fact that a project is successful if any defects are not found in the short-term performance test of the project final outcome. To execute a project that both internal customer and external customer are satisfied in terms of longer-term benefit perspective, the project claim costs (PCC) which may occur for the warranty period of the project final outcome should be considered. We propose a model included PCC to the linear programming between time and cost to expedite a project and perform the validity test by applying the model to an example project. This model and related procedure will contribute to overall project activities' cost reduction by taking preventive actions for PCC.

Evaluation System for Defense IT Project in Korea: Post-Implementation Stage

  • Lee, Sangho;Song, Chong-Hyun
    • Journal of Multimedia Information System
    • /
    • v.5 no.4
    • /
    • pp.291-297
    • /
    • 2018
  • Performance measurement is not an easy task. However, it is necessary to measure the expected value of the informatization project to be invested, to help the successful progress of the informatization project, and to confirm the result of the informatization project. This study describes the evaluation systems of the defense informatization project in Korea used after the end of the informatization project (post-implementation evaluation stage). In the post-implementation evaluation stage of proposed system, the informatization project is evaluated in terms of performance achievement, project plan compliance, project management, and economic validity. For each element, this study suggests metrics and practical measurement method. With metrics and their method, it can be evaluated which project is better than others. Moreover, the lessons learned can be developed. Under scarce budget condition, defense organizations can make better performance from IT project with the evaluation system suggested in this study.

The Development Strategies of Very High Speed Train in Korea (한국형 초고속 전철의 연구개발 추진전략)

  • Kim, Yong-Joo;Kang, Do-Hyun;Hwang, Don-Ha
    • Proceedings of the KIEE Conference
    • /
    • 1997.07a
    • /
    • pp.352-357
    • /
    • 1997
  • The development of very high speed train system is a complex series of interrelated tasks, many of which have some degree of uncertainty associated with the successful outcome. Successful projects recognize and provide for the major uncertainties and technical unknowns with specific development strategies. The development strategies described in this paper incorporated the experiences of the advanced countries in high speed train technologies, the current technical status of Korean industries and the operating requirements of Korean High Speed Railway.

  • PDF

Global Collaboration During Front End Planning of Capital Projects

  • Gibson, G. Edward Jr.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.15-18
    • /
    • 2015
  • Front end planning is arguably the most impactful process in the successful delivery of capital projects. Organizations expend substantial effort in this planning process, intending to minimize risk and promote project success. This process has been well documented, including critical technical components, as well as the importance of team collaborative components. As organizations continue to pursue large projects with multi-national participation from sponsors, designers, contractors and suppliers, the importance of collaboration on a global scale during front end planning becomes more important, not less. This paper will outline research performed over the past two decades giving the basic components of the process and the value of global collaboration. It will provide guidance to project participants in pursuing successful planning.

  • PDF